Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.5 CrAccepted-Finance 4 6 1 KALABAIRAVANKADU AYAKKARANBULAM II VEDHARANYAM TALUK NAGAPATTINAM DISTRICT 614707 | AYAKKARANBULAM | NAGAPATTINAM | TAMIL NADU | 614707 | L1 | Accepted-Finance L1 | |
| 2 | L2₹12.7 Cr+₹21.6 L (1.73%)Accepted-Finance OLD NO 470 NEW NO 700 ANNA SALAI NANDANAM CHENNAI 600035 | CHENNAI | CHENNAI | TAMIL NADU | 600035 | L2 | Accepted-Finance L2 | |
| 3 | L3₹12.9 Cr+₹47.1 L (3.78%)Accepted-Finance 9 203 KATTUKOTTAI MALAIVEPPANKUTTAI POST NAMAKKAL TAMIL NADU 637404 | NAMAKKAL | NAMAKKAL | TAMIL NADU | 637404 | L3 | Accepted-Finance L3 | |
| 4 | L4₹13.0 Cr+₹48.6 L (3.90%)Accepted-Finance NO 123 1ST STREET URC NAGAR CHINNA SENGODAMPALAYAM ERODE DISTRICT 638 012 | CHINNA SENGODAMPALAYAM | ERODE | TAMIL NADU | 638012 | L4 | Accepted-Finance L4 | |
| 5 | L5₹13.7 Cr+₹1.2 Cr (9.64%)Accepted-Finance A 24 HOUSING UNIT KOLLAMPALAYAM ERODE 638 002 | ERODE | TAMIL NADU | 638002 | L5 | Accepted-Finance L5 |
| Sl No | Description | Qty | Unit | Smart Infratech Developers L4 | SABARI DHARAN ENGINEERING CONTRACTOR L3 | M/s. Kousic & Co L5 | Samuthraa Projects L2 | SRI EZHUMALAIYANCONSTRUCTION L1 | RAJAKUMAR INFRA PRIVATE LIMITED L8 | RSK CONSTRUCTION AND PROJECTS L6 | ARAWIND CONSTRUCTIONS L7 | JAYAM ENGINEERING AND CONSTRUCTION L9 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- Upto 2.40m Footing Depth. Data worked out for 48 m3 per day/8 hrs. | 4,372.12 | M³ | 186 ₹8,13,214.32 Lowest | 275 ₹12,02,333 | 193 ₹8,43,819.16 | 217 ₹9,48,750.04 | 290 ₹12,67,914.8 | 339 ₹14,82,148.68 | 200 ₹8,74,424 | 355 ₹15,52,102.6 | 207 ₹9,05,028.84 |
| 2.00 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms at the site, etc., complete complying with standard specification and as directed by the departmental officers. | 947 | M³ | 186 ₹1,76,142 Lowest | 370 ₹3,50,390 | 193 ₹1,82,771 | 272 ₹2,57,584 | 390 ₹3,69,330 | 444 ₹4,20,468 | 200 ₹1,89,400 | 484 ₹4,58,348 | 370 ₹3,50,390 |
| 3.00 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting in- clusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.
A). Upto 2.40m Depth. Data worked out for 64 m3 per day/8 hrs. | 277 | M³ | 189 ₹52,353 | 150 ₹41,550 | 95 ₹26,315 Lowest | 264 ₹73,128 | 150 ₹41,550 | 173 ₹47,921 | 150 ₹41,550 | 165 ₹45,705 | 198 ₹54,846 |
| 4.00 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting in- clusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers. Above 2.40m Depth. | 56 | M³ | 222 ₹12,432 | 165 ₹9,240 | 95 ₹5,320 Lowest | 319 ₹17,864 | 160 ₹8,960 | 192 ₹10,752 | 150 ₹8,400 | 204 ₹11,424 | 198 ₹11,088 |
| 5.00 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 2,095 | M³ | 37 ₹77,515 Lowest | 120 ₹2,51,400 | 236 ₹4,94,420 | 194 ₹4,06,430 | 120 ₹2,51,400 | 139 ₹2,91,205 | 100 ₹2,09,500 | 45 ₹94,275 | 43 ₹90,085 |
| 6.00 | Supplying and filling in foundation, basement, etc with filling Crushed Stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 469.2 | M³ | 1,000 ₹4,69,200 Lowest | 1,850 ₹8,68,020 | 1,575 ₹7,38,990 | 1,924 ₹9,02,740.8 | 1,950 ₹9,14,940 | 2,522 ₹11,83,322.4 | 2,000 ₹9,38,400 | 2,050 ₹9,61,860 | 1,500 ₹7,03,800 |
| 7.00 | Supplying and filling in foundation, basement, etc with Sand Gravel mix in ratio of 1:3 in layers of not more than 15cm thick thoroughly mixed, well watered, rammed with surface vibrator and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 12.66 | M³ | 1,000 ₹12,660 Lowest | 1,250 ₹15,825 | 2,205 ₹27,915.3 | 3,868 ₹48,968.88 | 1,250 ₹15,825 | 1,566 ₹19,825.56 | 1,600 ₹20,256 | 1,558 ₹19,724.28 | 1,650 ₹20,889 |
| 8.00 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 1,583.77 | M³ | 1,059 ₹16,77,212.43 | 850 ₹13,46,204.5 | 354 ₹5,60,654.58 | 909 ₹14,39,646.93 | 850 ₹13,46,204.5 | 956 ₹15,14,084.12 | 1,000 ₹15,83,770 | 1,250 ₹19,79,712.5 | 200 ₹3,16,754 Lowest |
| 9.00Supplying and filling of ISS Metal of following sizes in dispersion trench around the stoneware pipe or in the leach pit or sock pit or recharge pit the required thickness as directed by the Departmental Officers etc. complete. | ||||||||||||
| 9.01 | 40mm ISS Metal | 9.6 | M³ | 1,000 ₹9,600 Lowest | 1,735 ₹16,656 | 1,733 ₹16,636.8 | 1,553 ₹14,908.8 | 1,620 ₹15,552 | 1,913 ₹18,364.8 | 2,000 ₹19,200 | 1,280 ₹12,288 | 2,400 ₹23,040 |
Tender Value
₹17 Cr
EMD Value
₹8.6 L
Closing Date
10 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Chief Engineer, PWD
O/o Chief Engineer,PWD, Projects, Chennai-05.
ConstructionofPermanentBuildingforGovernmentArtsandScienceCollegeatMuthupettai in Thiruvarur District.
2026_HE_712346_1
14CE/2026-27
Open Tender
Civil Works - Buildings
Lump-sum
450 days
Thiruvarur
Please refer Tender documents.
11 documents required · 11 mandatory
₹0
₹8.6 L
24 Nov 2026
9 Oct 2026
11 Nov 2026
9 Oct 2026
10 Nov 2026
9 Oct 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- Upto 2.40m Footing Depth. Data worked out for 48 m3 per day/8 hrs. | 4,372.12 | M³ | - | - |
| 2 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms at the site, etc., complete complying with standard specification and as directed by the departmental officers. | 947 | M³ | - | - |
| 3 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting in- clusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.
A). Upto 2.40m Depth. Data worked out for 64 m3 per day/8 hrs. | 277 | M³ | - | - |
| 4 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting in- clusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers. Above 2.40m Depth. | 56 | M³ | - | - |
| 5 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 2,095 | M³ | - | - |
| 6 | Supplying and filling in foundation, basement, etc with filling Crushed Stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 469.2 | M³ | - | - |
| 7 | Supplying and filling in foundation, basement, etc with Sand Gravel mix in ratio of 1:3 in layers of not more than 15cm thick thoroughly mixed, well watered, rammed with surface vibrator and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 12.66 | M³ | - | - |
| 8 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 1,583.77 | M³ | - | - |
| 9Supplying and filling of ISS Metal of following sizes in dispersion trench around the stoneware pipe or in the leach pit or sock pit or recharge pit the required thickness as directed by the Departmental Officers etc. complete. | |||||
| 9.01 | 40mm ISS Metal | 9.6 | M³ | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
BOQ_855710.xls
BOQ • 0.49 MB
MuthupettaiCover1.pdf
Tender Documents • 1.00 MB
MuthupettaiCover2.pdf
Tender Documents • 2.52 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .