Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical RAJIV COLONY MURTHAL ROAD SONIPAT HARYANA 131001 | SONIPAT | HARYANA | 131001 | Accepted-Technical Technically Responsive |
| 2 | Accepted-Technical | Accepted-Technical Technically Responsive |
| 3 | Accepted-Technical | Accepted-Technical Technically Responsive |
| 4 | Rejected-Technical | Rejected-Technical Technically Non Responsive due to non compliance of Clause 4.3 i and ii, 4.1 g, 4.1 J 1 and 4.1 J 2 of ITB and Note under Clause 1.2 of section 2 of RFP |
| 5 | Rejected-Technical NO 91 GROUND FLOOR 3RD CROSS ROAD OPPOSITE VASAVI KANNIKA PARAMESHWARI TEMPLE BENGALURU BENGALURU 560021 KARNATAKA INDIA | BENGALURU | BENGALURU | KARNATAKA | 560021 | Rejected-Technical Technically Non Responsive due to non compliance of Clause 12.2 h of ITB of RFP, 4.1 J 1 and 4.1 J 2 of ITB and Note under Clause 1.2 of section 2 of RFP |
Tender Value
₹51.5 Cr
EMD Value
₹51.5 L
Closing Date
24 Jun 2026, 3:00 pmClosed
Superintending Engineer R and B NH Circle Warangal
Office of SE R and B NH Circle Warangal
Performance Based Maintenance Contract PBMC to two lanes with paved shoulders from Km 0.000 to Km 72.600 of Nakrekal to Thanamcherla section of NH 365 in the State of Telangana
2026_MoRTH_907625_1
SE R and B NH WGL 02 2026 27 Dt. 06.05.2026
Open Tender
Civil Works - Roads
Percentage
1825 days
Telangana
As per bid document
5 documents required · 5 mandatory
₹11,800
RPAO NH MoRTH, Hyd
₹51.5 L
Office of E in C R and B Hyd
11 Sept 2026
6 May 2026
25 Jun 2026
13 May 2026
24 Jun 2026
13 May 2026
20 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | ROUTINE MAINTENANCE (Lump Sum)
[for Total 60 months] | - | lump sum | 17,33,87,028 | - |
| 1.02 | INITIAL RECTIFICATION WORKS (Lump
Sum) [To be completed within 06 months
from the notice to proceed] | - | lump sum | 1,17,24,331 | - |
| 1.03 | PERIODICAL MAINTENANCE WORKS
(Lump Sum) [To be completed as decided by the Engineer but overlay of Highway to be completed within 24/48 months (as the case may be) from the date of notice to proceed]. | - | lump sum | 20,54,00,433 | - |
| 1.04 | EMERGENCY WORKS (Unit Rates) | - | lump sum | 36,40,338 | - |
| 1.05 | Incident Management Service (Lump Sum) | - | lump sum | 4,20,00,000 | - |
| 2Total Estimate Cost | |||||
| 3Add-GST @ 18% | |||||
| 4Estimated cost with GST | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
BOQ_953961.xls
BOQ • 0.26 MB
Corigendum.pdf
PDF • 0.20 MB
Corrigendum.pdf
PDF • 0.19 MB
RFP.pdf
PDF • 2.81 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .