SE EUDC- III (U.P)
Taalkatora power house lesa lucknow
Providing and fixing of spout, vacume interrupter, bas bar due to repairing and overhauling of 11 K.V. Rajajipuram old feeder feeded by 33/11 K.V. Sub-Station Talkatora in the area of E.U.D.D.-Aishbagh, LESA CIS Gomti, Lucknow
2021_MVVNL_611048_1
26/E.U.D.C.-III/2021-22
Open Tender
Miscellaneous Works
Fixed-rate
180 days
LUCKNOW
As per tender document
2 documents required · 2 mandatory
₹1,180
A/c.No-35140200000129 IFSC-BARBORAJLUC
₹2,000
10 Sept 2021
16 Aug 2021
24 Aug 2021
16 Aug 2021
23 Aug 2021
16 Aug 2021
Amount
Providing and fixing of spout schnerider make spout.
Providing and fixing spout schneider make vacume interrupter.
Providing and fixing of spout schnerider make bus bar.
Repairing and overhauling of 11 K.V. Switchgears, installed at Rajajipuram old feeder 33/11 K.V. Sub-Station Talkatora under E.U.D.D.-Aishbagh by removing of damaged/defective electrical components/spares due to excessive tripping, replacement of high charging lever, hold on triggerlink, on/off glass and frame, female contract, tripping coil and closing coil with plunger (which are not in working condition). That repairing and changing by required spare part. Complete oiling, greasing in moveable part. If required opening of bus bar panel cover plate, cleaning of bus bar with Dr beak paint, replacement of nut and bolts (to be provided by the contractor). After completion of repairing & overhauling works testing & energisation of system. (All sundry materials as required for overhauling shall be supplied by the contractor.
Note :- 1 All the material provided by contractor shall be as per norms of UPPCL/RESPO. 2 One carriage including loading/unloading from dump site to pit site is included in scope of work 3 During execution of work all risk will be of the contractor. 4 Contractor will provide all T & P, vehicle and man power. 5 All the old and used material should be taken on book. 6 The quantity may be vary ±10%.
POWER CONTROL AND SWITCHGEARS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .