Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAccepted-AOC ALIGARH | ALIGARH | UTTAR PRADESH | 202001 | ₹2.1 Cr | L1 | Accepted-AOC Preparation Bond for Rs. 21483954.04 Only |
| 2 | L2₹2.3 Cr+₹15.4 L (7.18%)Rejected-Finance 2K 23 HOUSING BOARD KRISHNA NAGAR BHARATPUR RAJASTHAN 321001 | BHARATPUR | BHARATPUR | RAJASTHAN | 321001 | ₹2.3 Cr+₹15.4 L (7.18%) | L2 | Rejected-Finance Rejected due to higher Rates |
| 3 | L3₹2.3 Cr+₹19.2 L (8.95%)Rejected-Finance 42 141C KRISHNA KUNJ HALWAI KI BAGHICHI AGRA | AGRA | AGRA | UTTAR PRADESH | ₹2.3 Cr+₹19.2 L (8.95%) | L3 | Rejected-Finance Rejected due to higher Rates |
| 4 | L4₹2.4 Cr+₹25.4 L (11.8%)Rejected-Finance 12 | ₹2.4 Cr+₹25.4 L (11.8%) | L4 | Rejected-Finance Rejected due to higher Rates |
| 5 | L5₹2.4 Cr+₹30.0 L (14.0%)Rejected-Finance A 23 GUKUL DHAM VERAJ ROAD AURANGABAD KHADAR MATHURA | MATHURA | MATHURA | UTTAR PRADESH | ₹2.4 Cr+₹30.0 L (14.0%) | L5 | Rejected-Finance Rejected due to higher Rates |
Tender Value
₹2.8 Cr
EMD Value
₹16.2 L
Closing Date
30 Dec 2025, 12:00 pmClosed
Superintending Engineer
Office Of The Superintending Engineer Agra Circle 198 Takkar Road Pwd Agra
Reconstruction work of minor bridge on Jagner Baseri to Deori Road in Agra district
2025_CEAGR_1101391_2
5460/14M-AC/2025-26 dated 21-11-2025
Open Tender
Civil Works - Bridges
Percentage
365 days
Agra
Minor bridge
2 documents required · 2 mandatory
₹2,360
₹16.2 L
Yes
Agra
6 Feb 2026
24 Dec 2025
30 Dec 2025
24 Dec 2025
30 Dec 2025
24 Dec 2025
26 Dec 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | MINOR BRIDGE
Demolishing cement concrete work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in- charge. (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 105 | Cum | 1,050 | ₹1,10,250 |
| - | Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge : ln lime mortar (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 375 | Cum | 440 | ₹1,65,000 |
| - | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. MORTH SI NO. 15.01 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 1,750 | Cum | 110 | ₹1,92,500 |
| - | Sand Filling in Foundation Trenches as per Drawing & Technical Specification MORTH SI NO. 15.03 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 87 | Cum | 1,665 | ₹1,44,855 |
| - | Plain Cement Concrete Grade M-15 in Open Foundation (Flooring) complete as per Drawing and Technical Specifications. MORTH SI NO. 15.11(A) (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 427 | Cum | 6,920 | ₹29,54,840 |
| - | Reinforced Cement Concrete Grade M-25 in Open Foundation (Raft) complete as per Drawing and Technical Specifications. MORTH SI NO. 15.11 (E) (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 427 | Cum | 7,840 | ₹33,47,680 |
| - | Reinforced Cement Concrete Grade M-25 in sub-structure for wall & slab etc. complete as per Drawing and Technical Specifications. MORTH SI NO. 15.12(B) (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 740 | Cum | 9,010 | ₹66,67,400 |
| - | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 112 | MT | 84,700 | ₹94,86,400 |
| - | PCC M15 Grade levelling course below approach slab complete as per drawing and technical specifications. MORTH SI NO. 15.15 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 12 | Cum | 6,670 | ₹80,040 |
| - | Reinforced cement concrete M-30 approach slab including reinforcement and formwork complete as per drawing and Technical specification MORTH SI NO. 15.16 (Including Supply of Material, Labour and T&P work complete as per direction of E-in-C. Including all taxes but excluding GST.) | 25 | Cum | 11,850 | ₹2,96,250 |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.89 MB
BOQ_2029997.xls
BOQ • 0.37 MB
T2-JAGNERBASERI.pdf
Tender Documents • 2.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .