Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr Quoted ₹2.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.2 CrRejected-Finance | ₹1.2 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹1.4 CrRejected-Finance 14 15 VINAY NAGAR VIJITEM PUBLIC SCHOOL QUARSI RAMGHAT ROAD ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹1.4 Cr | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical 00 AGRA AGRA UTTAR PRADESH 282001 | AGRA | UTTAR PRADESH | 282001 | - | - | Rejected-Technical Work ecperience is not as per requirement. |
| 5 | Rejected-Technical | - | - | Rejected-Technical Form A and B not uploaded. |
| Sl No | Description | Qty | Unit | m/s satish chandra jaiswal L1 | M/S KAILASH NATH CHATURVEDI L2 | GOMATINETRA CONSTRUCTIONS L3 |
|---|---|---|---|---|---|---|
| 1.00 | Restoration & strengthening of bank and daowla in all type of soil mixed with chharry, karail, black cotton soil including all lead & lift with manual compaction dressing and T&P etc. required for proper completion of the work. | 1,601.6 | M3 | 150 ₹2,40,240 | 261 ₹4,18,017.6 | 221.07 ₹3,54,065.71 |
| 2.00 | Earth work in excavaion of foundation in ordinary soil/sandy loam, clay or sand including lift up to 1.50m and lead up to 30M | 1,672.36 | M3 | 77 ₹1,28,771.72 | 112 ₹1,87,304.32 | 94.86 ₹1,58,640.07 |
| 3.00 | Preparation of Sub-grade for Lining excluding cost of earth work. | 2,769 | M3 | 13 ₹35,997 | 17 ₹47,073 | 14.4 ₹39,873.6 |
| 4.00 | Laying .C.C.(1:3:6) with coarse sand ,cement, stone, ballast 20mm to 40mm in size in foundation including cost of all material, labour, T&P etc. | 404.38 | M3 | 4,200 ₹16,98,396 | 3,600 ₹14,55,768 | 4,314.28 ₹17,44,608.55 |
| 5.00 | C.R.Stone masonry in 1:3 cement sand mortar including cost of all material for proper completion of work. | 843.6 | M3 | 4,800 ₹40,49,280 | 4,200 ₹35,43,120 | 4,783.18 ₹40,35,090.65 |
| 6.00 | Deep struck cement pointing in 1:2 cement, sand mortar on stone masonry including cost of all materials labour T&P etc. required for praper for completion of work. | 2,685.31 | M2 | 90 ₹2,41,677.9 | 150.1 ₹4,03,065.03 | 127.13 ₹3,41,383.46 |
| 7.00 | 1st class brick masonry in 1:3 cement sand mortar including cost of all material for proper completion of work. | 99.05 | M3 | 4,800 ₹4,75,440 | 5,100 ₹5,05,155 | 5,141.71 ₹5,09,286.38 |
| 8.00 | Cement pointing in 1:2 cement, sand mortar on brick masonry including cost of all materials labour T&P etc. required for praper for completion of work. | 253.89 | M2 | 80 ₹20,311.2 | 137.1 ₹34,808.32 | 116.12 ₹29,481.71 |
| 9.00 | Providing and fixing of 150 mm dia HDPE 6 kg/m² pressure Pipe Avg. = (12.00+8.00)/2= 10.00 | 210 | MTR | 720 ₹1,51,200 | 600 ₹1,26,000 | 762.3 ₹1,60,083 |
| 10.00 | Centering and shuttering of R.C.C. work including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 173.6 | M2 | 700 ₹1,21,520 | 640 ₹1,11,104 | 711.48 ₹1,23,512.93 |
Tender Value
₹1.7 Cr
EMD Value
₹3.3 L
Closing Date
18 Mar 2026, 3:00 pmClosed
SE
SE IRRIIGATION WORK CIRCLE PRAYAGRAJ
Restoration of Jogni Dy. from Km. 3.200 to Km. 15.400 and demarcation of canal land.
2026_UPIDC_1124343_5
07/SE/2025-26
Open Tender
Civil Works
365 days
JOGNI DY
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹3.3 L
Yes
SE IRRIIGATION WORK CIRCLE PRAYAGRAJ
10 Apr 2026
12 Mar 2026
18 Mar 2026
12 Mar 2026
18 Mar 2026
12 Mar 2026
12 Mar 2026
Restoration & strengthening of bank and daowla in all type of soil mixed with chharry, karail, black cotton soil including all lead & lift with manual compaction dressing and T&P etc. required for proper completion of the work.
Earth work in excavaion of foundation in ordinary soil/sandy loam, clay or sand including lift up to 1.50m and lead up to 30M
Preparation of Sub-grade for Lining excluding cost of earth work.
Laying .C.C.(1:3:6) with coarse sand ,cement, stone, ballast 20mm to 40mm in size in foundation including cost of all material, labour, T&P etc.
C.R.Stone masonry in 1:3 cement sand mortar including cost of all material for proper completion of work.
Deep struck cement pointing in 1:2 cement, sand mortar on stone masonry including cost of all materials labour T&P etc. required for praper for completion of work.
1st class brick masonry in 1:3 cement sand mortar including cost of all material for proper completion of work.
Cement pointing in 1:2 cement, sand mortar on brick masonry including cost of all materials labour T&P etc. required for praper for completion of work.
Providing and fixing of 150 mm dia HDPE 6 kg/m² pressure Pipe Avg. = (12.00+8.00)/2= 10.00
Centering and shuttering of R.C.C. work including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Reinforcement of RCC work including cost of steel, cutting, bending, placing in position & binding with 16 gauge binding wire including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Cement concrete M-15 1:2:4 in foundation including cost of all material and labour T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
Providing and laying C.C.(1:1.5:3)with coarse sand cement and 10mm to 20mm crushed stone grite including cost of material, labour, T&Petc.
Colour washing of two coat of parapet including cost of all materials,labour and T&P etc.
Fixing wheel guard stone inclding cost of all of all materials, labours and T&P etc.
E/W in embankment for restoration of canal section on VRB Nearby in all type of soil mixed including all lead ,lift dressing , etc.
Providing superviser for watching and warding of work as per direction of Engineer in charge.
Fixing of RCC Precast Boundry piller including cost of all materials, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
Painting of RCC Precast boundry piller size 250x250x900 (mm) including cost of material, labour, T&Petc. proper completion of work as per direction of Engineer-in-charge.
Uprooting of behaya / sarpat / gondi / elephant grass and other weeds and its disposal including all cost of material, labour and T&P etc. required for proper completion of the work.
Earth work for preparing Sub-base and Road embankment and patari including all cost of material, labour and T&P etc. required for proper completion of the work.
Dry brick on edge soling , including all cost of material, labour and T&P etc. required for proper completion of the work.
stage.html
html • 0.05 MB
techsummary_2095277.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
TosDOC.pdf
Tender Documents • 2.60 MB
BOQ_2095277.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid