| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr Quoted ₹2.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.2 Cr−₹1.1 Cr (48.5%)Rejected-Finance | ₹1.2 Cr−₹1.1 Cr (48.5%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.4 Cr−₹94.8 L (40.1%)Rejected-Finance 14 15 VINAY NAGAR VIJITEM PUBLIC SCHOOL QUARSI RAMGHAT ROAD ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹1.4 Cr−₹94.8 L (40.1%) | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical 00 AGRA AGRA UTTAR PRADESH 282001 | AGRA | UTTAR PRADESH | 282001 | - | - | Rejected-Technical Work ecperience is not as per requirement. |
| 5 | Rejected-Technical | - | - | Rejected-Technical Form A and B not uploaded. |
| Sl No | Description | Qty | Unit | m/s satish chandra jaiswal L1 | M/S KAILASH NATH CHATURVEDI L2 | GOMATINETRA CONSTRUCTIONS L3 |
|---|---|---|---|---|---|---|
| 1.00 | Restoration & strengthening of bank and daowla in all type of soil mixed with chharry, karail, black cotton soil including all lead & lift with manual compaction dressing and T&P etc. required for proper completion of the work. | 1,601.6 | M3 | 150 ₹2,40,240 Lowest | 261 ₹4,18,017.6 | 221.07 ₹3,54,065.71 |
| 2.00 | Earth work in excavaion of foundation in ordinary soil/sandy loam, clay or sand including lift up to 1.50m and lead up to 30M | 1,672.36 | M3 | 77 ₹1,28,771.72 Lowest | 112 ₹1,87,304.32 | 94.86 ₹1,58,640.07 |
| 3.00 | Preparation of Sub-grade for Lining excluding cost of earth work. | 2,769 | M3 | 13 ₹35,997 Lowest | 17 ₹47,073 | 14.4 ₹39,873.6 |
| 4.00 | Laying .C.C.(1:3:6) with coarse sand ,cement, stone, ballast 20mm to 40mm in size in foundation including cost of all material, labour, T&P etc. | 404.38 | M3 | 4,200 ₹16,98,396 | 3,600 ₹14,55,768 Lowest | 4,314.28 ₹17,44,608.55 |
| 5.00 | C.R.Stone masonry in 1:3 cement sand mortar including cost of all material for proper completion of work. | 843.6 | M3 | 4,800 ₹40,49,280 | 4,200 ₹35,43,120 Lowest | 4,783.18 ₹40,35,090.65 |
| 6.00 | Deep struck cement pointing in 1:2 cement, sand mortar on stone masonry including cost of all materials labour T&P etc. required for praper for completion of work. | 2,685.31 | M2 | 90 ₹2,41,677.9 Lowest | 150.1 ₹4,03,065.03 | 127.13 ₹3,41,383.46 |
| 7.00 | 1st class brick masonry in 1:3 cement sand mortar including cost of all material for proper completion of work. | 99.05 | M3 | 4,800 ₹4,75,440 Lowest | 5,100 ₹5,05,155 | 5,141.71 ₹5,09,286.38 |
| 8.00 | Cement pointing in 1:2 cement, sand mortar on brick masonry including cost of all materials labour T&P etc. required for praper for completion of work. | 253.89 | M2 | 80 ₹20,311.2 Lowest | 137.1 ₹34,808.32 | 116.12 ₹29,481.71 |
| 9.00 | Providing and fixing of 150 mm dia HDPE 6 kg/m² pressure Pipe Avg. = (12.00+8.00)/2= 10.00 | 210 | MTR | 720 ₹1,51,200 | 600 ₹1,26,000 Lowest | 762.3 ₹1,60,083 |
| 10.00 | Centering and shuttering of R.C.C. work including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 173.6 | M2 | 700 ₹1,21,520 | 640 ₹1,11,104 Lowest | 711.48 ₹1,23,512.93 |
Tender Value
₹1.7 Cr
EMD Value
₹3.3 L
Closing Date
18 Mar 2026, 3:00 pmClosed
SE
SE IRRIIGATION WORK CIRCLE PRAYAGRAJ
Restoration of Jogni Dy. from Km. 3.200 to Km. 15.400 and demarcation of canal land.
2026_UPIDC_1124343_5
07/SE/2025-26
Open Tender
Civil Works
Item Wise
365 days
JOGNI DY
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹3.3 L
Yes
SE IRRIIGATION WORK CIRCLE PRAYAGRAJ
10 Apr 2026
12 Mar 2026
18 Mar 2026
12 Mar 2026
18 Mar 2026
12 Mar 2026
12 Mar 2026
Restoration & strengthening of bank and daowla in all type of soil mixed with chharry, karail, black cotton soil including all lead & lift with manual compaction dressing and T&P etc. required for proper completion of the work.
Earth work in excavaion of foundation in ordinary soil/sandy loam, clay or sand including lift up to 1.50m and lead up to 30M
Preparation of Sub-grade for Lining excluding cost of earth work.
Laying .C.C.(1:3:6) with coarse sand ,cement, stone, ballast 20mm to 40mm in size in foundation including cost of all material, labour, T&P etc.
C.R.Stone masonry in 1:3 cement sand mortar including cost of all material for proper completion of work.
Deep struck cement pointing in 1:2 cement, sand mortar on stone masonry including cost of all materials labour T&P etc. required for praper for completion of work.
1st class brick masonry in 1:3 cement sand mortar including cost of all material for proper completion of work.
Cement pointing in 1:2 cement, sand mortar on brick masonry including cost of all materials labour T&P etc. required for praper for completion of work.
Providing and fixing of 150 mm dia HDPE 6 kg/m² pressure Pipe Avg. = (12.00+8.00)/2= 10.00
Centering and shuttering of R.C.C. work including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Reinforcement of RCC work including cost of steel, cutting, bending, placing in position & binding with 16 gauge binding wire including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Cement concrete M-15 1:2:4 in foundation including cost of all material and labour T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
Providing and laying C.C.(1:1.5:3)with coarse sand cement and 10mm to 20mm crushed stone grite including cost of material, labour, T&Petc.
Colour washing of two coat of parapet including cost of all materials,labour and T&P etc.
Fixing wheel guard stone inclding cost of all of all materials, labours and T&P etc.
E/W in embankment for restoration of canal section on VRB Nearby in all type of soil mixed including all lead ,lift dressing , etc.
Providing superviser for watching and warding of work as per direction of Engineer in charge.
Fixing of RCC Precast Boundry piller including cost of all materials, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
Painting of RCC Precast boundry piller size 250x250x900 (mm) including cost of material, labour, T&Petc. proper completion of work as per direction of Engineer-in-charge.
Uprooting of behaya / sarpat / gondi / elephant grass and other weeds and its disposal including all cost of material, labour and T&P etc. required for proper completion of the work.
Earth work for preparing Sub-base and Road embankment and patari including all cost of material, labour and T&P etc. required for proper completion of the work.
Dry brick on edge soling , including all cost of material, labour and T&P etc. required for proper completion of the work.
stage.html
html • 0.05 MB
techsummary_2095277.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
TosDOC.pdf
Tender Documents • 2.60 MB
BOQ_2095277.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .