Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹55.5 LAdmitted-Finance | +0.00% | ₹55.5 L | L1 | Admitted-Finance |
| 2 | L2₹58.2 L+₹2.8 L (5.00%)Admitted-Finance | +5.00% | ₹58.2 L+₹2.8 L (5.00%) | L2 | Admitted-Finance |
| 3 | L3₹61.0 L+₹5.5 L (10.0%)Admitted-Finance | +10.00% | ₹61.0 L+₹5.5 L (10.0%) | L3 | Admitted-Finance |
Tender Value
₹55.5 L
EMD Value
₹1.1 L
Closing Date
13 Jul 2026, 6:00 pmClosed
Executive Engineer PWD Division Gandoh
Executive Engineer PWD Division Gandoh
Permanent Restoration of WSS Palian tilogra,WSSAmrie, WSS Bhatyas ,WSS jung nallah, WSSBudhli Jakyas
2026_PWDJK_314729_8
E-NIT 16 of 2026-27
Open Tender
Civil Works
Percentage
Gandoh
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
Executive Engineer PWD Division Gandoh
₹1.1 L
17 Jul 2026
6 Jul 2026
14 Jul 2026
6 Jul 2026
13 Jul 2026
6 Jul 2026
6 Jul 2026 - 11 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Carriage of Material GI Pipe from Divisional Store to site of work average 290 km by mechanical transport and from road side to site of work avg 5 km by Head Load | 5.85 | mtr | 5,288.05 | ₹30,935.09 |
| 2 | Carriage of Material hdpe Pipe from Divisional Store to site of work average 290 km by mechanical transport and from road side to site of work avg 5 km by Head Load | 4.62 | mtr | 18,276.28 | ₹84,436.41 |
| 3 | Providing,Laying and fitting of G.I Pipes complete includingproviding and fitting of pipes specials i.e union , elbow , bend, reducer,socket as per BIS Specification Excluding the cost of pipes and earth work 15 mm dia | 900 | mtr | 206.5 | ₹1,85,850 |
| 4 | Providing,Laying and fitting of G.I Pipes complete includingproviding and fitting of pipes specials i.e union , elbow , bend, reducer,socket as per BIS Specification Excluding the cost of pipes and earth work 20 mm dia | 750 | mtr | 255.2 | ₹1,91,400 |
| 5 | Providing,Laying and fitting of G.I Pipes complete includingproviding and fitting of pipes specials i.e union , elbow , bend, reducer,socket as per BIS Specification Excluding the cost of pipes and earth work 25 mm dia | 200 | mtr | 339.25 | ₹67,850 |
| 6 | Providing,Laying and fitting of G.I Pipes complete includingproviding and fitting of pipes specials i.e union , elbow , bend, reducer,socket as per BIS Specification Excluding the cost of pipes and earth work 32 mm dia | 400 | mtr | 411.3 | ₹1,64,520 |
| 7 | Providing,Laying and fitting of G.I Pipes complete includingproviding and fitting of pipes specials i.e union , elbow , bend, reducer,socket as per BIS Specification Excluding the cost of pipes and earth work 40 mm dia | 300 | mtr | 489.25 | ₹1,46,775 |
| 8 | Providing,Laying and fitting of G.I Pipes complete includingproviding and fitting of pipes specials i.e union , elbow , bend, reducer,socket as per BIS Specification Excluding the cost of pipes and earth work 50 mm dia | 150 | mtr | 805.7 | ₹1,20,855 |
| 9 | Providing,Laying and fitting of HDPE Pipes Excluding the cost of pipe and earth work 63mm dia specification IS4984:2016 PN 16 PE 100 | 400 | mtr | 203 | ₹81,200 |
| 10 | Providing,Laying and fitting of HDPE Pipes Excluding the cost of pipe and earth work 50mm dia specification IS4984:2016 PN 16 PE 100 | 2,100 | mtr | 159 | ₹3,33,900 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.66 MB
BOQ_1019363.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .