Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-AOC | ₹8.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹8.4 L+₹2,487.17 (0.30%)Rejected-AOC 4 13 B PERIYAR NAGAR THANGAMAPURIPATTINAM METTUR DAM 636 402 | METTUR DAM | SALEM | TAMIL NADU | 636402 | ₹8.4 L+₹2,487.17 (0.30%) | L2 | Rejected-AOC L2 |
| 3 | L3₹8.5 L+₹11,606.83 (1.39%)Rejected-AOC | ₹8.5 L+₹11,606.83 (1.39%) | L3 | Rejected-AOC L3 |
Tender Value
₹8.3 L
EMD Value
₹8,300
Closing Date
17 Feb 2026, 3:00 pmClosed
ZONAL OFFICER
ZONE-X
Improvement works to the footpath at Old bangaru Colony 1st street in Div-128, Unit-29, Zone-10
2026_CoC_658464_1
Z.O.X.C.No. E1/KKM/145/2026
Limited
Civil Works
Works
KODAMBAKKAM
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹8,300
14 May 2026
16 Feb 2026
17 Feb 2026
16 Feb 2026
17 Feb 2026
16 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling - Brick / Stone Masonry in cement mortar walls under 3m high | 14 | CUM | 302.96 | ₹4,241.44 |
| 2 | Dismantling - Floor finish & dadooing walls i...Tiles / Glazed Tiles / Clay Tiles / Cuddapah Slabs | 380 | SQM | 65.56 | ₹24,912.8 |
| 3 | Dismantling RCC by manual / by using deploying machineries | 4 | CUM | 4,610.31 | ₹18,441.24 |
| 4 | Supplying and erecting steel centering including n...l be given after the concrete is laid). FOUNDATION | 21 | SQM | 756.34 | ₹15,883.14 |
| 5 | Supplying, fabricating and placing in position Rib...nt and binding wire) Upto plinth / Basement level | 120 | KGS | 96.53 | ₹11,583.6 |
| 6 | Cement Concrete 1:5:10 (One cement, Five crushed ...partmental officers - Mixing by mechanical means | 7 | CUM | 5,756.01 | ₹40,292.07 |
| 7 | Supplying and filling in foundation, basement, etc...tion and as directed by the departmental officers. | 42 | CUM | 391.95 | ₹16,461.9 |
| 8 | Providing and laying in position, standardised con...the Department for the excess usage of materials). | 40 | CUM | 8,015.86 | ₹3,20,634.4 |
| 9 | Raising Or Lowering 45 cm.(or) 60 cm. Dia Cast Iro... Smooth The Top Surface With Cement Etc. Complete | 5 | NOS | 4,898.19 | ₹24,490.95 |
| 10 | Supplying and fixing of 24" FRC manhole cover with...ll be painted with anti corrosive bitumastic paint | 19 | EACH | 4,962.22 | ₹94,282.18 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
BOQ_789992.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .