Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance UPPER KANGNA DHAR VERMA COTTAGE BELOW BCS SHIMLA 9 | Admitted-Finance |
| 2 | Admitted-Finance R O 127 3 LOWER BAZAR SHIMLA 1 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical H NO 26 HB COLONY SHIMLA DISTT SHIMLA 1 | SHIMLA | HIMACHAL PRADESH | 171001 | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹14.5 L
EMD Value
₹29,100
Closing Date
6 Nov 2023, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AGM WSD SJPNL
AGM WSD SJPNL US CLUB SHIMLA 171001
LWSS Koti Brandi Shimla Set No 3 SH Repair Rewinding of Rotor of 11 KV Induction motor BHEL make 425 KW 550HP having S No 48021A 402 11 08
2023_MC_80888_1
4258 dated 30/10/2023
Open Tender
Pumps/Motors
Item Rate
90 days
Shimla
Please refer Tender documents.
7 documents required · 7 mandatory
₹350
Yes
GM MC
₹29,100
Yes
14 Nov 2023
31 Oct 2023
6 Nov 2023
31 Oct 2023
6 Nov 2023
31 Oct 2023
31 Oct 2023 - 6 Nov 2023
Amount
Complete set of Rewinding of stator of squirrel cage BHEL make KV motor, 425 KW/550 HP 2968 RPM, 50HZ, 3 phase induction motor having Sr. No. 48021-A-402-11-08 at 1st stage including cost of winding, insulation material removing of old winding and rewinding with new winding material and allied jobs, material including all the leads and lifts.
P/F bearing at drive end No. NU-228 ECG-C3 SKF make complete in all respect as per direction of Engineer-in-Charge.
P/F bearing at Non drive end No. 6228 MA-C3 SKF make complete in all respect as per direction of Engineer-in-Charge.
P/F bearing at Non drive end No. NU-224 ECJ-C3 SKF make complete in all respect as per direction of Engineer-in-Charge.
P/F heat proof copper cable 120mm2 from terminal plate to winding including providing and fixing of thimmble and braing.
Installation of motor on bed and precision and longitudinal as well as exial alignment of motor with longituinal as well as axial alignment of motor with pump shaft with suitable precision measuring devices like dial gauge stainless steel shims including manual and mechanical loading and unloading including all leads and lifts complete in all respects as per direction of Engineer-in-Charge.
Reclamation of DE and NE side bearing, housing including all leads and lifts compolete in all respect as per the direction of Enginner-in-Charge.
Cleaning of rotor with hot air including vamishing and baking including and leads and lifts complete in all respect as per direction of Engineer-in-Charge.
Removal of old slipring after heating with gas and hydraulic and providing and fixing of new slipring as per original dimension complete in all respect and up to all leads and lift as per direction of Engineer-in-Charge.
Transporation charges from site to workshop and back including all leads and lifts complete in all respect as per direction of Engineer-in-Charge.
Thakur Traders
ashok kumar verma
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .