Loading…
Loading…
Tender Value
₹51.8 L
EMD Value
₹1.0 L
Closing Date
29 Jun 2026, 6:00 pm5d left
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer PWD Dn Rajgarh (Churu)
Executive Engineer PWD Dn Rajgarh (Churu)
Construction of Missing Link Road from Beeran to Haryana border
2026_CEPWD_570120_1
E-NIT NO 05/2026-27 EE PWD DN RAJGARH
Open Tender
Civil Works
150 days
RAJGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Executive Engineer PWD Dn Rajgarh (Churu) /MDRSIL
₹1.0 L
Yes
22 Jun 2026
22 Jun 2026
30 Jun 2026
22 Jun 2026
29 Jun 2026
22 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Construction of Missing Link Road from Beeran to Haryana border | - | - | - | - | BI01010001010000000000000515BI0100001362 |
| 2 | Part A Earthwork | - | - | - | - | BI01010001010000000000000515BI0100001363 |
| 3 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201.By Mechanical Means In area of non-thorny jungle | 1 | Hectare | 12,513 | ₹12,500.49 | BI01010001010000000000000515BI0100001364 |
| 4 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRTH Specification Clause 301.3 | - | Cum | 31 | - | BI01010001010000000000000515BI0100001365 |
| 5 | Construction of Embankment with Material Obtained from Roadway Cutting Construction of embankment with approved materials deposited at site obtained from roadway cutting and excavation from drain and foundation or other structures graded and compacted to meet requirement of Tables 300-1 and 300-2 as per MoRTH Specification Clause 305.3 | - | cum | 40 | - | BI01010001010000000000000515BI0100001366 |
| 6 | Construction of reference bench mark (1 No.), working bench mark (4 Nos.) and near all drainage structures and bridges (as per direction of Engineer-in-charge), reference pillar/ burgees @ 50m interval on both side of formation width including marking of centre line, setting out curves, recording of levels, white washing and lettering etc. complete as per MoRTH specifications cl. 109. | 1 | Per Km | 58,945 | ₹58,886.06 | BI01010001010000000000000515BI0100001367 |
| 7 | Part B Metal and Metalling | - | - | - | - | BI01010001010000000000000515BI0100001368 |
| 8 | Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[MoRTH specification : Clause 401]. By mechanical means. G-I | - | Cum | 882 | - | BI01010001010000000000000515BI0100001369 |
| 9 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per MoRTH Specification Clause 404. using Crusher borken aggregate | - | Cum | 1,227 | - | BI01010001010000000000000515BI0100001370 |
| 10 | Part C BT Work | - | - | - | - | BI01010001010000000000000515BI0100001371 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_1014502.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid