| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.3 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹41.9 L+₹3.6 L (9.26%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | Rejected-Technical | - | Rejected-Technical Disqualified in Technical Evaluation |
| Sl No | Description | Qty | Unit | AJAYA KUMAR SAMAL AND CO L2 | Agrani Realtech Pvt Ltd L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling of Security Office building (G+1) marked in the layout drawing in Appendix-1 along with the conversion of retained wall into boundary wall.
a. Dismantling of Security office building (G+1 ) as marked in the tender in accordance with the Scope of Work & other clauses of SOTR including necessary temporary works during dismantling, control of dust/pollution, removal/disposal of all debris, bricks ,dismantled concrete along with embeded reinforced concrete and other unsalvageable/discarded material generated from dismantling of building outside GRSE premises & salvageable materials (metal, wood) within GRSE premises in the designated areas, including transportation charges, all precautionary & safety measures, statuary permission etc & all allied jobs
b.Convertion of retained wall into boundary wall (as indicated in the tender drawing) same as the existing boundary wall along with the installation of barbed wire and concertina coil fencing. Following work has to be done:
i. Masonry work.
ii. RCC Work (Columns and Top Beam).
iii. Plastering as necessary.
iv. Structural work as necessary.
v. Fixing of barbed wire and concertina coil fencing at top of
the boundary.
vi. Priming and Painting work.
vii. Other civil related Work as Required. | 1 | LS | 6,50,000 ₹6,50,000 Lowest | 8,50,000 ₹8,50,000 |
| 2.00 | Detail survey of the proposed Concreting and pavered block area using Auto Level/Total station and necessary design and drawing for the project along with drainge system | 1 | LS | 85,000 ₹85,000 Lowest | 2,50,000 ₹2,50,000 |
| 3.00 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. (a) Depth of excavation not exceeding 1,500 mm. | 60 | Cum | 450 ₹27,000 | 185 ₹11,100 Lowest |
| 4.00 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete, With earth obtained from excavation of foundation | 30 | Cum | 750 ₹22,500 | 127 ₹3,810 Lowest |
| 5.00 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. | 2 | Cum | 1,500 ₹3,000 | 1,032 ₹2,064 Lowest |
| 6.00 | Cutting chase upto 125 x 150 mm. and subsequent mending of damages in brick/ concrete floor | 100 | M | 350 ₹35,000 | 125 ₹12,500 Lowest |
| 7.00 | Supplying, spreading and consolidating an uniform and homogeneous mixture of Stone Dust and Sand (mixed in proportion of 3 : 1 by volume and by any approved method as per direction of Engineer-in- Charge) to the required thickness in layers at 97% Proctor Density (not less than 1.7 gm/cc) with power roller to proper gradient and camber, including watering as necessary, lighting, guarding, barricading and making adequate earthen bundh where necessary to protect the edges and curing with water for 2 to 3 days, mending cracks and depressions by rolling where necessary complete as per Specification including all incidental charges of roller, cost of fuel & lubricants.
The compaction factor is 0.67.
Note: Rolling should also be done before spreading of mixture of stone dust and sand | 155 | Cum | 2,300 ₹3,56,500 | 650 ₹1,00,750 Lowest |
| 8.00 | Brick pavement with 1st class or picked jhama bricks as directed with joints set close in cement mortar (1 :6) and rule\flush pointing with cement mortar (1 : 4)
When laid with a cushion of sand below (including cost thereof),One brick flat pavement(Cement- 1.4 Kg/Sq.M) | 55 | Sqm | 650 ₹35,750 | 500 ₹27,500 Lowest |
| 9.00 | Brick work with 1st class bricks in cement mortar (1:4) ,In foundation and plinth | 10 | Cum | 6,500 ₹65,000 | 6,000 ₹60,000 Lowest |
| 10.00 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. | 15 | Cum | 8,200 ₹1,23,000 | 5,500 ₹82,500 Lowest |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
18 Feb 2023, 12:00 pmClosed
Mr. Nilanjan Kar, Sr. Manager (Contract), GRSE Ltd
Mr. Nilanjan Kar, Sr. Manager (Contract), GRSE Ltd.
CONSTRUCTION OF CONCRETE PAVEMENT WITH LAYING OF PAVER BLOCK AND DISMANTLING OF TRUNCATED OLD BUILDING AT GRSE MAIN UNIT KOLKATA
2023_GRSE_92097_1
SCC/NK/OT/YM/ MAIN/065/N.ET-1927
Open Tender
Job Works
Item Rate
45 days
As per tender document
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
Yes
GARDEN REACH SHIPBUILDERS and ENGINEERS LIMITED
₹1 L
Yes
Yard Modernisation Department, GRSE Main Unit
28 Feb 2023
28 Jan 2023
20 Feb 2023
28 Jan 2023
18 Feb 2023
8 Feb 2023
3 Feb 2023
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.81 MB
MATRIX.xls
Tender Documents • 0.13 MB
BOQ_101519.xls
BOQ • 0.35 MB
GRSEInstructionsToBidderForOnlineBidSubmission.pdf
Additional Documents • 0.22 MB
PPP-MII-Order-16.09.2020.pdf
Additional Documents • 7.88 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .