Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹8,800
Closing Date
12 Jun 2026, 2:00 pm6d left
SUPERINTENDING ENGINEER EDC MIRZAPUR
Fataha Mirzapur
Supply of De centralized materials increasing capacity of T F under Business Plan 2026 27 in EDD Chunar Mirzapur
2026_PVVNV_1154758_1
16/EDC(M)/2026-27
Open Tender
Electrical Works
90 days
SUPERINTENDING ENGINEER EDC MIRZAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Executive Engineer(A)
₹8,800
27 May 2026
27 May 2026
13 Jun 2026
27 May 2026
12 Jun 2026
27 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Supply of following Decentralized materials at the works site as per RESSPO norms | ||||||
| 1.01 | Stone pad 300x300x75 mm | 52 | No | 14 | ₹728 | Item Code1 |
| 1.02 | Top, Dropper channel clamp with bolts & nuts for PCC Pole | 208 | No | 15 | ₹3,120 | Item Code2 |
| 1.03 | E-bracket with nuts & bolts | 156 | No | 16 | ₹2,496 | Item Code3 |
| 1.04 | X-arm holding clamp with nuts & bolts | 52 | No | 17 | ₹884 | Item Code4 |
| 1.05 | All lugs 120 mm2 | 24 | No | 18 | ₹432 | Item Code5 |
| 1.06 | All lugs 70 mm2 | 32 | No | 19 | ₹608 | Item Code6 |
| 1.07 | Stay clamp with nut & bolts for PCC Pole | 104 | Set | 20 | ₹2,080 | Item Code7 |
| 1.08 | Stay Insulator | 104 | No | 21 | ₹2,184 | Item Code8 |
| 2Cartage of following materials from ESC, Mirzapur to work site including loading & unloading charge | ||||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.45 MB
16TermsCondition.pdf
Tender Documents • 0.93 MB
BOQ_2163047.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid