| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.5 LAccepted-AOC | ₹25.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹26.3 LRejected-AOC NEHRU NAGAR DHARMAPURI | DHARMAPURI | TAMIL NADU | 635106 | ₹26.3 L | L2 | Rejected-AOC L2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Not Produced in required Documents |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Not Produced in required Documents |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Not Produced in required Documents |
| Sl No | Description | Qty | Unit | Prabhavathi L1 | CHINNAMUTHU CONTRACTORS L2 |
|---|---|---|---|---|---|
| 1.00Renewal of Road from Kurumpatti road KM 0/0-1/590 in Dhasirahalli | |||||
| 2.00 | Scrub scrub jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers. | 693.9 | Sqm | 6 ₹4,163.40 | 8 ₹5,551.20 |
| 3.00 | Earth work excavation and depositing on bank with in lead the lift in hard stiff clay, stiff black cotton hard red earth, shales, murams, ordinary gravel, stone earth and earth mixed with small size boulders, hard gravelly soil etc. as per SS.20.etc. comp | 256.5 | Cum | 131 ₹33,601.50 | 145 ₹37,192.50 |
| 4.00Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | |||||
| 5.00 | Km 0/0 - 1/0 | 90 | Cum | 540 ₹48,600 | 650 ₹58,500 |
| 6.00 | Km 1/0 - 1/285 | 25.65 | Cum | 550 ₹14,107.50 | 650 ₹16,672.50 |
| 7.00Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25 mm using 13.20 mm IRC size HBG metal. | |||||
| 8.00 | Km 0/0 - 1/0 | 0.56 | Cum | 4,654.33 ₹2,606.42 | 5,500 ₹3,080 |
| 9.00 | Km 1/0 - 1/285 | 0.58 | Cum | 4,664.41 ₹2,705.36 | 5,500 ₹3,190 |
| 10.00Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.30 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503. | |||||
Tender Value
₹25.7 L
EMD Value
₹25,710
Closing Date
10 Feb 2026, 3:00 pmClosed
Block Development Officer(BP), Morappur
Block Development Office, Morappur
Morappur Block - Renewal of Road from Kurumpatti road KM 0/0-1/590 in Dhasirahalli - Package No.TN05-P05- Maintenance of Village Panchayat and Panchayat Union Roads from the State Finance Commission Grants (2025-26)- Morappur Block - P05
2026_RDTN_651803_1
Roc.No. 3756/2025/A2 Dt. 04.01.2026 P05
Open Tender
Civil Works
90 days
Block Development Office, Morappur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹25,710
Yes
25 Feb 2026
5 Feb 2026
10 Feb 2026
5 Feb 2026
10 Feb 2026
5 Feb 2026
Renewal of Road from Kurumpatti road KM 0/0-1/590 in Dhasirahalli
Scrub scrub jungles including and removing from site, disposal by burying or burning etc., complete as directed by the departmental officers.
Earth work excavation and depositing on bank with in lead the lift in hard stiff clay, stiff black cotton hard red earth, shales, murams, ordinary gravel, stone earth and earth mixed with small size boulders, hard gravelly soil etc. as per SS.20.etc. comp
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25 mm using 13.20 mm IRC size HBG metal.
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.30 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503.
Providing and laying bituminoua concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous and PMB Cubes @ 5.4 to 5.6 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H speciications clause 507 complete in all respects
Providing for Road Marking Using Thermoplastic Paint on Both Side of Road including Cost and Conveyance etc.,
Maintenance of 200 metre and km stones
HM Stones
KM Stone
Provision for Name Board
Provision for New Sign Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
TenderdocumentP05.pdf
Tender Documents • 0.91 MB
BOQ_781581.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid