| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹81,313Accepted-Finance | ₹81,313 | L-1 | Accepted-Finance qualified |
| 2 | L-2₹81,673+₹360 (0.44%)Accepted-Finance | ₹81,673+₹360 (0.44%) | L-2 | Accepted-Finance qualified |
| 3 | L-3₹84,434+₹3,121 (3.84%)Accepted-Finance | ₹84,434+₹3,121 (3.84%) | L-3 | Accepted-Finance qualified |
| 4 | L-4₹86,564+₹5,251 (6.46%)Accepted-Finance | ₹86,564+₹5,251 (6.46%) | L-4 | Accepted-Finance qualified |
| 5 | L-5₹90,349+₹9,036 (11.1%)Accepted-Finance | ₹90,349+₹9,036 (11.1%) | L-5 | Accepted-Finance qualified |
Tender Value
Refer Docs
EMD Value
₹60,000
Closing Date
2 Apr 2021, 4:00 pmClosed
Executive Engineer
Electric Division JPDCL Udhampur
erection and maintenance works
2021_PDD_120879_1
Ed/UDH/45 of 2020-21, 22-03-2021
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
District Udhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Executive Engineer Electric Division JPDCL
₹60,000
9 Jul 2021
23 Mar 2021
5 Apr 2021
23 Mar 2021
2 Apr 2021
23 Mar 2021
23 Mar 2021 - 27 Mar 2021
Erection/Maintenance of HT/LT Line & Creation/Augmentation of Substations
Line Survey
Route clearance/Branch cutting of trees
Unloading of 11 mtr long ST Poles
Unloading of 9 mtr long ST Poles
Unloading of 8 mtr long ST Poles
Unloading of 9 mtr long PCC Poles
Unloading of 8 mtr long PCC Poles
Unloading of other material
Erection of 11 mtr long ST Pole (ST-410SP56)
Erection of 9 mtr long ST Pole (ST-410SP33)
Erection of 8 mtr long ST Pole (ST-410SP15)
Erection of 9 mtr long PCC Pole
Erection of 8 mtr long PCC Pole
Laying, Stringing, tensioning,binding of 0.05 ACSR (Rabbit conductor), fixing of hardware fittings and jointing for HT/ LT Line
Laying, Stringing, tensioning, binding of 0.03 ACSR (Weasel conductor), fixing of hardware fittings and jointing for HT/ LT Line
Laying, Stringing, tensioning, binding of 0.02 ACSR (Squirrel conductor), fixing of hardware fittings and jointing for HT/ LT Line
Erection of LT AB Cable (3X50 + 1X35 mm2)
Fixing of jumper sets for Tension Points including cutting of conductor of requisite length for HT Lines (set of 3 jumpers )
Fixing of bobin insulator
Fixing of barbed wire for anti climbing
Erection of Danger plates with clamps
Erection of Anti Climbing devices with clamps
Making and fixing of cradle guard of 8 SWG G I Wire comprising of 10 no.cross pieces per span including connection to earth on both ends
Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip 50X6 for neutral earthing and size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.
Earthing of poles complete with a spiral placed 1.5 m below ground level including making of spiral of 8 SWG GI Wire
Earthing of poles complete with 2.5 m long 20 mm Rod Earthing in soft soil
Earthing of poles complete with 2.5 m long 20 mm Rod Earthing in hard soil
Painting of ST poles 8 mtr., crossarms, clamps etc. with one coat of Red oxide Paint and 2 coats of Aluminium paint on 1 no. pole
Painting of ST poles 9 mtr., crossarms, clamps etc. with one coat of Red oxide Paint and 2 coats of Aluminium paint on 1 no. pole
Painting of ST poles 11 mtr., crossarms, clamps etc. with one coat of Red oxide Paint and 2 coats of Aluminium paint on 1 no. pole
Painting of crossarms, clamps etc. with one coat of Red oxide Paint and 2 coats of Aluminium paint on 1 no. pole
Erection of Guy Rod complete with guy insulator 2 no, turn buckles 2 no 1.8 m long 16mm dia solid GS Stay rod, anchor plate (200x200x6mm)2 no.,7/3.15 mm Guy wire complete including embedding of guy rod
Cement bottoming as per REC Standards in 1:2:4 mix 0.5cum /pole including cost of material
Fixing of crossarms with clamps upto and including 3feet
Fixing of crossarms with clamps above 3ft and including 6feet
Fixing of crossarms with clamps above 6ft and including 9feet
Fixing of V crossarms
Fixing of Angle Iron braces with clamps upto 3 feet long
Fixing of Angle Iron braces with clamps above 3 feet and upto 5 feet long
Fixing of Angle Iron braces with clamps above 5 feet and upto 10 feet long
Fixing of 11KV Pin insulator
Unloading of 25 KVA Transformer
Unloading of 63KVA Transformer
Unloading of 100KVA Transformer
Unloading of 250KVA Transformer
Unloading of 400KVA Transformer
Unloading of 630 KVA Transformer
loading of 25 KVA Transformer
loading of 63KVA Transformer
loading of 100KVA Transformer
loading of 250KVA Transformer
loading of 400KVA Transformer
loading of 630 KVA Transformer
Erection of 11KV Lightning Arrestor Station Type
Erection of 11KV Lightning Arrestor Line Type
Erection of 11KV G.O Set
Erection of 11KV DO/HG Fuse Set
Erection of 11KV Link Set
Erection of HT/LT Leads
Erection of 1 phase 2 wire energy meter
Erection of 3 phase 4 wire prodigy energy meter
Erection of LT spacers
Erection of LT Cable twin core 4/6 sqmm
Erection of LT Cable twin core 10/16 sqmm
Fixing of crossarm bed for placement of Transformer
Installation, testing and commissioning of 25KVA Transformer on crossarm bed including HV/LV earthing connection
Installation, testing and commissioning of 63KVA Transformer on crossarm bed including HV/LV earthing connection
Installation, testing and commissioning of 100KVA Transformer on crossarm bed including HV/LV earthing connection
Installation, testing and commissioning of 250KVA Transformer on crossarm bed including HV/LV earthing connection
Installation, testing and commissioning of 400KVA Transformer on crossarm bed including HV/LV earthing connection
Installation, testing and commissioning of 630KVA Transformer on crossarm bed including HV/LV earthing connection
Installation of LT Circuit including laying of cables to and from switchgear and installation of Switchgear including thimbling of cable, terminating, making end connections upto 25KVA
Installation of LT Circuit including laying of cables to and from switchgear and installation of Switchgear including thimbling of cable, terminating, making end connections ABOVE 25KVA upto 100KVA
Installation of LT Circuit including laying of cables to and from switchgear and installation of Switchgear including thimbling of cable,terminating, making end connections Above 100KVA upto 630KVA
Erection of 11KV Disc insulators with hardware fitting in each tension stringing
Fixing of top clamp for Pin Insulators
Fixing of U/M clamp for LV Shackle Insulators
Crimping of thimbles to the cable ends for replacement/repair worksupto 70mm sq
Crimping of thimbles to the cable ends for replacement/repair works above 70 mm sq upto 185mm sq
Crimping of thimbles to the cable ends for replacement/repair works above 185mm sq
Carriage of ST poles 11mtr long from unloading/stacking site to erection site upto first 100 mtrs IN PLAIN AREAS
Carriage of ST poles 11mtr long from unloading/ stacking site to erection site for every additional 50 mtrs IN PLAIN AREAS
Carriage of ST poles 9m long from unloading/stacking site to erection site upto first 100 mtrs IN PLAIN AREAS
Carriage of ST poles 9m long from unloading/ stacking site to erection site for every additional 50 mtrs IN PLAIN AREAS
Carriage of ST poles 8m long from unloading/stacking site to erection site upto first 100 mtrs IN PLAIN AREAS
Carriage of ST poles 8m long from unloading/ stacking site to erection site for every additional 50 mtrs IN PLAIN AREAS
Carriage of PCC poles 9m long from unloading/stacking site to erection site upto first 100 mtrs IN PLAIN AREAS
Carriage of PCC poles 9m long from unloading/ stacking site to erection site for every additional 50 mtrs IN PLAIN AREAS
Carriage of PCC poles 8m long from unloading/stacking site to erection site upto first 100 mtrs IN PLAIN AREAS
Carriage of PCC poles 8m long from unloading/ stacking site to erection site for every additional 50 mtrs IN PLAIN AREAS
Carriage of ACSR condutor/Steel/accessories from stacking site to erection site upto first 100 mtrs IN PLAIN AREAS
Carriage of ACSR condutor/Steel/accessories from stacking site to erection site for every additional 50 mtrs IN PLAIN AREAS
Carriage of ST poles 11m long from unloading/stacking site to erection site upto first 100 mtrs IN SEMI HILLY AREAS
Carriage of ST poles 11m long from unloading/ stacking site to erection site for every additional 50 mtrs IN SEMI HILLY AREAS
Carriage of ST poles 9m from unloading/stacking site to erection site upto first 100 mtrs IN SEMI HILLY AREAS
Carriage of ST poles 9m long from unloading/ stacking site to erection site for every additional 50 mtrs IN SEMI HILLY AREAS
Carriage of ST poles 8m long from unloading/stacking site to erection site upto first 100 mtrs IN SEMI HILLY AREAS
Carriage of ST poles 8m long from unloading/ stacking site to erection site for every additional 50 mtrs IN SEMI HILLY AREAS
Carriage of PCC poles 9m long from unloading/stacking site to erection site upto first 100 mtrs IN SEMI HILLY AREAS
Carriage of PCC poles 9m long from unloading/ stacking site to erection site for every additional 50 mtrs IN SEMI HILLY AREAS
Carriage of PCC poles 8m long from unloading/stacking site to erection site upto first 100 mtrs IN SEMI HILLY AREAS
Carriage of PCC poles 8m long from unloading/ stacking site to erection site for every additional 50 mtrs IN SEMI HILLY AREAS
Carriage of ACSR condutor/Steel/accessories from stacking site to erection site upto first 100 mtrs IN SEMI HILLY AREAS
Carriage of ACSR condutor//Steel/accessories from stacking site to erection site for every additional 50 mtrsIN SEMI HILLY AREAS
Carriage of ST poles 9m long from unloading/stacking site to erection site upto first 100 mtrs IN HILLY AREAS
Carriage of ST poles 9m long from unloading/ stacking site to erection site for every additional 50 mtrs IN HILLY AREAS
Carriage of ST poles 8m long from unloading/stacking site to erection site upto first 100 mtrs IN HILLY AREAS
Carriage of ST poles 8m long from unloading/ stacking site to erection site for every additional 50 mtrs IN HILLY AREAS
Carriage of PCC poles 9m long from unloading/stacking site to erection site upto first 100 mtrs IN HILLY AREAS
Carriage of PCC poles 9m long from unloading/ stacking site to erection site for every additional 50 mtrs IN HILLY AREAS
Carriage of PCC poles 8m long from unloading/stacking site to erection site upto first 100 mtrs IN HILLY AREAS
Carriage of PCC poles 8m long from unloading/ stacking site to erection site for every additional 50 mtrs IN HILLY AREAS
Carriage of ACSR Weasel condutor/Steel/accessories from stacking site to erection site upto first 100 mtrs IN HILLY AREAS
Carriage of ACSR Weasel condutor//Steel/accessories from stacking site to erection site for every additional 50 mtrs IN HILLY AREAS
Fabrication, Instalation, Testing and commissioning of lt fuse set comprising of requisite Al bus bar mounted on LT polymer insulator assembled on angle iron frame including necessary clamps
Carriage of 63KVA Xmer from unloading/stacking site to erection site upto first 100 mtrs in hilly areas
Carriage of 63KVA Xmer from unloading/ stacking site to erection site for every additional 50 mtrs IN hilly areas
Carriage of 25KVA Xmer from unloading/stacking site to erection site upto first 100 mtrs in hilly areas
Carriage of 25KVA Xmer from unloading/ stacking site to erection site for every additional 50 mtrs IN hilly areas
Carriage of LT AB Cable (3X50 + 1X35 mm2) from unloading/stacking site to erection site upto first 100 mtrs
Carriage of LT AB Cable (3X50 + 1X35 mm2) from unloading/ stacking site to erection site for every additional 50 mtrs
Straightening of 11 mtr long ST Pole (ST-410SP56)
Straightening of 9 mtr long ST Pole (ST-410SP33)
Straightening of 8 mtr long ST Pole (ST-410SP15)
Straightening of 9 mtr long PCC Pole
Straightening of 8 mtr long PCC Pole
Dismantling of 11 mtr long ST Pole (ST-410SP56)
Dismantling of 9 mtr long ST Pole (ST-410SP33)
Dismantling of 8 mtr long ST Pole (ST-410SP15)
Dismantling of 9 mtr long PCC Pole
Dismantling of 8 mtr long PCC Pole
Dismantling of 11KV Lightning Arrestor Station Type
Dismantling of 11KV Lightning Arrestor Line Type
Dismantling of 11KV G.O Set
Dismantling of 11KV DO/HG Fuse Set
Dismantling of 11KV Link Set
Dismantling of HT/LT Leads
Dismantling of ACSR Rabbit Conductor
Dismantling of ACSR Weasel Conductor
Dismantling of ACSR Squirrel Conductor
Dismantling of LT Cable twin core 4/6 sqmm
Dismantling of LT Cable twin core 10/16 sqmm
Dismantling of HT Jumper Sets (Set of 3 Jumpers)
Tightening of loose conductor
ADITYA SHARMA
sanjay kumar
M/s GCS Associates
M/s Wazir Agencies
Malik Brothers Electrical Contractor and Suppliers
Raina Builders and Suppliers
R K ELECTRICALS CONSTRUCTION AND SUPPLIERS
RAGHAV SARIN
M/S JCM CONSTRUCTIONS
VAISHALI ELECTRICALS AND GENERAL ORDER SUPPLIERS
R S CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .