| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹21.6 LAdmitted-Finance | -11.51% | ₹21.6 L | L1 | Admitted-Finance |
| 2 | L2₹21.9 L+₹24,692.62 (1.14%)Admitted-Finance | -10.50% | ₹21.9 L+₹24,692.62 (1.14%) | L2 | Admitted-Finance |
| 3 | L3₹22.2 L+₹58,920 (2.72%)Admitted-Finance PLOT NO 312 INDUSTRIAL AREA PHASE 1 CHANDIGARH | CHANDIGARH | CHANDIGARH | -9.10% | ₹22.2 L+₹58,920 (2.72%) | L3 | Admitted-Finance |
| 4 | L4₹23.2 L+₹1.5 L (7.07%)Admitted-Finance | -5.25% | ₹23.2 L+₹1.5 L (7.07%) | L4 | Admitted-Finance |
Tender Value
₹24.4 L
EMD Value
₹48,900
Closing Date
1 Aug 2026, 5:15 pmClosed
Commandant TPT Bn
Commandant TPT Bn
Renovation and upgradation of existing basket ball court to synthetic basket ball court size 34 M X 19 Mand Construction of 01 Nos clay Handball Court at TPT Bn ITBP. Size (45x25)meter
2026_ITBP_919155_1
Engr/TPT/Basketball123
Open Tender
Civil Works
Works
Commandant TPT Bn Chandigarh
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹48,900
4 Aug 2026
25 Jul 2026
3 Aug 2026
25 Jul 2026
1 Aug 2026
25 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | DEMOLISHING OF EXISTING CONCRETE BASE WITH BASKETBALL POLE:-
• Demolishing cement concrete manually/by mechanical including disposal of material with 50-100 mtr . Removing or cutting existing old basketball pole. | 1 | job | 50,000 | ₹50,000 |
| 2 | ASPHALT BASE :-
• Leveling of soil (ground/work area)
• Application of weed killer and soil stabilizer by using the chemicals (gramoxene & chloro phyrophos )
• Laying a 5'' WBM/Wet Mixed hard stone soil course and achieving a minimum thickness of 4" inch after compaction of the sub base/layer using an 8 to 10 ton roller.
• Slope 1:100 (1%) Towards Sides.
• Laying of asphalt BM in 80/100 grade bitumen for 40 mm thickness in 10-19mm stone aggregate
• Laying of asphalt BM in 80/100 grade bitumen for 12-15 mm thickness in 6-8 mm stone aggregate.
• Surface Evenness – max deviation ±3mm over 3m straight edge
• Providing and construction open Strom Water Drain single side depending on the site conditions for effective drainage of rain water having a depth of 6” and width of 6” with slope of 1:120 finished granting MS gratings on top.
• Toe wall on all the four sides as retaining wall for the asphalted surface, up to a depth of 8”-12” width 4” and plaster only the exposed wall section and painted.
Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : Of area 3 sq. metres and below | 646 | sqm | 1,050 | ₹6,78,300 |
| 3 | ALL WEATHER ACRYLIC SYNTHETIC SURFACING (8 LAYERS ULTRA CUSHION):-
• One Layer of Acrylic Resurface
• Three layer layers of high class sports field Granule Cushion with preservative fluid.
• Two layer layers of high class sports field Powder Cushion with preservative fluid.
• Two layers of color coating.(Red/Greed/Blue )
• Specifications: Surface texture: More texture with less abrasiveness.
• Surface Colour : Recommended Red /Green
• Resistance to wear : Table H18 1000 cycles
• Glass : 3.6%
• Seculars Reflection : 0.1-0.3
• Temperature : 15-21 degree Celsius
• UV Treated : Fade Resistant
• Coat : 100% Acrylic
• Game Line Marking
• Thickness -2-3mm
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in:Cement mortar 1:4 (1 cement : 4 coarse sand) | 646 | sqm | 950 | ₹6,13,700 |
| 4 | LED LIGHTING INSTALLATION :-
• Four 17 ft high from ground level ERW medium pipe electric poles.
• Make a square frame of MS pipe and installed on the top of the poles. Putting steps on each of the poles so that the maintenance can be easier.
• Putting 1 mm 3 core wires from top of the pole to bottom for each LED Lights.
• Installing MCB 32 amp and other electrical switches for LED Light in an electrical box one each for one pole and one main box where all these four pole boxes come.
• Installing of 8 LED Light 200 watt (two on each pole)
Control unit :
Watts: 200 wt.
Power: 20 wt
Life: 50000hrz
Colour of Light: Warm White /yellow
Light Decay 5%lumens: 1-6001m
IR Radiation, High brightness SMD Led | 1 | job | 2,25,000 | ₹2,25,000 |
| 5 | BASKETBALL COURT ACCESSORIES COMPLETE WITH SUPPLY AND FIXING:-
• Basketball poles with cast Fiberglass Board: The main structure will be made of ERW 6” tubing and formed sheet metal parts.
• Board: 180x105x15-20mm back board transparent acrylic with angle frame.
• Dunking Ring: Two springs Slam Dunking ring solid steel 18-20mm & Net Indian with standard quality.
• Water Removing Roller-Imported Water Removing Roller Size 36”. | 1 | job | 1,15,130 | ₹1,15,130 |
| 6 | CHAIN LINK FENCING WITH GATE :-
• Perimeter to be Covered Fabricate all around fence 10’ in heightened covering with one opening in the form of gate 3’ wide and 8’ high at the entrance of the court.
Fencing Details
• M.S. square Pipe 50mm x 50mm x 3mm and 10’ height above ground level with cement concrete foundation in pc (1.2.4) Tie of M.S. Square Pipe 37mm x37mm x3mm at Top Support. Chain link to be of 12 gauge thick GI wire spaced 3” apart. Grouting, Priming and Painting of the fence.
Gate | 3,346 | sqfeet | 95 | ₹3,17,870 |
| 7 | Surface dressing of the ground including removing vegetation and in-equalities (Picking of stones) not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kind of Soil. | 1,125 | sqm | 36 | ₹40,500 |
| 8 | Earth work by mechinical / manual means in rough excavation, banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with ½ tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and for all lift:All kind of soil | 168.75 | cum | 400 | ₹67,500 |
| 9 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
2.8.1 All kinds of soil. | 1.84 | cum | 300 | ₹552 |
| 10 | Filling available excavated earth (excluding rock) in trenches, plinth,sides of foundations etc. in layers not exceeding 20cm in depth,consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 0.91 | cum | 200 | ₹182 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.06 MB
Tendernotice_2.pdf
PDF • 1.47 MB
BOQ_965923.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .