Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-Finance KHARIAR | KHARIAR | NUAPADA | ODISHA | L1 | Accepted-Finance Stand L1 | |
| 2 | L2₹5.1 L+₹2,543.37 (0.50%)Rejected-Finance RUGUDIPADA BALANGIR ODISHA PIN 767001 | BALANGIR | ODISHA | 767001 | L2 | Rejected-Finance Stand L2 | |
| 3 | L3₹5.3 L+₹24,162 (4.79%)Rejected-Finance PO BALANGIR DISTRICT BALANGIR ODISHA PIN 767001 | BALANGIR | ODISHA | 767001 | L3 | Rejected-Finance Stand L3 | |
| 4 | L4₹5.6 L+₹51,503.21 (10.2%)Rejected-Finance AT DIHABALARAMPUR PO KARILOPATNA PS PATKURA DIST KENDRAPARA PIN 754223 | KENDRAPARA | KENDRAPARA | ODISHA | 754223 | L4 | Rejected-Finance Stand L4 |
Tender Value
₹6.4 L
EMD Value
₹6,400
Closing Date
3 Oct 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer Kantabanji (RandB) Divn.
O/O the Superintending Engineer Kantabanji (RandB) Divn.
Provision of 100KVA, 11/04KV Sub Station Construction of 100 bedded Boys Hostel Building in Odisha Adarsha Vidyalaya at Jharni under Turekela Block in Balangir District
2026_EICCL_141319_1
03/KBJ/2026-27
National Competitive Bid
Electrical Works
Percentage
60 days
KANTABANJI
2 documents required · 2 mandatory
₹4,000
₹6,400
Yes
5 Nov 2026
21 Sept 2026
5 Oct 2026
21 Sept 2026
3 Oct 2026
21 Sept 2026
21 Sept 2026 - 3 Oct 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | A-11kv PP 55 mmsq AAAC on 9mtr PSC Pole
55 Sqmm AAAC including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% | 61.8 | Mtr. | 52.25 | ₹3,229.05 |
| 2 | GI Channel 75x40x6mm including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% | 1.31 | Kg. | 93.99 | ₹122.75 |
| 3 | 11 KV pin Insulator polymer including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% | 1 | Each | 168.7 | ₹168.7 |
| 4 | 7/10 SWG GI wire (for Stay including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% | 1.69 | Each | 92.79 | ₹156.82 |
| 5 | 8 SWG GI wire (for earthing) including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% | 0.8 | Kg. | 89.17 | ₹71.34 |
| 6 | G.I Nuts, bolt & Washer including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% | 0.86 | Kg. | 89.17 | ₹76.69 |
| 7 | GI Barbered wire for anticlimbing including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% | 0.8 | Kg. | 89.17 | ₹71.34 |
| 8 | 11kv Line AAAC tapping on RSJ/PSC Pole
Pole PSC 9 Mtr long 300 kg. PSC. including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @20% | 1 | Each | 4,737.15 | ₹4,737.15 |
| 9 | Cost of other materials for line and sub station 75X40X6mm. GI Channel for Straight Cross-arm including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% | 32.64 | Kg. | 93.99 | ₹3,067.83 |
| 10 | 11 KV V-Cross Arm(GI) (10.2 Kg each) including 1% LC, T&P @2%, Transportation @7.5%, Erection Charge @10% | 1 | Each | 1,025.46 | ₹1,025.46 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_610216.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_3.pdf
PDF • 0.51 MB
Tendernotice_2.pdf
PDF • 1.47 MB
Tendernotice_1.pdf
PDF • 0.53 MB
BOQ_610216.xls
BOQ • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .