Tender Value
₹15.7 L
EMD Value
₹31,406
Closing Date
30 Jun 2026, 3:00 pm
Chief Engineer/Metro Zone/Hyderabad
2nd floor Room.No.208 Kalyan Nagar X Roads
Construction of damaged compound wall, raising of existing compound wall and providing barbed wire fencing at 220/132/33KV SS Gachibowli.
704779
CE/MZ/Tech/ew-07/2026-2027
OPEN
Civil Works
RANGAREDDY
4 documents required · 4 mandatory
₹556
₹31,406
30 May 2026
30 May 2026
30 May 2026
Earthwork excavation in all types of soils (upto stone matrix) which can be excavated in combination of mechanically and manually with pick axe and crow bars and do not require blasting in all conditions such as dry, wet, slushy etc., covering initial lead and lift etc., and backfilling the foundations (after laying foundations) with excavated earth including watering, compacting as per standard specification and disposing of surplus earth within site (up to 1KM lead) complete as per directions of Engineer in charge at site for finished item of work.
Laying of Cement Concrete (1:4:8) mix using 40mm size HBG metal Machine crushed for foundations including cost and conveyance of all materials at all leads and lifts, ramming, consolidating, curing etc,complete. for finished item of work as per directions of the Engineer-in-charge.
Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) (Fe 500/ 500D/550D) grade as per IS 1786-1979) of TISCO/ SAIL/ VSP / JINDAL PANTHER make, different diameters for RCC works , including labour charges for straightening, cutting,bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126) - FOR CONTROL ROOM/ BUILDINGS
Laying of Reinforced Cement Concrete (RCC) M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and centering,etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge. Centering should be with Casuarinas Ballies,Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc. complete. - FOOTING / RAFT
Laying of Reinforced Cement Concrete (RCC) M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate,coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge. Centering should be with Casuarinas Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc. complete. - PLINTH BEAM
Laying of Reinforced Cement Concrete (RCC) M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge. Centering should be with Casuarinas Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc. complete. - COLUMN
Brick Masonry in CM (1:6) with common burnt clay bricks of class as per Table-1 of IS:1077-1992 Non-Modular or traditional size 23 x 11 x 7 cms of approved quality, including cost & conveyance of all materials, labour charges, scaffolding leads, lifts and curing complete as per the directions of the Engineer in charge for the finished item of work . - For Compound Wall
Laying of Plain Cement concrete (PCC) Nominal Mix (1:3:6) with 20mm graded HBG metal for encasing/embedding the structural steel supportng 'Y' angles with necessary form work including cost and conveyance of all materials, labour charges, curing and water charges, tools and tackles, all leads & lifts etc.,complete for finished item of work as per directions of the Engineer-in-charge. (IS-456)
Supply and fixing in position of MS angles (embedded in CC (1:3:6) compound wall including ) over compound wall including painting with two coats of synthetic enamel paint of approved quality, make, colour and shade over one coat of red oxide, complete as per the directions of the Engineer in charge for the finished item of work.
Supplying and fixing galvanised steel barbed wire (IS 278 - 1978 : Type A - IOWA Type Designation) weighing 9.38 Kg per 100 metres (min.), Straining and fixing to any type of standard, rails, straining bolts, including securing with and provision of galvanised mild z steel wire, stapples or steel pins, etc.,complete as per the directions of the Engineer in charge for the finished item of work. (Posts and struts of wood, concrete, steel, etc.) and straining bolts shall be paid for separately).
Plastering with CM (1:5), 12 mm thick to the even wall surfaces including cost & conveyance of all materials, labour charges, leads, lifts , scaffolding and curing complete as per the directions of the Engineer in charge for the finished item of work. - Without caffolding
Plastering to Uneven surfaces of RR /CR, PCC with CM(1:5) 20mm. thick including cost & conveyance of all materials, labour charges, leads, lifts and curing complete as per the directions of the Engineer in charge for the finished item of work.
White washing with Birla/JK White cement if approved quality with two coats quality to give even shade after thoroughly brushing the surface to remove all dirt and remaind of loose powdered material including cost of all materials, and labour charges and incidental such as scaffolding , lift charges etc, complete for finished item of work as directed by the engineer in charge. complete for finished item of work.
Seignorage charges including SMET 2%
Corpus fund towards NAC @0.1% on total without taxes on Civil portion
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Specification Gachibowli.pdf
TENDER_DOCUMENT • 1.47 MB
BOQ Gachibowli.xls
TENDER_DOCUMENT • 0.06 MB
NIT Gachibowli.pdf
TENDER_DOCUMENT • 0.29 MB
PR gachibowli compound wall.pdf
TENDER_DOCUMENT • 0.17 MB
Download all tender documents and submit your bid