Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.5 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹12.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹12.5 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹12.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹12.5 L
EMD Value
₹12,600
Closing Date
22 May 2026, 4:00 pmClosed
Executive Engineer, Horticulture, SZ, Berhampur
O/o Executive Engineer Horticulture, SZ, Baidyanathnagar, Berhampur-760010
Construction of Godown at Chingudijhar Farm in Rayagada District
2026_DOH_128749_2
E E (A) Hort S/Z-01 of 2026-27
Open Tender
Civil Works - Buildings
Percentage
120 days
At-Chingudijhar Farm in Rayagada District
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
Deputy Director of Horticulture, Rayagada
₹12,600
Yes
10 Jun 2026
7 May 2026
28 May 2026
7 May 2026
22 May 2026
7 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation of foundation in Hard soil within 50m initial lead and 1.5m initial lift. | - | cum | 1 | - |
| 2 | Filling Foundation and plinth with well graded sand including watering and ramming. | 1 | cum | 1 | ₹1 |
| 3 | Cement Concrete (1:4:8) with 40 mm size Hard Granite Metal. | 1 | cum | - | - |
| 4 | Brick work with FLY ASH bricks inC.M(1:6) in foundation and plinth. | 1 | cum | - | - |
| 5 | 2.50cm thick A.S.flooring with cement concrete (1:2:4) with 12mm size H.G.chips including cement punning. | - | sq.m | 0.4 | - |
| 6 | R. R. H.G. stone masonry in C.M. (1: 6) in foundation and plinth works. | 1 | cum | - | - |
| 7 | Brick Work with Fly Ash Bricks having crushing strength 75kg/sq.cm in cement mortar (1:6) in Super Structure. | 1 | cum | 1 | ₹1 |
| 8 | RCC Work M-20 grade with 20 mm and down grade HG chips (CB) including hoisting,lowering & laying concrete and compacting. | - | - | - | - |
| 9 | Plinth Band and Column Base | 1 | cum | 1 | ₹1 |
| 10 | Column and Beam | - | cum | - | - |
stage.html
html • 0.02 MB
finance_589509.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.08 MB
BOQ_589509.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .