| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 LAccepted-Finance GOVT ELECTRICAL CONTRACTOR LIC NO A 967 BARARA HAMIRPUR HP | ₹6.0 L | L1 | Accepted-Finance L1 |
| 2 | L2₹6.2 LRejected-Finance AT GROUND FLOOR MAIN BAZAAR MEHRE TEHSIL BARSAR DISTT HAMIRPUR H P PIN CODE 174305 | HAMIRPUR | HIMACHAL PRADESH | 174305 | ₹6.2 L | L2 | Rejected-Finance L2 |
| 3 | L3₹6.3 LRejected-Finance VILL MALHER P O MARHOON TEH PALAMPUR DISTT KANGRA H P | MANDI | HIMACHAL PRADESH | 175013 | ₹6.3 L | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical 1 PNETH CHOORI CHAMBA CHAMBA HIMACHAL PRADESH 176311 UDYAM HP 02 0007745 | CHAMBA | HIMACHAL PRADESH | 176311 | - | - | Rejected-Technical Not-Qualified |
Tender Value
₹5.7 L
EMD Value
₹6,000
Closing Date
30 Dec 2025, 10:00 amClosed
Sr. Executive Engineer
o/o Sr. Executive Engineer ED Hamirpur
NIT 300 1. Prov. extension of 3phase LT line in replacement of lengthy services with bare conductor from existing 25 KVA S/stn Sastar Balli in (E) section Jhaniyari under ESD No. I HPSEBL Hamirpur. 2. Prov. extension of 3phase LT line in replacem
2025_HPSEB_124348_1
HPSEBL/EDHMR/E/2025-26/300
Open Tender
Electrical Works
60 days
Hamirpur
Please refer to tender doc
9 documents required · 9 mandatory
₹590
₹6,000
17 Apr 2026
24 Dec 2025
30 Dec 2025
24 Dec 2025
30 Dec 2025
24 Dec 2025
1. Prov. extension of 3phase LT line in replacement of lengthy services with bare conductor from existing 25 KVA S/stn Sastar Balli : AAAC 7/3.15mm conductor for 3Φ and additional 1% (Sag, Jumpering and wastage} .
RCC Muff 2000 mm long with concrete filling material
Channel iron Iron (75X40x5 mm), ( Length-1.50Mtr+0.2Mtr)mm x1 Nos. Per Pole
Shackle Insulator (16 kN)
D-Iron (U- Clamps)made of MS Flat 50x6mm with Nut & Bolts
LT Stay Set Complete i/c stay clamp)
Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set)
Stay Clamp / Full Clamp made of M.S. Flat of size (50 x 6mm).
Half Clamp made of MS Flat 50x6mm
Continous Earth wire (GI, 8 SWG) {alongwith 1 wire lengths and Additional 1% (Sag and wastage)} {0.102 kg/m}
Nuts and Bolts of various sizes (Galvanised / Coated) [Preferably 16mm² or more (with flat and spring washers)]
Aluminium Paint
LT earthing set
ERECTION OF LT LINE : Erection of LT Pole structure with Steel Tubular Pole 9 mtr. Long as per latest standard practices /specification of REC / HPSEBL : (including Digging of pit for pole, muffing of pole, erection of poles, refilling of pit & ramming , drilling of holes in pole and X-arm, fixing of X-arm, Shackle Insulators and painting of structure with Redoxide Primer & Aluminium Paint etc.Complete in all respect as per the standard practices / specifications of the REC /HPSEBL.
Erection of Stay Set (LT) as per latest standard practices /specification of REC / HPSEBLincluding digging of pit (size0.9*1.20*1.33),fixing of Stay Rod, filling and ramming of pit, nozzelling and tightening etc. complete in all respect.
Erection of Earthing Set (LT) as per latest standard practices /specification of REC / HPSEBLincluding digging of pit (size0.9*1.20*1.33),fixing of Stay Rod, filling and ramming of pit, nozzelling and tightening etc. complete in all respect.
Laying of Conductor, Stringing, Sagging of AAAC 7/3.15, 50mm² and binding with Insulators (3 wires) and fixing of jumper.
Laying of Earth wire with GI Wire 8SWG , Stringing, Sagging of and binding with Insulators.
2. Prov. extension of 3phase LT line in replacement of lengthy services with bare conductor from existing 63 KVA S/stn Kalsai in (E) section Jhaniyari under ESD No. I HPSEBL Hamirpur. T.S. No. 105/2025-26 W.B.S. No:32100257-001-HMR-LT-105. AAAC 7/3.15mm conductor for 3Φ and additional 1% (Sag, Jumpering and wastage} .
RCC Muff 2000 mm long with concrete filling material
Channel iron Iron (75X40x5 mm), ( Length-1.50Mtr+0.2Mtr)mm x1 Nos. Per Pole
Shackle Insulator (16 kN)
D-Iron (U- Clamps)made of MS Flat 50x6mm with Nut & Bolts
LT Stay Set Complete i/c stay clamp)
Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set)
Continous Earth wire (GI, 8 SWG) {alongwith 1 wire lengths and Additional 1% (Sag and wastage)} {0.102 kg/m}
Nuts and Bolts of various sizes (Galvanised / Coated) [Preferably 16mm² or more (with flat and spring washers)]
Aluminium Paint
LT egg insulator
LT earthing set
ERECTION OF LT LINE : Erection of LT Pole structure with Steel Tubular Pole 8/9 mtr. Long as per latest standard practices /specification of REC / HPSEBL : (including Digging of pit for pole, muffing of pole, erection of poles, refilling of pit & ramming , drilling of holes in pole and X-arm, fixing of X-arm, Shackle Insulators and painting of structure with Redoxide Primer & Aluminium Paint etc.Complete in all respect as per the standard practices / specifications of the REC /HPSEBL.
Erection of Stay Set (LT) as per latest standard practices /specification of REC / HPSEBLincluding digging of pit (size0.9*1.20*1.33),fixing of Stay Rod, filling and ramming of pit, nozzelling and tightening etc. complete in all respect.
Erection of Earthing Set (LT) as per latest standard practices /specification of REC / HPSEBLincluding digging of pit (size0.9*1.20*1.33),fixing of Stay Rod, filling and ramming of pit, nozzelling and tightening etc. complete in all respect.
Laying of Conductor, Stringing, Sagging of AAAC 7/3.15, 50mm² and binding with Insulators (3 wires) and fixing of jumper.
Laying of Earth wire with GI Wire 8SWG , Stringing, Sagging of and binding with Insulators.
Add loading/unloading charges of material from Store to site & sie to store including manual carriage as directed by site incharge for complete job.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.59 MB
SBD300.rar
Tender Documents • 7.83 MB
BOQ_182707.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid