Loading…
Loading…
Tender Value
₹2.5 L
EMD Value
₹4,978
Closing Date
6 Jul 2026, 4:00 pm3d left
Executive Engineer
the Executive Engineer, Irrigation and Public Health Division , PWD, Karaikal
Reconstruction of Sambakattalai bed dam regulator across Oduthurai channel near Sambakattalai bed dam regulator at Melaoduthurai, Neravy commune, Karaikal
2026_PWDC3_22444_1
12-08/PW/IPH/2026-27
Open Tender
Civil Works
60 days
Karaikal
Please refer Tender documents.
2 documents required · 2 mandatory
₹525
₹4,978
26 Jun 2026
26 Jun 2026
7 Jul 2026
26 Jun 2026
6 Jul 2026
26 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as per direction of Engineer-in-charge , within a lead of 50m - all kinds of soil | 13 | Cum | 272.13 | ₹3,537.69 |
| 2 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared | 1,200 | Sqm | 16.2 | ₹19,440 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50m and all lift | 1.2 | Cum | 165.29 | ₹198.35 |
| 4 | Quary dust filling below the foundation of Sambakattalai bed dam regulator across Oduthurai channel. The rate include cost of labour, transportation and all taxes etc., complete all as directed by Engineer -in-charge | 0.7 | Cum | 1,245.84 | ₹872.09 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:3:6 (1 cement : 3 fine aggregate : 6 graded stone aggregate 20mm nominal size) | 13 | Cum | 7,313.13 | ₹95,070.69 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:4:8 (1 cement : 4 fine aggregate : 8 graded stone aggregate 40mm nominal size) | 1 | Cum | 6,796.41 | ₹6,796.41 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:5:10 (1 cement : 5 fine aggregate : 10 graded stone aggregate 40mm nominal size) | 1 | Cum | 6,510.91 | ₹6,510.91 |
| 8 | Centring and shuttering including strutting , propping etc. and removal of form work for - foundations, footings, bases for columns | 29 | Sqm | 409.56 | ₹11,877.24 |
| 9 | Centring and shuttering including strutting , propping etc. and removal of form work for - retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth
and string courses fillets, kerbs and steps etc. | 23 | Sqm | 847.05 | ₹19,482.15 |
| 10 | Brick work with common burnt clay F.P.S (non modular ) bricks of class designation 3.5 in superstructure above plinth level upto floor five level in all shapes and sizes in - cement mortar 1:6 ( 1 cement : 6 fine aggregate) | 0.5 | Cum | 10,395.71 | ₹5,197.86 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
Tendernotice_2.pdf
PDF • 1.71 MB
BOQ_22889.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid