| 1.00Providing scaffolding charges for Vimanam/Gopuram with steel posts non- flammable shade wherever necessary for main formwork and providing ladder arrangements, centering steel sheet for working inspection etc., complete as per standard specification. Hire charges for errection and maintenance and removing the same on completion of work upto various height | |||||
| 1.10 | Vimanam height up to 25' | 208 | Sq.m | 382 ₹79,456 | 375 ₹78,000 Lowest |
| 1.20 | Vimanam height up to 15' | 314 | Sq.m | 285 ₹89,490 | 280 ₹87,920 Lowest |
| 2.00Ornamental Brick work in LM 1:2 mix using II Class ground Moulded Chamber Burnt Bricks of size 9" x 43/8" x 23/4"all vari vargams, moulds, sthambas,mukapatram,koodu,nasi,and all ornamental brick workcomplete panchavarnam agaraies, karnakoodus etc forming core walls rajagopuram/vimanams complete in cluding cement al labour chagers | |||||
| 2.10 | Kalkaram | 4 | Cu.m | 10,910 ₹43,640 | 10,800 ₹43,200 Lowest |
| 2.20 | Vimanam height up to 25' | 2 | Cu.m | 14,575 ₹29,150 | 14,420 ₹28,840 Lowest |
| 2.30 | Vimanam height up to 15' | 10 | Cu.m | 13,945 ₹1,39,450 | 13,800 ₹1,38,000 Lowest |
| 3.00Scraping the dust,pasi and old paint from the surface of Vimanams/Gopurams carefully including isolated bricks of brick work with out damaging the varivargam racking out the joints, cleaning the surface with water, including all working in heights,hire charges for special tools, brushes etc, complete | |||||
| 3.10 | Vimanam height up to 25' | 79 | Sq.m | 110 ₹8,690 | 108 ₹8,532 Lowest |
| 3.20 | Vimanam height up to 15' | 76 | Sq.m | 110 ₹8,360 | 108 ₹8,208 Lowest |
Tender Value
₹77.8 L
EMD Value
₹49,000
Closing Date
18 Jul 2025, 3:00 pmClosed
Executive officer
Arulmigu Veeranarayanaperumal temple, Kattumannarkoil Taluk and Cuddalore District.
Repairs and Renovations Of All Sannathies, Thirumathil Suvar and Providing Outer Praharam Cutstone flooring in Arulmigu Thirumoolanathar Temple, Thirumoolasthanam, Kattumannarkoil Taluk, Cuddalore District.
2025_HRCE_576521_1
53544/2023/G1
Open Tender
Civil Works
Item Rate
300 days
Thirumoolasthanam
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹49,000
6 Sept 2025
1 Jul 2025
18 Jul 2025
1 Jul 2025
18 Jul 2025
1 Jul 2025
Amount
Providing scaffolding charges for Vimanam/Gopuram with steel posts non- flammable shade wherever necessary for main formwork and providing ladder arrangements, centering steel sheet for working inspection etc., complete as per standard specification. Hire charges for errection and maintenance and removing the same on completion of work upto various height
Vimanam height up to 25'
Vimanam height up to 15'
Ornamental Brick work in LM 1:2 mix using II Class ground Moulded Chamber Burnt Bricks of size 9" x 43/8" x 23/4"all vari vargams, moulds, sthambas,mukapatram,koodu,nasi,and all ornamental brick workcomplete panchavarnam agaraies, karnakoodus etc forming core walls rajagopuram/vimanams complete in cluding cement al labour chagers
Kalkaram
Vimanam height up to 25'
Vimanam height up to 15'
Scraping the dust,pasi and old paint from the surface of Vimanams/Gopurams carefully including isolated bricks of brick work with out damaging the varivargam racking out the joints, cleaning the surface with water, including all working in heights,hire charges for special tools, brushes etc, complete
Vimanam height up to 25'
Vimanam height up to 15'
Providing vargapoochu over the core walls of vimanams/Gopurams,with lime mortar 1:1.5 complete including Shaping the mukhapathram, mahanasi, koodu all ornamental works to proper shape by embedding broken bricks of shaped/chiseled bricks , rough plastering with lime mortar 1:1.5 and finshing with final ornamental plastering nayam theervani including cost and conveyance of all materials, labour there fore lifting of materials, all working in heights curing with water etc complete including all extra for folding and including clearing from the vimanams/gopurams 100 sft superficial area for kalkaram.
Kalkaram
Vimanam height up to 25'
Vimanam height up to 15'
Sudhai , Vimanam
Painting with multicolour (panchavarnam) good emulsion paints complete for the vimanams/gopurams, including cost and conveyance of all materials , labours charges including artist painter, working in heights, lifting of materials,cost of brushes etc, complete which including all extra for foldings 100 sft
Kalkaram
Vimanam height up to 25'
Vimanam height up to 15'
Sudhai , Vimanam
Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification.
Supplying and filling in foundation, basement, etc with filling sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Cement Concrete 1:5:10 (One Cement, Five sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification
Removal of Brick work in cement Mortar Including all Labour Charges ect.,
Brick work in lime mortar 1:2 (one of lime, two of sand ) using Wire cut bricks for heritage works 9" x 4" X2" including cost and conveyance of all materials and labour charges and all other incidental charges etc complete complying with standard specifiction. (The lime should be sourced from pollachi which is highly iron fortified and suitable for structural and masonry.)
Foundation and basement
For Super Structure G.F
Plastering with lime mortar 1:1.5 (one of lime, one and half of sand ), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. (The lime should be sourced from pollachi which is highly iron fortified and suitable for structural and masonry.)
Painting two coats of newly plastered wall surface with ready mixed water based emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Numbering removing the Cutstone members use ful for reuse etc complete
Re-Fixing the cutstone members use ful for reuse etc complete
Restoration by providing herbal wash ( combination of Venthayam powder 20%, Siyakai powder 10%, Arapu powder 5%,Boonthikottai powder 50 %, Arugampul Powder 3%, Nannariver powder 3%, Vettiver powder 3%,Koraikizhangu powder 3%, Sembaruthi leaf powder 3% - Total 100%) are used for removal of lime wash on stone and oil senuge and appropriate methodology to restore the originalities of the existing granite structure including hire charges, scaffolding arrangements conveyance charges for tools and plants and machinaries to the workship spot and cleaning the site after completion of work etc, complete .
Pointing the stone joints with lime mortar 1:1.5 (one lime, and one & half of sand) ) including cost and conveyance of all materials and all labour charges etc complete
Removal of Damaged CC Floor in cement Mortar Including all Labour Charges ect., complete
Providing dressing the cutstone flooring and pointing with lime mortar 1:1.5 (one lime, one and half of sand) including all labour charges etc complete
Paving with cut stone flooring using cut stone of size 600x600mm and 100mm thick and all the sides are machine cutting, top surface is neatly dressed and pointing with lime mortar 1:1.5 including all materials and labour charges.
Supplying and fixing ornamental teak wood temple pattern door of following size with four leaves as per the drawing approved by the departmental officer. The outer frames are four horizontal and two vertical santling. Shutter frame are two scantling.The panel shall have 20mm thick best and approved quality teak wood plank. the shutter shall be equal planks. the rate including cost of the best quality teak wood, Brarees Hinges, Tower bolts, Air drops ornamental Handles. The door frame and Shutter gives two coat best quality synthetic enamel paint.
Door size 7' x 11'
Door size 3'6" x 6'
Door size 4' x 7'
Door size 3' x 5'6''
Supplying and fixing mild steel grill Gate including cost conveyance of all materials and fixing in position including priming coat etc complete with standard specifications.
Painting new wood work with two finishing coats of synthetic enamel ready mixed paint of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification.
Clean Removal of Damaged Lime Concrete Including all Labour Charges ect., complete
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the cutstone slab in a single layer of required slope and finished by beating the lime concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.
Finishing the roof top roof with lime mortar, 25mm thick including all labour charges etc comple with standard specification
Sub total
A.Balasubramani (BID ID -1405910)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_688944.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .