| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.4 LAccepted-Finance NULL | ₹20.4 L | L1 | Accepted-Finance Lowest Bidder |
| 2 | L2₹24.3 L+₹3.9 L (19.1%)Rejected-Finance | ₹24.3 L+₹3.9 L (19.1%) | L2 | Rejected-Finance 2nd lowest Bidder |
| 3 | L2₹24.3 L+₹3.9 L (19.1%)Rejected-Finance AT SIARIA PO TALABARKOTE P SADAR DIST DHENKANAL | DHENKANAL | DHENKANAL | ODISHA | ₹24.3 L+₹3.9 L (19.1%) | L2 | Rejected-Finance 2nd lowest Bidder |
| 4 | L2₹24.3 L+₹3.9 L (19.1%)Rejected-Finance | ₹24.3 L+₹3.9 L (19.1%) | L2 | Rejected-Finance 2nd lowest Bidder |
| 5 | L2₹24.3 L+₹3.9 L (19.1%)Rejected-Finance | ₹24.3 L+₹3.9 L (19.1%) | L2 | Rejected-Finance 2nd lowest Bidder |
Tender Value
₹24.3 L
EMD Value
₹24,350
Closing Date
30 Mar 2026, 5:00 pmClosed
BDO,SADAR,DHENKANAL
Sadar Block Office, Dhenkanal
CONSTRUCTION OF GPLF BUILDING WITH MARKET COMPLEX
2026_PRBDN_127333_7
DSB-03/2025-26
Open Tender
Civil Works - Buildings
Percentage
180 days
Sadar Block
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹24,350
Yes
21 Sept 2026
17 Mar 2026
31 Mar 2026
17 Mar 2026
30 Mar 2026
17 Mar 2026
17 Mar 2026 - 30 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in Hard soil with in 50m initial lead & 1.5m Initial lift Inclunding Rough dressing & Brecking clods etc complete | 74.21 | cum | 274.15 | ₹20,344.67 |
| 2 | Sand filling in foundation with well watered & rammed with all cost of carriage & royality etc. comlete. | 76.23 | cum | 842.85 | ₹64,250.46 |
| 3 | C.C (1:3:6) with using 4cm size C.B.G metal with all cost of carriage & royality. | 19.1 | cum | 6,178.66 | ₹1,18,012.41 |
| 4 | Fly ash brick masonry in CM (1:6) for f&p including necessary scaffolding ,raking out joints, curring etc complete as per specfication and direction of the engineer in-charge | 6.78 | cum | 5,687.26 | ₹38,559.62 |
| 5 | Fly ash brick masonry in CM (1:6) for super structure including necessary scaffolding ,raking out joints, curring etc complete as per specfication and direction of the engineer in-charge | 39.51 | cum | 5,725.59 | ₹2,26,218.06 |
| 6 | R.C.C m20 with 20mm and down grade HGCB chips including hosting and layering, all cost conveyance,royalty (excluding cost of steel) | 64.08 | cum | 6,073.78 | ₹3,89,207.82 |
| 7 | Labour for cutting bending and binding and placing in position of reinforcenent steel for rcc work,incuding cost of baiding wire etc complete | 70.61 | qntl | 8,075.78 | ₹5,70,230.83 |
| 8.1 | Rigid Centering shuttering a) Foundation upto plinth | 124.85 | Sqm | 248.67 | ₹31,046.45 |
| 8.2 | Rigid Centering shuttering b) Column and Beam | 157.5 | Sqm | 1,204.49 | ₹1,89,707.18 |
| 8.3 | Rigid Centering shuttering c) Lintel | 27.46 | Sqm | 574.02 | ₹15,762.59 |
stage.html
html • 0.11 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.79 MB
BOQ_585418.xls
BOQ • 0.32 MB
DKLDTCN.pdf
Tender Documents • 1.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .