Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.7 LAccepted-Finance | L1 | Accepted-Finance Low Rate Quoted | |
| 2 | L2₹18.7 L+₹2,433.31 (0.13%)Rejected-Finance | L2 | Rejected-Finance High Rate Quted |
| Sl No | Description | Qty | Unit | N VENKATESAN L2 | J Sakthivel L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation & depositing on bank with an initial lead of 10 metre & initial lift of 2 metre in Hard shift clay, stiff block cotton, hard red earth shales, murrum, gravel, stoney earth, and earth mixed with small size boulders and hard gravelly soil (SS 20B) for foundation including shoring, strutting, baling out water providing danger light wherever necessary depositing the surplus earth on bank and other incedential charges etc., complete and as directed by TWAD board Officers
In hard stiff clay, stiff black cotton soil, hard red earth, sales, murrams, gravel, stoney earth, earth mixed with small sized boulders and hard gravelly soil S.S.20B
a)First depth of 2m From 0 to 2 m below GL | 58.55 | m3 | 250 ₹14,637.5 | 246 ₹14,403.3 Lowest |
| 2.00 | Second depth of 2m From 2m to 4 m below GL | 11.66 | m3 | 300 ₹3,498 | 257 ₹2,996.62 Lowest |
| 3.00 | Plain Cement Concrete 1:4:8 (one cement, four sand and eight hard granite broken stone of 40mm size ISS gauge) for foundation and footing including mixing, placing, ramming ,finishing curing etc. complete in accordance with standard specification and as directed by the TWAD Board Officers. | 2.3 | m3 | 5,100 ₹11,730 | 5,040 ₹11,592 Lowest |
| 4.00 | Reinforced Cement Concrete Mix M30 grade using 10mm & 20mm Hard blue granite Broken stone (machine crushed) excluding the cost of RTS rods for reinforcement and centering, strutting, shuttering but including cost of all materials mixing, laying, Vibrating the concrete with mechanical vibrators, ramming, consolidating, finishing and curing etc., Complete and as directed by the TWAD Board Officers
a) Below 1.5m from GL | 10.37 | m3 | 6,900 ₹71,553 | 6,877 ₹71,314.49 Lowest |
| 5.00 | b) 0m to 1.50m below GL | 1.75 | m3 | 6,900 ₹12,075 | 6,877 ₹12,034.75 Lowest |
| 6.00 | c) 0m to 4.50m above GL | 2.83 | m3 | 7,100 ₹20,093 | 7,009 ₹19,835.47 Lowest |
| 7.00 | d) 4.50 m to 7.32 m above GL | 2.22 | m3 | 7,300 ₹16,206 | 7,269 ₹16,137.18 Lowest |
| 8.00 | e) 7.32 m to 10.98 m above GL | 2.53 | m3 | 7,500 ₹18,975 | 7,401 ₹18,724.53 Lowest |
| 9.00 | f) 10.98 m to 14.64 m above GL | 11.4 | m3 | 7,533 ₹85,876.2 Lowest | 7,533 ₹85,876.2 Lowest |
| 10.00 | g) 14.64 m to 18.30 m above GL | 3.09 | m3 | 7,700 ₹23,793 | 7,664 ₹23,681.76 Lowest |
Tender Value
₹18.8 L
EMD Value
₹18,760
Closing Date
28 Oct 2025, 4:00 pmClosed
BLOCK DEVELOPMENT OFFICER
BLOCK DEVELOPMENT OFFICE, CHEYYAR
Cons of OHT at Arathirivelur
2025_RDTN_617856_1
A4/2025/14thFC
Open Tender
Civil Works
Lump-sum
90 days
BLOCK DEVELOPMENT OFFICE
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹18,760
5 Nov 2025
28 Oct 2025
28 Oct 2025
28 Oct 2025
28 Oct 2025
28 Oct 2025
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_738400.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .