Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹68.2 LAdmitted-Finance NOT AVAILABLE | NORTH | DELHI | 110006 | -16.11% | ₹68.2 L | L1 | Admitted-Finance |
| 2 | L2₹68.3 LAdmitted-Finance | -16.00% | ₹68.3 L | L2 | Admitted-Finance |
| 3 | L3₹69.2 LAdmitted-Finance AT KATHUAREDI PO BENTAPUR PS BRAHMAGIRI DIST PURI ODISHA | PURI | PURI | ODISHA | -14.99% | ₹69.2 L | L3 | Admitted-Finance |
Tender Value
₹81.4 L
EMD Value
₹81,400
Closing Date
6 Apr 2026, 3:00 pmClosed
Executive Engineer (Central Tender Cell)
Central Tender Cell,BMC,ICOMC Tower, Pin-751022
Construction of Road, Drain, Platform and Washing Station at Jharapada Wealth centre
2026_ORULB_127307_8
BMC-EE-Tender Cell-79/2025-26 dt. 13.03.2026
Open Tender
Civil Works - Others
120 days
BMC AREA
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹81,400
Yes
Office chamber of the EE,Central Tender Cell
5 Jun 2026
17 Mar 2026
6 Apr 2026
17 Mar 2026
6 Apr 2026
17 Mar 2026
17 Mar 2026 - 24 Mar 2026
24 Mar 2026
Earth work excavation inall Kinds of soil in water upto 0.60 mtr depth requiring the aid of pan & vessel within 50mtr initial lead and 1.50mtr initial lift.
Supplying and filling F&P with river sand with well watering and ramming etc. complete.
Supplying all materials, labour, T&P and providing Cement Concrete (1:4:8) using 4 cm size CBHG metal etc. complete.
Construction of granular sub-base by providing close graded granular sub-base Grading-III materials per table 400-1, spreading in iniform layer and with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with vibratory roller to achive the desired density complete as per Clause 401 of MoSRT&H specification for road and bridge works.
R.C.C M-25 with 20mm size Crusher broken chips including all cost, conveyance, royalty & taxes etc.compete of all materials to work site as per specification approved by the department & direction of Engineer in charge.
Supplying fitting & placing uncoated HYSD reinforcement including cutting, bendind,binding & placing the steel rods as per drawing & technical specification approved by the department with cost of binding wire 18 to 20 gaug
Providing Bituminus expansion Joint board 12mm thick in cement concrent road etc.complete.
Rigid Smooth centerinmg and Shuttering including false work and removing the same after casting etc.complete.
Fixing Vertified tiles in floors, treads or steps and landing over 25mm bed of C:M (1:1) jointed with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing complete
Painting two coats with any approved paint including the cost of enamel paint for wood work & Iron work
Fabrication and manufacturing of solid precast concrete element with provisions of shear keys, connecting loops, dowel tubes and proper lifting accessoriesfor walls, beams, slabs, stairs, column etc, of various thickness, shape and size of different concrete grades manufactured in controlled factory environment with approved methodology including moulds (Pallet system, Tilts form, table moulds, battery moulds, vertical moulds, beam moulds, column moulds, staircase moulds, Facade mould, etc.), mixing, transporting and placing of concrete, vibrating, curing, finishing, making necessary cutott/holes of required sizes for services. yard handling & stacking all complete as per IS 11447:1985 and as per approved shop drawings and design mix as per the direction of Engineer-in-Charge (Cost of reinforcement, Mechanical, Electrical and Plumbing inserts will be paid separately).(Including Transportation velvetouch or equivalent make of approved shade to interior wall surface over a coat of primer with water bond cement primer after preparing the surface smooth by applying putty punning with Synthetic Acrylic wall putty including finishing the surface smooth by sand papering in all heights including scaffolding charges with cost, conveyance, taxes of all materials, cost of all labours, etc. as required for the work complete in all respect.(Excluding putty)
Erection & Installation of Precast/Prestressed Concrete elements in correct & final position with proper line level and plumb at site making all arrangements (i.e cranes, push-pull jacks & all another T & P for lifting Placing & Alignment of elements, within erection tolerance as per IS 15916 as per approved shop drawings and all completeas per the direction of Engineer-in-Charge but excluding the cost of sim pads, non shrink grout and steel works i.e hangers. All work up to fifth floor.(Sor -2022 page no-258)
Providing and Laying Factory made Chamfered edge Cement Concrete Paver Bliocks of required strength, thickness & size/shape made by table Vibratory method , to attain superior smoth finish using PU or Equivalent moulds ,Laid in required gray colour and Pattern over 50mm thick Compacted bed of coarse sand , copmacting and proper embedding / laying of interlocking Paver Blocks into the sand bedding layer through vibratory compaction by using plate vibrator, Filling joints with Fine sand and cutting of Paver blocks as per required size/Pattern, finishing and sweeping extra sand in footpath, parks, lawns, drive ways, or light traffic parking and Lanes/Road etc, all complete as Per veneering with vertical grains or cross bands and face veneers on both faces of shutters of approved design including cost of all door fittings and fixtures etc. complete
Providing, fitting, fixing P.V.C plastic pipe schedule 40,80&120as per ASTM -D- 1785/2004 and the direction of the Engineer-in-charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_585292.xls
BOQ • 0.24 MB
DTCN_79.pdf
Tender Documents • 0.95 MB
Download all tender documents and submit your bid