| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹97,373Admitted-Finance | ₹97,373 | L1 | Admitted-Finance |
| 2 | L2₹1.0 LAdmitted-Finance 1ST FLOOR HRECF OFFICE NEAR JNV SCHOOL MIAN GATE TIA RAY RONG CHOGLAMSAR LEH LADAKH 194101 UDYAM LA 02 0000410 | LEH LADAKH | LADAKH | 194101 | ₹1.0 L | L2 | Admitted-Finance |
| 3 | L3₹1.1 LAdmitted-Finance | ₹1.1 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | HIMALAYAN RENEWABLE ENERGY AND CONSTRUCTION FIRM (HRECF) L2 | darshan kumar gandhi L3 | saroj bala L1 |
|---|---|---|---|---|---|---|
| 1.00Supply Part | ||||||
| 1.02 | Supply of Aluminium Coil (wire) for HV/LV winding | 1 | Kg | 1,000 ₹1,000 | 1,560 ₹1,560 | 990 ₹990 |
| 1.03 | Supply of Copper Coil (wire) for HV/LV winding | 1 | Kg | 2,100 ₹2,100 | 900 ₹900 | 900 ₹900 |
| 1.04 | Supply of HT Bush Rod Up to 12 MM | 1 | Nos | 300 ₹300 | 350 ₹350 | 350 ₹350 |
| 1.05 | Supply of LT Bush Rod Up to 12 MM | 1 | Nos | 350 ₹350 | 390 ₹390 | 390 ₹390 |
| 1.06 | Supply of LT Bush Rod above 12 MM | 1 | Nos | 1,400 ₹1,400 | 1,450 ₹1,450 | 1,450 ₹1,450 |
| 1.07 | Supply of HT Bushing (Suitable for up to 12 MM Bush Rod) | 1 | Nos | 500 ₹500 | 520 ₹520 | 520 ₹520 |
| 1.08 | Supply of LT Bushing (Suitable for upto 12 MM Rod) | 1 | Nos | 90 ₹90 | 90 ₹90 | 90 ₹90 |
| 1.09 | Supply of LT Bushing (Suitable for above 12 MM Rod) | 1 | Nos | 100 ₹100 | 95 ₹95 | 95 ₹95 |
| 1.10 | Supply of Off Load Switch (200KVA to 500KVA) | 1 | Set | 100 ₹100 | 0.5 ₹0.50 | 0.5 ₹0.50 |
Updated dates
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
28 Mar 2026, 2:00 pmClosed
Executive Engineer EDD Leh
PDD Choglamsar
same as above
2026_PDNRE_18586_1
e-NIT No. 02 of ED Leh of 2026-27 dated 10-03-2026
Open Tender
Electrical Works
365 days
Leh
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Payable To Executive Engineer PDD Leh
₹50,000
10 Apr 2026
10 Mar 2026
30 Mar 2026
10 Mar 2026
28 Mar 2026
11 Mar 2026
Supply Part
Supply of Aluminium Coil (wire) for HV/LV winding
Supply of Copper Coil (wire) for HV/LV winding
Supply of HT Bush Rod Up to 12 MM
Supply of LT Bush Rod Up to 12 MM
Supply of LT Bush Rod above 12 MM
Supply of HT Bushing (Suitable for up to 12 MM Bush Rod)
Supply of LT Bushing (Suitable for upto 12 MM Rod)
Supply of LT Bushing (Suitable for above 12 MM Rod)
Supply of Off Load Switch (200KVA to 500KVA)
Supply of Off Load Switch (above 500KVA & upto 1MVA)
Supply of On Load Tap Changer (200KVA to 500KVA)
Supply of On Load Tap Changer (above 500KVA & upto 1MVA)
Supply of Gasket (Standard size/Grade) Up to 100 KVA
Supply of Gasket (Standard size/Grade) above 100 KVA & upto 250 KVA
Supply of Gasket (Standard size/Grade) above 250 KVA & Upto 500 KVA
Supply of Gasket (Standard size/Grade) above 500 KVA & upto 1 MVA
Supply of Sundary items like Plug, Cape, Bolt, Valve etc.
Labour Part
Opening/Dismentling/Rewinding and Reassembling of HV/LV Limb (Leg) of Damaged 25KVA Transformer either by rewinding with New Coil or reconditioning of Old Coil by using insulating materials like varnish, leatheroid paper, Butter paper, Spacer etc and than proper testing of HV/LV Limbs as per the standard norms.
Opening/Dismentling/Rewinding and Reassembling of HV/LV Limb (Leg) of Damaged 63KVA Transformer either by rewinding with New Coil or reconditioning of Old Coil by using insulating materials like varnish, leatheroid paper, Butter paper, Spacer etc and than proper testing of HV/LV Limbs as per the standard norms.
Opening/Dismentling/Rewinding and Reassembling of HV/LV Limb (Leg) of Damaged 100KVA Transformer either by rewinding with New Coil or reconditioning of Old Coil by using insulating materials like varnish, leatheroid paper, Butter paper, Spacer etc and than proper testing of HV/LV Limbs as per the standard norms.
Opening/Dismentling/Rewinding and Reassembling of HV/LV Limb (Leg) of Damaged 200/250KVA Transformer either by rewinding with New Coil or reconditioning of Old Coil by using insulating materials like varnish, leatheroid paper, Butter paper, Spacer etc and than proper testing of HV/LV Limbs as per the standard norms.
Opening/Dismentling/Rewinding and Reassembling of HV/LV Limb (Leg) of Damaged 300/400KVA Transformer either by rewinding with New Coil or reconditioning of Old Coil by using insulating materials like varnish, leatheroid paper, Butter paper, Spacer etc and than proper testing of HV/LV Limbs as per the standard norms.
Opening/Dismentling/Rewinding and Reassembling of HV/LV Limb (Leg) of Damaged 500/630KVA Transformer either by rewinding with New Coil or reconditioning of Old Coil by using insulating materials like varnish, leatheroid paper, Butter paper, Spacer etc and than proper testing of HV/LV Limbs as per the standard norms.
Opening/Dismentling/Rewinding and Reassembling of HV/LV Limb (Leg) of Damaged 1MVA Transformer either by rewinding with New Coil or reconditioning of Old Coil by using insulating materials like varnish, leatheroid paper, Butter paper, Spacer etc and than proper testing of HV/LV Limbs as per the standard norms.
Spray Painting of Transformer parts like Main Tank, Radiator, Conservator Tank etc with one coat of Primer and two coat of paint and epoxy paint inside the tank with recommended quality including cost of Primer/Paint (Complete Job) for 25KVA
Spray Painting of Transformer parts like Main Tank, Radiator, Conservator Tank etc with one coat of Primer and two coat of paint and epoxy paint inside the tank with recommended quality including cost of Primer/Paint (Complete Job) for 63KVA
Spray Painting of Transformer parts like Main Tank, Radiator, Conservator Tank etc with one coat of Primer and two coat of paint and epoxy paint inside the tank with recommended quality including cost of Primer/Paint (Complete Job) for 100KVA
Spray Painting of Transformer parts like Main Tank, Radiator, Conservator Tank etc with one coat of Primer and two coat of paint and epoxy paint inside the tank with recommended quality including cost of Primer/Paint (Complete Job) for 200/250KVA
Spray Painting of Transformer parts like Main Tank, Radiator, Conservator Tank etc with one coat of Primer and two coat of paint and epoxy paint inside the tank with recommended quality including cost of Primer/Paint (Complete Job) for 300/400KVA
Spray Painting of Transformer parts like Main Tank, Radiator, Conservator Tank etc with one coat of Primer and two coat of paint and epoxy paint inside the tank with recommended quality including cost of Primer/Paint (Complete Job) for 500/630KVA
Spray Painting of Transformer parts like Main Tank, Radiator, Conservator Tank etc with one coat of Primer and two coat of paint and epoxy paint inside the tank with recommended quality including cost of Primer/Paint (Complete Job) for 1MVA
Replacing of Damaged/wornout Off Load Switch/On Load Tap Changer Switch (200KVA to 500KVA)
Replacing of Damaged/wornout Off Load Switch/On Load Tap Changer Switch (Above 500KVA & upto 1MVA)
Minor repair like replacng of Damaged LT/HT Bush Rod , Bushing etc. & bracing/welding/Loose connection/denting if any
Welding/Bracing of Tank/Radiator/Conservator Tank etc (per 10cm)
Refilling of Oil after Filteration and then testing at factory site of 25KVA X'mer
Refilling of Oil after Filteration and then testing at factory site of 63KVA X'mer
Refilling of Oil after Filteration and then testing at factory site of 100KVA X'mer
Refilling of Oil after Filteration and then testing at factory site of 200KVA X'mer
Refilling of Oil after Filteration and then testing at factory site of 250KVA X'mer
Refilling of Oil after Filteration and then testing at factory site of 300KVA X'mer
Refilling of Oil after Filteration and then testing at factory site of 400KVA X'mer
Refilling of Oil after Filteration and then testing at factory site of 500KVA X'mer
Refilling of Oil after Filteration and then testing at factory site of 630KVA X'mer
Refilling of Oil after Filteration and then testing at factory site of 1MVA X'mer
Loading/Unloading and carriage charges of 25KVA Transformers from Divisional Store to Workshop (to & fro)
Loading/Unloading and carriage charges of 63KVA Transformers from Divisional Store to Workshop (to & fro)
Loading/Unloading and carriage charges of 100KVA Transformers from Divisional Store to Workshop (to & fro)
Loading/Unloading and carriage charges of 200/250KVA Transformers from Divisional Store to Workshop (to & fro)
Loading/Unloading and carriage charges of 300/400KVA Transformers from Divisional Store to Workshop (to & fro)
Loading/Unloading and carriage charges of 500/630KVA Transformers from Divisional Store to Workshop (to & fro)
Loading/Unloading and carriage charges of 1MVA Transformers from Divisional Store to Workshop (to & fro)
Per day Service charges of one technician for minor repair of Transformer at site.
Topping up of repaired transformer with fresh Oil
Scrap part
Cost of Worn out /Damaged (Scraps) of Aluminium Coil.
Cost of Worn out/Damaged (Scraps) of Copper Coil.
Cost of Worn out/Burnt out Oils.
Worn out/Damaged Sundry Items like Plug, Cape, Bolt, Valve etc.
Worn out/Damaged Sundry Items (Brass Items) like HT/LT Bush Rod etc.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
techsummary_44591.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.07 MB
Tendernotice_2.pdf
PDF • 0.49 MB
Tendernotice_3.pdf
PDF • 0.98 MB
Tendernotice_4.pdf
PDF • 0.35 MB
BOQ_44591.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid