AK Jha
NHIDCL HQ New Delhi
Consultancy Services for Preparation of DPR for Slope Protection and Slope Stabilization works including Rock-fall Protection and Landslide Mitigation measures from km 123.840 to km 166.700 of NH-29 on 4-laning of Dimapur-Kohima road in Nagaland
2024_NHIDC_803294_1
NHIDCL/NagalandDiv/D-K /DPR/2024
Open Tender
Civil Works
Item Rate
120 days
Nagaland
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,900
MD NHIDCL
Exempted
NHIDCL HQ New Delhi
12 Aug 2024
8 Apr 2024
24 May 2024
8 Apr 2024
23 May 2024
22 Apr 2024
8 Apr 2024 - 18 Apr 2024
22 Apr 2024
Amount
Professional Staff
Team Leader cum Senior Highway Engineer (1 no.)
Geological Expert (1 no.)
Geotechnical cum Slope Stabilization Expert (1 no.)
Hydrologist and Hydrological Modeling Expert (1 no.)
Road Safety Expert (1 no.)
Environmental Specialist (1 no.)
GIS and Remote Sensing Expert (1 no.)
Sub-Professional Staff (To be assessed by Consultant as per requirement of assignment and one sub-professional be a fresh graduate)
Assistant Highway cum Pavement Engineer
Assistant Material cum Geotechnical Engineer Geologist
Survey Engineer
Assistant Quantity Surveyor/Documentation Expert
Support Staff
Office Manager
Office Boy
Transportation (Fixed costs)
The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. (2 vehicles)
Duty Travel to Site (Fixed Costs)
Office Rent (Fixed Costs)
Office Supplies, Utilities and Communication (Fixed Costs)
Office Furniture and Equipment (Rental)
Reports and Document (Fixed costs)
Monthly Report (3 sets)
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with L.A. Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Environmental Assessment report & RAP
Final Environmental Assessment report & RAP
Draft Detailed Design Report & Drawings etc.
Draft EMP
Draft Bidding Documents
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.
Final EMP
Final Bidding Documents
Draft 3(a) ,3(A) and 3(D) notification for land acquisition( 3 copies each)
LA & Clearances II Report
Survey and Investigation
Topographical Survey (Fixed Rate) Topographic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer Detailed topographic surveys using mobile/aerial LiDAR or better technology
Investigation (Fixed cost) Road and Bridge Inventory, FWD Test and Pavement Evaluation Roughness Survey Axle Load Survey Material Survey and Investigation Sub-grade Investigation Traffic Survey Socio-economic & Census Survey/Studies Land Acquisition Studies Any other investigations/surveys, Sub-Soil Investigation (Boring)
Network Survey and GPR Net work Survey of the existing Highways as a repository for civil work as per directions from Authority. GPR Survey for detection of under ground utilities
Cost of supply and fixing Boundary Pillars Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum )
Cost of supply and fixing Boundary Pillars Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum )
Land Acquisition Team including support staff and logistics/ transportation
Ex-Land Revenue Inspector/Officer or equivalent
Ex-Kanoogo/ Girdwar or equivalent
Ex-Patwari or equivalent
Typist
Computer including necessary peripherals
Printers
Vehicles (Bolero or equivalent) with monthly running limit of 4000 km
Genstru Consultants Pvt. Ltd.
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .