| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹73.2 LAccepted-AOC 107 GANDHI NAGAR ATUR POST TALUK SALEM DT 636 102 | SALEM | TAMIL NADU | 636102 | ₹73.2 L | L1 | Accepted-AOC Accept |
| 2 | L2₹74.5 LRejected-Finance 53 19 BRINDABON MULLICK LANE KADAMTALA HOWRAH WEST BENGAL 711101 UDYAM WB 08 0004810 19AEBPC0017L2ZW R M MII STATUS AS VERIFIED | HOWRAH | WEST BENGAL | 711101 | ₹74.5 L | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | PHOENIX & CO L2 | RASI CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Providing, laying, spreading and compacting wet mix macadam with clean, crushed, graded aggregates and granular material and finished in accordance with the requirements of the specifications and thickness as per approved plans or as directed by the Engineer. as per as per standar specification MORTH IV 406 | 139 | m3 | 2,550 ₹3,54,450 | 2,446 ₹3,39,994 |
| 2.00 | Providing and laying Prime Coat over WMM surface using 7Kgs of Bitumen emulsion SS I for 10sqm including labour charges for preparing the surface and applying the required quantity of bitumen as teak coat etc., complete. | 1,382 | M2 | 90 ₹1,24,380 | 86 ₹1,18,852 |
| 3.00 | Providing and laying Tack coat over WMM surface treated with prime coat using 2.5kgs of Bitumen’s VG 30 for 10sqm including labour charges for preparing ;the surface and applying the required quantity ofl bitumen as teak coat etc., comple. | 1,382 | M2 | 21 ₹29,022 | 20 ₹27,640 |
| 4.00 | Providing and laying Tack Coat over existing B.T Surface using 2.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for prparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 | 6,436 | M2 | 30 ₹1,93,080 | 28 ₹1,80,208 |
| 5.00 | Providing and laying 50mm Consolidated thick Dense Bituminous Mecadam using 0.24 cum of 26.50 – 13.20 mm Graded metal and 0.25 cum of 13.20 – 2.36 mm Grade metal and 0.23 cum of 2.36 mm & below with 53.20 kgs of 60/70 Grade Bulk bitumen for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 505 of MORTH Rev-5 | 391 | M3 | 10,500 ₹41,05,500 | 10,383 ₹40,59,753 |
| 6.00 | Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 46.28 kgs of 60/70 Grade Bulk bitumen and 4.02 kg of shredded Plastic waste for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5 | 235 | M3 | 11,250 ₹26,43,750 | 11,045 ₹25,95,575 |
Tender Value
₹88 L
EMD Value
₹1.8 L
Closing Date
23 Jan 2026, 3:00 pmClosed
Executive officer Gangavalli Town Panchayat Salem
68, Attur main road, Gangavalli Town panchayat. Salem District
Restoration of BT road at ward no 01 West Kattukotai Mp Garden 1 to 17 cross in gangavalli town panchayat Salem District TURIF 2025-26
2026_DTP_641770_1
390/2025
Open Tender
Civil Works - Roads
180 days
68, Attur main road, Gangavalli Town panchayat. Sa
I and II
3 documents required · 3 mandatory
₹0
₹1.8 L
6 Feb 2026
10 Jan 2026
23 Jan 2026
10 Jan 2026
23 Jan 2026
10 Jan 2026
Providing, laying, spreading and compacting wet mix macadam with clean, crushed, graded aggregates and granular material and finished in accordance with the requirements of the specifications and thickness as per approved plans or as directed by the Engineer. as per as per standar specification MORTH IV 406
Providing and laying Prime Coat over WMM surface using 7Kgs of Bitumen emulsion SS I for 10sqm including labour charges for preparing the surface and applying the required quantity of bitumen as teak coat etc., complete.
Providing and laying Tack coat over WMM surface treated with prime coat using 2.5kgs of Bitumen’s VG 30 for 10sqm including labour charges for preparing ;the surface and applying the required quantity ofl bitumen as teak coat etc., comple.
Providing and laying Tack Coat over existing B.T Surface using 2.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for prparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing and laying 50mm Consolidated thick Dense Bituminous Mecadam using 0.24 cum of 26.50 – 13.20 mm Graded metal and 0.25 cum of 13.20 – 2.36 mm Grade metal and 0.23 cum of 2.36 mm & below with 53.20 kgs of 60/70 Grade Bulk bitumen for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 505 of MORTH Rev-5
Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 46.28 kgs of 60/70 Grade Bulk bitumen and 4.02 kg of shredded Plastic waste for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
Tendernotice_2.pdf
PDF • 0.62 MB
BOQ_768661.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid