Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 CrAccepted-AOC 26 10B KRISHNAPURAM KADAIYANALLUR TENKASI TALUK TENKASI 627 759 | TENKASI | TAMIL NADU | 627759 | ₹3.2 Cr | L1 | Accepted-AOC LOW RATE |
| 2 | L2₹3.3 CrRejected-Finance | ₹3.3 Cr | L2 | Rejected-Finance hIgh Amount Quoted |
| Sl No | Description | Qty | Unit | K Rajamohammed L1 | SUBBIAH ARUMUGAM L2 |
|---|---|---|---|---|---|
| 1.00 | Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 250mm thick specification including premixing the materials with water at OMC in mechnanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH | 2,495 | Cum | 2,616.5 ₹65.3 L | 2,710 ₹67.6 L |
| 2.00 | Providing and laying Prime Coat over WBM/ WMM Surface using 7Kg of Emulsion Bitumen (SSI) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5 | 24,950 | Sqm | 82.55 ₹20.6 L | 85.5 ₹21.3 L |
| 3.00 | Providing and laying Tack Coat over WBM/ WMM Surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 | 24,950 | Sqm | 19.15 ₹4.8 L | 22.7 ₹5.7 L |
| 4.00 | Providing and laying 50mm Consolidated thick Dense Bituminous Mecadam using 0.24 cum of 26.50 – 13.20 mm Graded metal and 0.25 cum of 13.20 – 2.36 mm Grade metal and 0.23 cum of 2.36 mm & below with 53.20 kgs of 60/70 Grade Bulk bitumen for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 505 of MORTH Rev-5 | 1,248 | Cum | 10,971.25 ₹1.4 Cr | 11,250 ₹1.4 Cr |
| 5.00 | Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 46.28 kgs of 60/70 Grade Bulk bitumen and 4.02 kg of shredded Plastic waste for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5 | 749 | Cum | 11,579.6 ₹86.7 L | 11,970 ₹89.7 L |
| 6.00 | Providing and laying Well Gravel to the specified thick including cost and conveyance of Well gravel from approved quarry and stocking the same at road side to Departmental guage for premeasurement as directed by the Departmental Officers including labour charges for spreading in layers not exceeding 75 mm thick (or) as specified by the departmental officers, levelling, sectioning etc., and all other charges for tools and plants employed for the work and all other incidental charges such as barricading and providing danger lights etc., complete as per standard specification. as per clause 301 & 305 of MORTH | 372 | Cum | 277.4 ₹1.0 L | 305 ₹1.1 L |
| 7.00 | Providing and Laying of Hot Applied Thermo Plastic Compound 2.5 mm Thick Inculding Reflectorising Glass Beads @250 GmsPer Sqm area, Thickness of 2.5mm Exculsive of Surface applied Glass Beads as per IRC 35 The Funished Surface to be Level Uniform and Free From Streaks and Holes etc Complete | 759 | sqmt | 890 ₹6.8 L | 925 ₹7.0 L |
Tender Value
₹3.9 Cr
EMD Value
₹3.9 L
Closing Date
29 May 2025, 3:00 pmClosed
Executive Officer
Pudur(S) Town Panchayat
Strengthening of BT Road at Lalakudiyiruppu Post Office to Railway gate main Road 1Lalakudiyiruppu Vadakasi amman Kovil street to railway gate Road 1Lalakudiyiruppu Adithanar Govt school south street Road 1Lalakudiyiruppu river road 2 Poolankudiyiru
2025_DTP_561275_1
33(1)_2025_A1
Open Tender
Civil Works - Roads
180 days
Pudur(S) Town Panchayat
Class II
4 documents required · 4 mandatory
₹0
₹3.9 L
Yes
29 Apr 2026
24 May 2025
29 May 2025
24 May 2025
29 May 2025
24 May 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.70 MB
BOQ_670220.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid