| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹13.4 CrAccepted-AOC | ₹13.4 Cr | L-1 | Accepted-AOC Lowest |
| 2 | L-2₹143.8 CrRejected-Finance | ₹143.8 Cr | L-2 | Rejected-Finance Higher Rate |
| 3 | Not Admitted-Fee/PreQual/Technical 796 AZAD NAGAR ROORKEE DISTT HARIDWAR UK | HARIDWAR | UTTARAKHAND | 247667 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹21.6 L
Closing Date
11 Jan 2021, 5:00 pmClosed
Superintending Engineer
Superintending Engineer, Karnal Circle, PWD B N R, Karnal
4- Lanning Panipat (G T Road NH-44) Dahar upto NH-709 (Section GT road upto canal (Carrier Lined Channel) (Honble C. M. announcement No. 22985 dated 28.08.2018) in Panipat Distt. (Constituency-24 Panipat City) (Re-invited)
2020_HRY_154415_1
PWD_PNP_136
Open Tender
Civil Works
545 days
Panipat
Please refer Tender documents.
3 documents required · 3 mandatory
₹20,000
₹21.6 L
Karnal
23 Apr 2021
29 Dec 2020
12 Jan 2021
29 Dec 2020
11 Jan 2021
29 Dec 2020
6 Jan 2021
Amount
Dismantling of road including, soiling and wearing coat, screening and stacking of old serviceable material, complete in all respect. (HSR 24.37).
Earth work excavation in ordinary soil exclusive of compensation of earth. Kassi work undressed involving any horizontal and any vertical lift including breaking of clods. Excavated earth may be reused on berms and disposed off surplus earth with all lead and lift including dressing complete in territorial as per direction of Engineer-in-charge will be incidental to work and nothing will be paid. (NS)
Preparation of sub grade including trenching, rough dressing of spoil, final dressing of earth, to given levels and camber, watering, rolling with road roller, and compacting the bed (HSR 24.1) Note: - In widening portion sub grade will be prepared with the use of Baby roller (HSR 24.1) or width of excavation should be made sufficient wide to accommodate road roller. Extra width required for compaction of sub grade shall not be paid and its expenditure shall be in incidental to the work.
Providing and laying 100 mm thick granular sub base consisting of filter layer confirming to Table 400.1 Grading - III of MORT&H 5th edition, mixing in a mechanical mix plant at OMC, carriage of mix material to the site of work, spreading in uniform layer with motor grader on prepared surface and compacting with vibratory power roller to achieve desired density complete as per clause No. 401 of MORT&H specifications. Note: - 1.Only crushed metal material should be used. No local earth/tibba sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (P1) 2. Material and operation manufacturing shall be approved by engineer (NS)
Providing and laying 100 mm thick granular sub base consisting of drainage layer confirming to Table 400.1 Grading - VI of MoRT&H 5th edition, mixing in a mechanical mix plant at OMC, carriage of mix material to the site of work, spreading in uniform layer with motor grader on prepared surface and compacting with vibratory power roller to achieve desired density complete as per clause. No 401 of MoRT&H specifications. Note:1. Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Material and operation manufacturing shall be approved by engineer (NS)
Providing & laying 75 mm thick (Compacted) stone metal (G-1) 63 to 45mm gauge wearing coat to Water Bound Macadam using screening type 'B' compacting with 3 wheeled steel roller/vibratory roller to achieve the desired density including lighting, guarding barricading and maintenance of diversion etc. as per clause No.404 of MoRT&H specifications of road & bridges (5th Revision) of 2013 as per drawing and design directed by the Engineer complete in all respect. (N.S.) Note: - 1. Only crushed stone metal material should be used. No local earth/ natural occurring sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by engineer.
Providing & laying 75mm thick (Compacted) stone metal (G-II) 53mm to 22.4mm gauge wearing coat to water bound macadam using screening type 'B' compacting with 3 wheeled steel roller/vibratory roller to achieve the desire density including lighting, guarding barricading and maintenance of diversion etc. as per clause No.404 of MORT&H specifications for road & bridge (5th Revision) of 2013 as per drawing and design directed by the Engineer complete in all respects.(N.S.) Note: - 1.Only crushed stone metal material should be used. No local earth/ natural occurring sand shall be used. The material finer than 425 micron shall have zero Plasticity index (PI). 2. Materials to be used and operations of manufacturing shall be approved by engineer.
Providing, laying 100 mm thick spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per MORT&H specification for road & bridge (5th Revision) of 2013 as per drawing and design directed by the Engineer complete in all respects as per clause No.406, (N.S.) Note: - 1. Only crushed stone metal material should be used. No local earth/ natural occurring sand shall be used The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by engineer
Providing and applying primer coat with bitumen emulsion (S.S grade - I) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 Kg/Sqm using mechanical means as per MoRT&H specification for road & bridge (5th Revision) of 2013 as per drawing and design directed by the Engineer complete in all respects as per clause No.502. (N.S.)
Providing and laying tack coat with bitumen VG-10 grade pressure distributor at the rate of 0.30 kg. per sqm. on the prepared bitumen/granular surface cleaned with mechanical broom including cost of bitumen as per clause No.503 (5th edition) 2013 as per MORT&H specification (N.S.)
Providing & laying 50 mm DBM in full width/carriage way using the reclaimed material to the extent of 30% per cent of the required quantity after carrying out necessary checks and evaluation, adding fresh material including rejuvenation as required, grade, level and thickness, all as specified in clause 519. (5th revision) 2013 using bitumen VG-40 (minimum Bitumen's 4.50% i/c bitumen of retrieved material as per job mix formula) using 100-120 TPH batch type hot mix plant with appropriate arrangement for use of RAP, appropriate rollers and with hydraulic paver finisher with sensor control to the required grade The milled material to be used in DBM shall be minimum 80% of the theoretical quantity Note: - If bitumen required more than 4.50% as per job mix formula no extra payment will be paid extra bitumen required will be considered as incidental to work Note: - Before carrying out bituminous work, coating & stripping of bitumen aggregate mix is to be performed in accordance with IS - 6241. If coating and stripping of bitumen aggregate mix is less than 95%, anti-stripping agent will be used by contractor. The anti-stripping agent should conform to the requirement as stipulated in IS 14982 2017. The cost so incurred will be considered as incidental to work and nothing extra shall be payable The type and brand of anti-stripping agent along with procedure shall be approved by SE-in-charge in writing before start of work. A proper record of results be maintained and same shall be submitted along with bills by the contractor 3). Where there is DBM on existing black top, cracks shall be sealed as MORT&H specification 5th revision clause No. 3004.3, which may consists of (i) Fog seal/ or (ii) crack filling and or (iii) patch work repair as required at site in accordance with clause No. 3004.3.2, 3004.3.3 and 3004.2 of MORT&H specification 5th revision respectively. Proper measurement and consumption shall be entered in MB for cracks sealed but no payment on this account shall be made as crack filling is incidental to work.
Providing & laying 80 mm DBM in widening portion only using the reclaimed material to the extent of 30% per cent of the required quantity after carrying out necessary checks and evaluation, adding fresh material including rejuvenation as required, grade, level and thickness, all as specified in clause 519. (5th revision) 2013 using bitumen VG-40 (minimum Bitumen's 4.00% i/c bitumen of retrieved material as per job mix formula ) using 100-120 TPH batch type hot mix plant with appropriate arrangement for use of R.A.P, appropriate rollers and with hydraulic paver finisher with sensor control to the required grade.The milled material to be used in DBM shall be minimum 80% of the theoretical quantity. Note: - If bitumen required more than 4.00% as per job mix formula no extra payment will be paid extra bitumen required will be considered as incidental to work. Note: - Before carrying out bituminous work, coating & stripping of bitumen aggregate mix is to be performed in accordance with IS - 6241. If coating and stripping of bitumen aggregate mix is less than 95%, anti-stripping agent will be used by contractor. The anti - stripping agent should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and nothing extra shall be payable. The type and brand of anti-stripping agent along with procedure shall be approved by SE-in-charge in writing before start of work. A proper record of results be maintained and same shall be submitted along with bills by the contractor. 3). Where there is DBM on existing black top , cracks shall be sealed as MoRT&H specification 5th revision clause No. 3004.3, which may consists of (i) Fog seal/ or (ii) crack filling and or (iii) patch work repair as required at site in accordance with clause No. 3004.3.2, 3004.3.3 and 3004.2 of MORT&H specification 5th revision respectively, Proper measurement and consumption shall be entered in MB for cracks sealed but no payment on this account shall be made as crack filling is incidental to work.
Providing and laying 40 mm compacted thickness of Bituminous Concrete (BC) in one layer with 100 - 120 TPH Batch Type Hot Mix Plant with bituminous binder VG-40 @ 5.4% (minimum) and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher having sufficient screed width so that the BC in full width of the carriage way is laid in single operation without any longititutinal joint with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and with pneumatic tyred roller (PTR) of 12 to 15 tonne weight with a tyre pressure of at least 0.56 MPa and tandem rollers to achieve the desired compaction as per MORT&H specification (Vth revision)-2013 Clause No. 507 complete in all respect. If bitumen required is more than 5.4% as per job mix including waste plastic material no extra payment will be made, Extra bitumen required will be considered as incidental to work. If bitumen required more than 5.4% as per job mix formula no extra payment will be made, extra bitumen required will be considered as incidental to work. Note: - Before carrying out bituminous work, coating & stripping of bitumen aggregate mix is to be performed in accordance with IS - 6241. If coating and stripping of bitumen aggregate mix is less than 95%, anti-stripping agent will be used by contractor. The anti - stripping agent should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and nothing extra shall be payable The type and brand of anti-stripping agent along with procedure shall be approved by SE-in-charge in writing before start of work. A proper record of results be maintained and same shall be submitted along with bills by the contractor. Note: Where there is only BC on existing black top, cracks shall be sealed as MORT&H specification 5th revision clause No. 3004.3, which may consists of (i) Fog seal/ or (ii) crack filling and or (111) patch work repair as required at site in accordance with clause No. 3004.3.2, 3004.3.3 and 3004.2 of MORT&H specification 5th revision respectively. Proper measurement and consumption shall be entered in MB for cracks sealed but no payment on this account shall be made as crack filling is incidental to work.
Providing and laying 25 mm thick mastic asphalt wearing course with paving grade meeting the requirements given in table 500-29, prepared by using mastic cooker and laid to required level and slope after cleaning the surface, including providing antiskid surface with bitumen pre-coated fine- grained hard stone chipping of 13.2 mm nominal size at the rate of 0.005 cum per 10 sqm and at an approximate spicing of 10cm center to center in both directions, pressed into surface when the temperature if surface not less than 100°C protruding 1 mm to 4mm over mastic surface, all complete as per clause 515. (MORT&H No. 5.14)
Dismantling of existing interlocking paver blocks pavement including transporting and stacking usable block along road side and dispose unusable blocks outside PWD land or desired by Engineer (NS).
Relaying old 80 mm thick interlocking paver blocks over 30 mm thick fine sand including transportation from road side where stacked excluding cost of interlocking paver blocks and complete in all respect as per specifications (NS).
Providing and laying 80mm thick interlocking paver blocks ISI marked (IS code: 15658:2006) of all shapes and colours in design mix cement M-40 as per IRC:SP:63-2004, over a bed of 30 mm thick fine sand complete in all respects. [HSR 10.159]
Earth work in excavation in foundations, trenches, etc. in all kinds of soils, not exceeding 2 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil, clear from the edge of excavation and subsequent filling around masonry, in 15 cm layers with compaction, including disposal of all surplus soil, as directed within a lead of 30 metres. (HSR 6.6)
Damp proof course 75 mm thick of cement concrete 1:2:4 using stone aggregate 20mm nominal size with 2 coats of bitumen 20/30 penetration, at 1.65 Kg per sqm laid hot and sanded. (HSR 10.114)
Cement concrete 1:4:8 with stone aggregate 40 mm Nominal size in foundation and plinth. (HSR 10.39)
Cement Concrete 1:2:4 with stone aggregate 20mm nominal size in foundation and plinth. (HSR 10.41)
Design mix cement concrete of grade M-10 with minimum cement contents 220 Kg./cum in foundation and plinth. (HSR 10.63)
Providing & laying in position machine batched and machine mixed design mix M-20 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge in foundation and plinth. (Note: Cement content considered in this item is @ 300 kg/cum.). (HSR 10.65)
Precast cement concrete 1:2:4 with stone aggregate 20 mm nominal size in Kerbs and the like items, finished smooth with 6 mm thick cement plaster 1:3 on exposed surface including from work, placing and fixing in position, complete at the ground level or in first storey. (HSR 10.77)
E/work filling in central verge portion in all kind of soils including dressing, side slope to given levels and templates after breaking of clouds, including compensation for earth taken from private land, fields etc. and the entire satisfaction of the Engineer of the work confirming to PWD specification No. 6.2 and 6.3 and 3.2 and the other specification 1990 1st edition. Note :- No earth work will be allowed to be taken from PWD B&R/ROW except for surplus earth after approval from Engineer.
Cement concrete 1:11/2:3 with stone aggregate 20 mm nominal size for reinforced concrete work but excluding steel-reinforcement centering and shuttering in foundation and plinth laid in position complete in all respect. {HSR 10.79 + 10.95 (a)}.
Cement concrete 1:11/2:3 with stone aggregate 20 mm nominal size for reinforced concrete work in slabs with inclination not exceeding 25 degree with Horizontal, excluding steel reinforcement but including centering and shuttering, laid in position complete in all respect {HSR 10.82 + 10.95 (a)}
Cement concrete 1:11/2:3 with stone aggregate 20 mm nominal size for reinforced concrete work for walls (10cm to 20cm thickness) straight and curved excluding steel reinforcement but including centring and shuttering, laid in position, complete in all respects {HSR 10.87 + 10.95 (a)}
Cement concrete 1:11/2:3 with stone aggregate 20 mm nominal size for reinforced concrete work in footings, strips, foundations, beams, rafts, pedestals and approach slabs of bridges etc., excluding steel reinforcement but including centring and shuttering, laid in position, complete in all respects.(For work upto 1.5 metres below ground level). {HSR 10.90+10.95(a)}
First class brick laid in cement sand mortar 1:4 in foundation and plinth. (HSR 11.4)
12 mm thick cement plaster 1:4 (HSR 15.5)
Providing and fixing PVC rain water pipe 6 kg pressure of ISI marked in cement mortar during masonary work (b) 150mm dia PVC pipe 6 kg pressure (HSR 13.89)(b)
Painting two coats excluding priming coat with ready-mixed paint for metallic surfaces in all shades on new steel or iron work. (HSR 16.17)
Applying priming coat with metal primer on new steel or iron work including preparation of surface(HSR 16.9)
Wrought iron and mild steel (using angles, flats, square bars, tees and channels) ladders, grills, grating frames, window guards, iron doors open able or fixed stair case or parapet or any other type of railing, gates and tree guards etc., including cost of screws and welding rods or bolts and nuts complete fixed in position. (HSR 18.12)
Steel reinforcement TMT bars FE-500 EQR / FE-500 D grade or more for RCC work, where no included in the complete rate of RCC including straightening, bending, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. and placing in position complete in all respects for all heights / depths / storey's / basements etc. Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work, excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods for binding and placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. (HSR 18.22)
Providing & Marking center line / side line 2.5mm thick (minimum) with hot applied thermo-plastic road marking paint 10 cms wide/ 15cm wide complete in all respect such as furnishing all labour, materials, tolls equipment including all incidental costs necessary for carrying out in work at site confirming to the technical specification as clause No. 803 of MORT&H specification for road and bridge works (5th revision) of 2013/ Latest edition. Each container of the thermoplastic material shall have the name trademark or other means of identification of manufacturer, batch number, date of manufacture color maximum application temperature and maximum heating temperature. The thermoplastic paint material shall be of Asian Paint-Apcomark/Berger-Sigmarc/Prismo. The glass beads shall be of Potters/Sovitec/Fleoiite. The thermoplastic material shall be sampled and tested in accordance with appropriate ASTM/BS method. The contractor shall furnish to the Engineer-in- Charge a copy of certified test reports from the manufacturer of the thermoplastic material meet all requirement of the specifications. The reflector zing glass beads shall meet the requirement of clause 803.4.2 and test methods mentioned in clause 803.4.2.4 shall be meticulously followed. The minimum thickness specified is exclusive of surface of glass beads the method of thickness measurement shall be in accordance with appendix B and C of BS:3262 (part-3). Note: - Before start of work the contractor shall give brand, batch number, manufacturing date of the material to be used along with a photocopy of bill duly signed by the contractor and get approved the same from Engineer-in-Charge before use.
Providing & fixing public information board consisting of 75 mm GI Pipe of size 2.45 m x 1.15 m with 900 mm x 900 mm GI sheet 16 gauge connected welded with 5 mm thick steel plate of 50mm duly painted as per column mentioned in the Drawing and fixing at site in 60 x 60 x 75 cm cement concrete 1:2:4 block complete in all respect.
Providing & fixing retro reflective hazard marker confirming to IRC79: 1981 of size 900 x 300 mm with back support of M. S. angle 25 x 25 x 3 mm and post of 50 x 50 x 5 mm, 1500 mm high embedded into 0.3 x 0.3 x 0.3 m M20 grade concrete as per site requirements, using non-metallic micro-prismatic retro reflective sheet confirming to IRC: 67-2012 type IV specification fixed on 3 mm thick Aluminium composite. Material sheet as base board with pressure sensitive adhesive having 0.5 mm thick Aluminium on both sides. (of reputed make such as Array Dennison/3M)
Providing and installing shoulder mounted direction signage of various sizes using non-metallic micro prismatic retro reflective sheet conforming to IRC-67-2012 type IV, HIP specification fixed on 3 mm thick Aluminium composite panels as base board with pressure sensitive adhesive having 0.5 mm thick Aluminium on both sides supported on single or two nos, Mild steel pipe post 80 mm NB medium class 4 mm thick embedded in M-20 grade concrete foundation of size (600 mm X 600 mm X 750 mm) complete as per drawings Technical specification and as directed by Engineer-in-Charge. Size 1200mm x 900 mm
Providing & erecting OVERHEAD SIGNS gantry supported by M. S. Pipe Structure (MS Pipe should be of TATA/ Sail/ Jindal/RINL make only) complete as per drawings, Technical Specifications and as directed by Engineer-In-Charge including painting with red oxide primer and first quality synthetic enamel paint, construction of R. C. C. foundation for providing of M. S Tubular structure for Cantilever signage at given site as per drawing enclosed. The C. C. mix to be in ratio of 1:1 1/2:3 (RCC 1:11/2:3) and that of lean to be ratio of 1:3:6 the work will be carried out as per the instructions of Engineer-In-Charge. Note: - Foundation including reinforcement etc. as per Drawing. Cantilever Over head Sign gantry. (T-Type) frame/truss Size-3.05m x 1.830m Note: - This item is excluding sign boards which will be payable extra as per item No. 44.
Pavement Marker (Cat Eyes) Moulded shank raised pavement markers made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing internal reflection of the light entering the lens face and shall support a load of 16000 KG tested in accordance to ASTM D 4280 Type H and complying to specifications of Category A of MORTH Circular No. W/NH/33023/10 97-DO III dt. 11.06.1997. The height width and length shall not be exceed 50mm, 100mm and 100 mm and with minimum reflective area of 13 Sqcm. On each side and the slope to the base shall be 35+/- degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19+/- 2 mm and height not less than 30+/- mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer (of reputed make such as Avery Dennison/3M)
Recovery items: The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Material obtained from dismantling of existing bituminous layer and granular layers have been calculated taking assumption that 80% of theoretical material will be retrieved. The dismantled material can used in any of the item for the work after modification (bringing it to required specifications) after approval from employer. In case it is not possible to use this material on the work, the agency can take away this material. This material can be taken away by the agency at the price quoted by the agency but minimum price to be quoted is limited to reserve price as fixed and mentioned as under :- (i) Bituminous Material @ Rs. 1299.00 per Cum
M/s. Lord Shiva Construction Company Pvt. Ltd
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid