| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹81.9 LAccepted-AOC | ₹81.9 L | L1 | Accepted-AOC LER |
| 2 | L2₹82.1 LRejected-Finance 157 5 K R GARDEN RAILWAY FEEDER ROAD VIRUDHUNAGAR 626 001 | VIRUDHUNAGAR | TAMIL NADU | 626001 | ₹82.1 L | L2 | Rejected-Finance 0.11 percentage LER |
| 3 | L3₹86.1 LRejected-Finance 95 PAVALI ROAD VIRUDHUNAGAR 626 001 | VIRUDHUNAGAR | TAMIL NADU | 626001 | ₹86.1 L | L3 | Rejected-Finance 4.73 percentage AER |
| Sl No | Description | Qty | Unit | SEENIVASAGANAICKER VENKATASUBBURAJ L2 | GMARIAPPANANDCO L3 | NARAYANA AND CO L1 |
|---|---|---|---|---|---|---|
| 1.00Part-1:- Elementary School to AD Colony at Veerarpatti Village 0/0-0/950 | ||||||
| 1.01 | Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfectly clean condition. All holes of hollows whether original, existing (or) produced by digging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed in all respect as per SI 17 (2). | 852.39 | Sq.m. | 6 ₹5,114.34 | 7 ₹5,966.73 | 5 ₹4,261.95 |
| 1.02 | Earth work excavation and depositing on back with an intial of 10m and lift 2m in hard stiff clay, stiff black cotton, hard red earth and earth mixed with small size boulders, hard gravelly soil etc., as per SS 20A including laying and spreading in layer etc.complete. | 781.36 | Cu.m. | 140 ₹1.1 L | 150 ₹1.2 L | 139 ₹1.1 L |
| 1.03 | Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp | 1,082.13 | Cu.m. | 522 ₹5.6 L | 550 ₹6.0 L | 520 ₹5.6 L |
| 1.04 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401 | 483.02 | Cu.m. | 2,339 ₹11.3 L | 2,500 ₹12.1 L | 2,338 ₹11.3 L |
| 1.05 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 355.16 | Cu.m. | 2,396 ₹8.5 L | 2,600 ₹9.2 L | 2,390 ₹8.5 L |
| 1.06 | Providing and laying of Prime coat using 7 Kg of Bituminous Emulsion-SS-1 for 10 sqm over the WMM surface preparatory to another bituminous construction over it including, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 2,841.3 | Sq.m. | 86 ₹2.4 L | 87 ₹2.5 L | 85 ₹2.4 L |
| 1.07 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 2,850 | Sq.m. | 20 ₹57,000 | 21 ₹59,850 | 20 ₹57,000 |
| 1.08 | Providing and laying Bituminous concrete using 0.13cum of 19.00-9.50mm, 0.17cum of 9.5-2.36, 0.26 cum of 2.36mm and below with 47.28 kgs of VG30 bitumen and 3.02 kgs of plastic wastes for 10 sq.m. and heating the aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5. | 71.25 | Cu.m. | 11,449 ₹8.2 L | 11,600 ₹8.3 L | 11,449 ₹8.2 L |
| 1.09 | Supply and fixing of HM stone of standard design and drawing as per IRC:26-1967, including painting and numbering etc., and all other incidental charges etc., complete. | 4 | Nos | 574 ₹2,296 | 600 ₹2,400 | 574 ₹2,296 |
Updated dates
Tender Value
Refer Docs
EMD Value
₹84,000
Closing Date
3 Mar 2026, 3:00 pmClosed
Project Director, DRDA, Virudhunagar
DRDA, Collectorate Virudhunagar
Upgradation/Strengthening of Roads - 2 nos. at Virudhunagar Block of Virudhunagar District under MGSMT-2025-26 (CGF-SFC Component for the year 2026-27) in Package no.15
2026_RDTN_660579_6
C6/621/2026 Dated 16.02.2026
Open Tender
Civil Works - Roads
180 days
Virudhunagar Block
Two Cover System. Refer tender document.
5 documents required · 5 mandatory
₹0
₹84,000
12 Mar 2026
18 Feb 2026
3 Mar 2026
18 Feb 2026
3 Mar 2026
22 Feb 2026
Part-1:- Elementary School to AD Colony at Veerarpatti Village 0/0-0/950
Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfectly clean condition. All holes of hollows whether original, existing (or) produced by digging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed in all respect as per SI 17 (2).
Earth work excavation and depositing on back with an intial of 10m and lift 2m in hard stiff clay, stiff black cotton, hard red earth and earth mixed with small size boulders, hard gravelly soil etc., as per SS 20A including laying and spreading in layer etc.complete.
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of Prime coat using 7 Kg of Bituminous Emulsion-SS-1 for 10 sqm over the WMM surface preparatory to another bituminous construction over it including, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminous concrete using 0.13cum of 19.00-9.50mm, 0.17cum of 9.5-2.36, 0.26 cum of 2.36mm and below with 47.28 kgs of VG30 bitumen and 3.02 kgs of plastic wastes for 10 sq.m. and heating the aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5.
Supply and fixing of HM stone of standard design and drawing as per IRC:26-1967, including painting and numbering etc., and all other incidental charges etc., complete.
Part-2:- Pasumpon Nagar -Veerarpatti Colony 0/0-0/800
Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfectly clean condition. All holes of hollows whether original, existing (or) produced by digging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed in all respect as per SI 17 (2).
Earth work excavation and depositing on back with an intial of 10m and lift 2m in hard stiff clay, stiff black cotton, hard red earth and earth mixed with small size boulders, hard gravelly soil etc., as per SS 20A including laying and spreading in layer etc.complete.
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of Prime coat using 7 Kg of Bituminous Emulsion-SS-1 for 10 sqm over the WMM surface preparatory to another bituminous construction over it including, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminous concrete using 0.13cum of 19.00-9.50mm, 0.17cum of 9.5-2.36, 0.26 cum of 2.36mm and below with 47.28 kgs of VG30 bitumen and 3.02 kgs of plastic wastes for 10 sq.m. and heating the aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5.
Supply and fixing of HM stone of standard design and drawing as per IRC:26-1967, including painting and numbering etc., and all other incidental charges etc., complete.
Providing Paver Block
Earth work excavation in all clauses of soil with initial lead of 10 m and initial lift 2 m except hard rock, blasting, etc., complete as per standard specification.
Cement concrete 1:4:8 mix using 40 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc.
Cement concrete 1:3:6 mix using 20 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401
Providing and Laying of Interlocking Concrete (Surface Textured) Block Pavements having thickness 80mm and compacted over a thin bedding M.Sand layer of 25 mm thickness and joints shall be filled by fine M.Sand of specified grading as per table 1500.6 of Specification of Rural roads-2014 and Technical specification clause 1504.
GST Amount for providing Service to the above Government Contract Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
15_VNR.pdf
Tender Documents • 0.58 MB
BOQ_792807.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid