Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 LAccepted-AOC A1 BIRATUNGA P O GOP PIN 752116 DIST PURI | GOP | PURI | ODISHA | 752116 | ₹7.6 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹7.6 L+₹2,112.05 (0.28%)Rejected-Finance | ₹7.6 L+₹2,112.05 (0.28%) | L2 | Rejected-Finance Rejected due to higher bid |
| 3 | L3₹8.4 L+₹79,352.65 (10.4%)Rejected-Finance MAHANADI SOUTH DIVISION NO I CUTTACK | ₹8.4 L+₹79,352.65 (10.4%) | L3 | Rejected-Finance Rejected due to higher bid |
| 4 | L4₹10.0 L+₹2.4 L (31.3%)Rejected-Finance CONSTRUCTION OF BOUNDARY WALL AND MAIN GATE OF GOVT AYURVEDIC DISPENSARY BUILDING AT BHUSKUNDA IN THE DISTRICT OF MAYURBHANJ | BALESHWAR | ODISHA | 756028 | ₹10.0 L+₹2.4 L (31.3%) | L4 | Rejected-Finance Rejected due to higher bid |
| 5 | L5₹10.1 L+₹2.4 L (31.9%)Rejected-Finance AT PO TIGIRIA PS ATHAGARH DIST CUTTACK | TIGIRIA | CUTTACK | ODISHA | ₹10.1 L+₹2.4 L (31.9%) | L5 | Rejected-Finance Rejected due to higher bid |
Tender Value
₹10.1 L
EMD Value
₹10,057
Closing Date
9 Mar 2026, 5:00 pmClosed
DFO ATHGARH
ATHGARH
EPT
2026_DFATH_126856_1
DFO-ATH-05 of 2025-26
National Competitive Bid
Civil Works - Others
Percentage
Baniabandha
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹10,057
Yes
24 Apr 2026
3 Mar 2026
10 Mar 2026
3 Mar 2026
9 Mar 2026
3 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness
Bush Cutting | 10,400 | Sqm | 8.37 | ₹87,048 |
| 2 | Excavation, loading and carriage by mechanical means in D.I. rock, laterite and soft rock not requiring blasting interspread with boulders upto 1/2 cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specification and as directed by the Engineer-in-charge within an initial lead of 1km from the place of excavation complete
Trench cutting | 8,750 | Cum | 83.87 | ₹7,33,862.5 |
| 3 | Fine dressing and turfing the slopes of the dam or dyke with compact Dub grass with initial lifts and lead and as per the direction of the Engineer-in charge
Bottom-2980 Sqm
Both End-12 Sqm
Both Face-8940 Sqm | 11,932 | Sqm | 15.49 | ₹1,84,826.68 |
stage.html
html • 0.10 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_583783.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.65 MB
DTCNEPT.pdf
Tender Documents • 1.04 MB
BOQ_583783.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .