| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance 5 MIRANDA APARTMENTS TELEPHONE ELECTRONIC CORPN 5 MIRANDA APARTMENT 1176 V S MARG PRABHADEVI MUMBAI MUMBAI | ₹1.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.7 Cr+₹4.5 L (2.80%)Admitted-Finance 43 TRIDEEP BUNGLOW MIDDLE CLASS HSG SOC NEXT TO ARYAN SCHOOL GROUND PALGHAR MAHARASHTRA | PALGHAR | PALGHAR | MAHARASHTRA | 401404 | ₹1.7 Cr+₹4.5 L (2.80%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical H NO 384 EKTA ENCLAVE HOTEL SAHARA RESIDENCY BUILDING NAVPUR NAKA ROAD BOISAR WEST THANE MAHARASHTRA 401501 | PALGHAR | MAHARASHTRA | 401501 | - | - | Rejected-Technical Not qualified as per NIT Criteria Clause 3(l) |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not qualified as per NIT Criteria (EMD Not Submitted) |
| Sl No | Description | Qty | Unit | Telephone Electronic Corpn L1 | DIPAK S PIMPLE ENGINEERS AND CONTRACTORS L2 |
|---|---|---|---|---|---|
| 1.00Item No.1: Maintenance of Communication PPS network and system, as given below- | |||||
| 1.10 | a) Maintenance of telephone lines, field networking and fence lighting maintenance. | 512 | Operation | 25,736 ₹1,31,76,832 Lowest | 28,500 ₹1,45,92,000 |
| 1.20 | b) Software development, maintenance and testing | 504 | Operation | 1,634 ₹8,23,536 | 1,500 ₹7,56,000 Lowest |
| 2.00Preventive and breakdown maintenance of FOC network at Plant site and Colony site as given below- | |||||
| 2.10 | Item No.2: OTDR testing for Preventive maintenance of existing FOC network at Plant site and Colony site. | 8 | Operation | 16,992 ₹1,35,936 | 2,000 ₹16,000 Lowest |
| 2.20 | Item No.3: Splicing with testing of existing faulty and/or new FOC core as per details mentionedat para 3 in Technical Specification (Annexure-I). | 240 | Core | 814 ₹1,95,360 | 250 ₹60,000 Lowest |
| 3.00Installation of Indoor / outdoor different types of cables as given below- | |||||
| 3.10 | Item No.4: Excavation and refilling of hard / soft soil for laying of telephone cables, optical fibre cable and power cable. | 2,500 | Meter | 255 ₹6,37,500 | 175 ₹4,37,500 Lowest |
| 3.20 | Item No.5: Laying ofU/G outdoortelephone cables, optical fibre cable and LT power cables. | 2,500 | Meter | 234 ₹5,85,000 | 60 ₹1,50,000 Lowest |
| 4.00Breakdown maintenance of different size telephone cables, by supplying suitable size cable jointing kit and required digging / refilling as per standard as given below- | |||||
Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
9 Mar 2022, 3:00 pmClosed
UMESH DANI
General Manager R and WM, INRP(O),Nuclear Recycle Board, Bhabha Atomic Research Centre
Operation and Maintenance of field work for Communication PPS System at BARC Tarapur
2022_NRB_674242_1
NRBBARCT/GSO/CPPS/2022/352
Open Tender
Electrical Works
Works
730 days
BARC TARAPUR
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹3.0 L
Yes
BARC TARAPUR
9 Jun 2022
18 Feb 2022
10 Mar 2022
18 Feb 2022
9 Mar 2022
18 Feb 2022
18 Feb 2022 - 1 Mar 2022
2 Mar 2022
Amount
Item No.1: Maintenance of Communication PPS network and system, as given below-
a) Maintenance of telephone lines, field networking and fence lighting maintenance.
b) Software development, maintenance and testing
Preventive and breakdown maintenance of FOC network at Plant site and Colony site as given below-
Item No.2: OTDR testing for Preventive maintenance of existing FOC network at Plant site and Colony site.
Item No.3: Splicing with testing of existing faulty and/or new FOC core as per details mentionedat para 3 in Technical Specification (Annexure-I).
Installation of Indoor / outdoor different types of cables as given below-
Item No.4: Excavation and refilling of hard / soft soil for laying of telephone cables, optical fibre cable and power cable.
Item No.5: Laying ofU/G outdoortelephone cables, optical fibre cable and LT power cables.
Breakdown maintenance of different size telephone cables, by supplying suitable size cable jointing kit and required digging / refilling as per standard as given below-
Item No.6: Breakdown maintenance of 10 pair telephone cable with supply and installation of joint kit
Item No.7: Breakdown maintenance of 20 pair telephone cable with supply and installation of joint kit
Item No.8: Breakdown maintenance of 50 pair telephone cable with supply and installation of joint kit
Item No.9: Breakdown maintenance of 100 pair telephone cable with supply and installation of joint kit
Replacement of existing old TTBs (outdoor) by removal of old TTB and Supply, installation & commssioning of same type double enclosure new TTBs of powder coated DP box made of 14 SWG (M.O.C: Pregalvanised G.I. Sheet) Steel, with all Krones in follwoing size (item sl no 5.1 to 5.9) & all terminations as per specification given in Technical Specification (annexure-I) .
Item No.10: 10 Pair TTB
Item No.11: 20 Pair TTB
Item No.12: 50 Pair TTB
Item No.13: 100 Pair TTB
Item No.14: 10 Pair+10 Pair TTB
Item No.15: 20 Pair+20 Pair TTB
Item No.16: 50 Pair+50 Pair TTB
Item No.17: 100 Pair+100 Pair TTB
Item No.18: 150 Pair+150 Pair TTB
Item No.19: ROAD CUTTING AND REFILLING
DIPAK S PIMPLE ENGINEERS AND CONTRACTORS
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.94 MB
BOQ_709555.xls
BOQ • 0.28 MB
TenderbookCPPS.pdf
Tender Documents • 9.73 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .