| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.3 LAdmitted-Fee/PreQual/Technical/Finance | ₹6.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹6.7 LAdmitted-Fee/PreQual/Technical/Finance | ₹6.7 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹7.1 LAdmitted-Fee/PreQual/Technical/Finance CHENNAI | CHENNAI | TAMIL NADU | 600001 | ₹7.1 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | R JAYARAMAN L3 | P NARAYANAMOORTHY L1 | M MURUGAN L2 |
|---|---|---|---|---|---|---|
| 1.00Construction of mini csc at p.u.elementary school @ Allinagaram village and panchayat | ||||||
| 2.00 | Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as | 25.39 | sqm | 250 ₹6,347.5 | 203.49 ₹5,166.61 Lowest | 243 ₹6,169.77 |
| 3.00 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors bill | 4.29 | cum | 5,690 ₹24,410.1 | 4,893.82 ₹20,994.49 Lowest | 5,398 ₹23,157.42 |
| 4.00 | Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. (Upto GL) | 47.02 | cum | 520 ₹24,450.4 | 451.96 ₹21,251.16 Lowest | 504 ₹23,698.08 |
| 5.00 | Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. (above GL) | 24.7 | cum | 935 ₹23,094.5 | 903.92 ₹22,326.82 Lowest | 1,007 ₹24,872.9 |
| 6.00 | Supply and fabrication of steel as per IS432/1960 (Tested Quality) including fabrication charges for all RCC items schedule in the tender including cost of steel which will be supplied by the department section store and the cost will be recovered from th | 950 | cum | 87 ₹82,650 | 75.86 ₹72,067 Lowest | 85 ₹80,750 |
| 7.00 | Supplying and fixing Polycarbonate 6mm thick and steel tubular box section of 100x50x3mm of 1meter interval including priming coat fixing in position with all necessary accessories complete complying with standard specification and as directed by the departmental officers. | 15.9 | cum | 1,750 ₹27,825 | 1,086.03 ₹17,267.88 | 596 ₹9,476.4 Lowest |
| 8.00 | Paving the floor with Granite slab 20mm thick in floors in CM 1:3, 20mm thick Granite slab (double side polished steel grey granite slab) 20mm thick for urinal partition | 5.4 | kg | 957 ₹5,167.8 | 2,037.53 ₹11,002.66 | 928 ₹5,011.2 Lowest |
| 9.00 | stainless steel hand rail | 20 | Rmt | 1,250 ₹25,000 Lowest | 1,521.4 ₹30,428 | 1,696 ₹33,920 |
| 10.00 | Cement Concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges, centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 0.18 | sqm | 6,329 ₹1,139.22 | 6,045.07 ₹1,088.11 Lowest | 6,594 ₹1,186.92 |
Tender Value
₹8.2 L
EMD Value
₹8,200
Closing Date
5 Aug 2026, 3:30 pmClosed
BLOCK DEVELOPMENT OFFICER(VPT)
BLOCK DEVELOPMENT OFFICER(VPT),PANCHAYAT UNION THIRUPPUVANAM
Construction of Mini CSC at PU Elementary school in Allinagaram Village and Panchayat
2026_RDTN_687460_1
TPM-2026-2027-MINI CSC-ALLINAGARAM
Open Tender
Civil Works
Item Rate
180 days
PANCHAYAT UNION THIRUPPUVANAM
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹8,200
Yes
13 Aug 2026
21 Jul 2026
5 Aug 2026
21 Jul 2026
5 Aug 2026
21 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of mini csc at p.u.elementary school @ Allinagaram village and panchayat | - | - | - | - |
| 2 | Earth work Excavation in all classes of soils such as hard stiff clay. Stiff block hard red earth, shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as | 25.39 | sqm | - | - |
| 3 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost & conveyance of all materials to site including cost of cement which will be supplied departmentally from section store at the cost three of which will be recovered for the contractors bill | 4.29 | cum | - | - |
| 4 | Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. (Upto GL) | 47.02 | cum | - | - |
| 5 | Supplying and erecting of centering of RCC items including cost & conveyance of all materials to site and all labour charges etc., complete. (above GL) | 24.7 | cum | - | - |
| 6 | Supply and fabrication of steel as per IS432/1960 (Tested Quality) including fabrication charges for all RCC items schedule in the tender including cost of steel which will be supplied by the department section store and the cost will be recovered from th | 950 | cum | - | - |
| 7 | Supplying and fixing Polycarbonate 6mm thick and steel tubular box section of 100x50x3mm of 1meter interval including priming coat fixing in position with all necessary accessories complete complying with standard specification and as directed by the departmental officers. | 15.9 | cum | - | - |
| 8 | Paving the floor with Granite slab 20mm thick in floors in CM 1:3, 20mm thick Granite slab (double side polished steel grey granite slab) 20mm thick for urinal partition | 5.4 | kg | - | - |
| 9 | stainless steel hand rail | 20 | Rmt | - | - |
| 10 | Cement Concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges, centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 0.18 | sqm | - | - |
stage.html
html • 0.02 MB
finance_826286.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.26 MB
BOQ_826286.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].