| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.8 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹46.9 L+₹9.3 L (24.6%)Rejected-AOC NO 01 ARCOT ROAD REMI COMPOUND AZHWARTHIRUNAGAR CHENNAI 600087 | CHENNAI | CHENNAI | TAMIL NADU | 600087 | L2 | Rejected-AOC Rejected | |
| 3 | Rejected-Technical SALEM | SALEM | - | Rejected-Technical Rejected |
Tender Value
Refer Docs
EMD Value
₹49,500
Closing Date
27 Aug 2024, 2:00 pmClosed
The Superintending Engineer, GCC,Madurai
The Superintending Engineer, General construction circle,TANTRANSCO, K.Pudur,Madurai-625 007
Labour charges for dismantling, transporting of 10MVA/16 MVA/25MVA(SH) 110 KV power Transformer from various SS, Unloading, erection, commissioning at various SS in Madurai region and Dindigul EDC for the period of one year contract
2024_EB_471223_1
SE/GCC/MDU/ELEC SPEC NO-06/2024-25
Open Tender
Electrical Works
Works
365 days
Madurai
As per BQR
2 documents required · 2 mandatory
₹0
₹49,500
Yes
10 Oct 2024
8 Aug 2024
28 Aug 2024
8 Aug 2024
27 Aug 2024
9 Aug 2024
Amount
Labour charges for Dismantling with out using board crane the complete accessories of Power transformer such as header pipes,Cooler Bank radiators,H.V. & L.V. bushings, conservator tanks, bucholz relays, equalizing pipes,Cooler fans, Pumps etc. and Draining the oil to the required level as directed by Field Engineer.10 MVA Power Transformer (and/(or) Labour charges for erection of Power Transformer with out using Board crane wherever applicable including gasket changing for H.V. & L.V. Bushings ,Radiator valve, Conservator Valve, equalizer Pipe Valve, Bucholz Valve, etc. as directed by Field Engineer (Gasket to be supplied by board) 10 MVA Power Transformer.
Labour charges for Dismantling with out using board crane the complete accessories of Power transformer such as header pipes,Cooler Bank radiators,H.V. & L.V. bushings, conservator tanks, bucholz relays, equalizing pipes,Cooler fans, Pumps etc. and Draining the oil to the required level as directed by Field Engineer.16 MVA Power Transformer (and/(or) Labour charges for erection of Power Transformer with out using Board crane wherever applicable including gasket changing for H.V. & L.V. Bushings ,Radiator valve, Conservator Valve, equalizer Pipe Valve, Bucholz Valve, etc. as directed by Field Engineer (Gasket to be supplied by board) 16 MVA Power transformer
Labour charges for Dismantling with out using board crane the complete accessories of Power transformer such as header pipes,Cooler Bank radiators,H.V. & L.V. bushings, conservator tanks, bucholz relays, equalizing pipes,Cooler fans, Pumps etc. and Draining the oil to the required level as directed by Field Engineer.25 MVA Power Transformer(and/(or) Labour charges for erection of Power Transformer with out using Board crane wherever applicable including gasket changing for H.V. & L.V. Bushings ,Radiator valve, Conservator Valve, equalizer Pipe Valve, Bucholz Valve, etc. as directed by Field Engineer (Gasket to be supplied by board) 25 MVA Power Transformer
Labour charges for Pulling of Power transformer(Allotted and Failed at existing SS and new SS) from plinth to safer side or vice versa as directed by the Field Engineer.
Labour charges for loading Power transformer with complete accessories including released oil, initial lead of 5 Metres as directed by the Field Engineer.
Transporting of Power Transformer, main tank with core level oil/ N2 gas , wherever necessary including all accessories and released oil by Low bed trailer and lorry as directed by Field Engineer.From 31 Ton to 50 Ton, Upto 100 Kms
Transporting of Power Transformer, main tank with core level oil/ N2 gas , wherever necessary including all accessories and released oil by Low bed trailer and lorry as directed by Field Engineer.From 51 Ton to 100 Ton, Upto 100 Kms
Transporting of Power Transformer, main tank with core level oil/ N2 gas , wherever necessary including all accessories and released oil by Low bed trailer and lorry as directed by Field Engineer. Above 100KM
Labour Charges for loading /unloading of power transformer oil barrel with new/ released oil from store to site or vice versa as directed by the Field Engineer.
Labour charges for draining of oil from main tank (To Barrel) as directed by the Field Engineer.
Labour charges for Intial filling of oil under vacuum from spare tank / barrel to main tank as directed by the Field Engineer.
Labour for dismantling of Top Cover with gaskets including OLTC cover and Replacement of Top cover gaskets, OLTC gaskets, Radiator, Butterfly valve inner Gaskets and all other gaskets, which are not normally covered under dismantling and re-erection, gaskets changing and refitting of top cover and OLTC cover plate & all other dismantled accessories and complete tightening works as directed by the Field Engineer. All the required Gaskets of RC 70C grade and governed by IS 4253 to be supplied by Contractor.10 MVA Power Transformer
Labour for dismantling of Top Cover with gaskets including OLTC cover and Replacement of Top cover gaskets, OLTC gaskets, Radiator, Butterfly valve inner Gaskets and all other gaskets, which are not normally covered under dismantling and re-erection, gaskets changing and refitting of top cover and OLTC cover plate & all other dismantled accessories and complete tightening works as directed by the Field Engineer. All the required Gaskets of RC 70C grade and governed by IS 4253 to be supplied by Contractor.16 MVA Power Transformer
Labour for dismantling of Top Cover with gaskets including OLTC cover and Replacement of Top cover gaskets, OLTC gaskets, Radiator, Butterfly valve inner Gaskets and all other gaskets, which are not normally covered under dismantling and re-erection, gaskets changing and refitting of top cover and OLTC cover plate & all other dismantled accessories and complete tightening works as directed by the Field Engineer. All the required Gaskets of RC 70C grade and governed by IS 4253 to be supplied by Contractor.25 MVA Power Transformer
Labour charges for Dismantling with out using board crane the complete accessories of Power transformer such as header pipes,Cooler Bank radiators, and Draining the oil to the required level as directed by Field Engineer.(30% Full Dismantling charges)10 MVA Power Transformer
Labour charges for Dismantling with out using board crane the complete accessories of Power transformer such as header pipes,Cooler Bank radiators, and Draining the oil to the required level as directed by Field Engineer.(30% Full Dismantling charges)16 MVA Power Transformer
Labour charges for Dismantling with out using board crane the complete accessories of Power transformer such as H.V. & L.V. bushings, etc. and Draining the oil to the required level as directed by Field Engineer.(30% Full Dismantling charges) 10 MVA Power Transformer
Labour charges for Dismantling with out using board crane the complete accessories of Power transformer such as H.V. & L.V. bushings, etc. and Draining the oil to the required level as directed by Field Engineer.(30% Full Dismantling charges) 16 MVA Power Transformer
Labour charges for Dismantling with out using board crane the complete accessories of Power transformer such as conservator tanks, bucholz relays, equalizing pipes,. and Draining the oil to the required level as directed by Field Engineer.(30% Full Dismantling charges) 10 MVA Power Transformer
Labour charges for Dismantling with out using board crane the complete accessories of Power transformer such as conservator tanks, bucholz relays, equalizing pipes,. and Draining the oil to the required level as directed by Field Engineer.(30% Full Dismantling charges) 16 MVA Power Transformer
Labour for dismantling of Top Cover with gaskets including OLTC cover and Replacement of Top cover gaskets, as directed by the Field Engineer. All the required Gaskets of RC 70C grade and governed by IS 4253 to be supplied by Contractor. (30% of full dismantling cost) 10 MVA Power Transformer
Labour for dismantling of Top Cover with gaskets including OLTC cover and Replacement of Top cover gaskets, as directed by the Field Engineer. All the required Gaskets of RC 70C grade and governed by IS 4253 to be supplied by Contractor. (30% of full dismantling cost) 16 MVA Power Transformer
Labour for dismantling of Top Cover with gaskets including OLTC cover and Replacement of Top cover gaskets, as directed by the Field Engineer. All the required Gaskets of RC 70C grade and governed by IS 4253 to be supplied by Contractor. (30% of full dismantling cost) 25 MVA Power Transformer
Labour charges for Hot oil Circulation of oil of Transformer and OLTC under vacuum drying when ever applicable/ necessary to the required level and circulation of oil till satisfactory results are obtained before commissioning as directed by Field Engineer. The fillter will be provided by contractor.Oil circulation required only in Main tank -Upto 5,000 Litres
Labour charges for Hot oil Circulation of oil of Transformer and OLTC under vacuum drying when ever applicable/ necessary to the required level and circulation of oil till satisfactory results are obtained before commissioning as directed by Field Engineer. The fillter will be provided by contractor.Oil circulation required only in Main tank -Above 5,000 Litres
Labour for the erection of required control cable in duct from power transformer to control room and in the transformer body as directed by the Field Engineer.(Labour for erection of cable in duct/trench/clamping on structures - neat laying in the ducts with identification Tags,Plastic token in all duct corners for easy identification of cables. including fabrication of clamps and fixing at uniform intervals as directed by the field engineer)Upto 8 core cable.
Labour for the erection of required control cable in duct from power transformer to control room and in the transformer body as directed by the Field Engineer.(Labour for erection of cable in duct/trench/clamping on structures - neat laying in the ducts with identification Tags,Plastic token in all duct corners for easy identification of cables. including fabrication of clamps and fixing at uniform intervals as directed by the field engineer)Above 8 core cable
Supply and glanding of all the control cable in transformer to RTCC, DM.Box,MBox,etc including removing of insulation of the control cable and providing suitable holes in the gland plateas directed by the field engineer.32 mm
Supply and glanding of all the control cable in transformer to RTCC, DM.Box,MBox,etc including removing of insulation of the control cable and providing suitable holes in the gland plateas directed by the field engineer.28 mm
Supply and glanding of all the control cable in transformer to RTCC, DM.Box,MBox,etc including removing of insulation of the control cable and providing suitable holes in the gland plateas directed by the field engineer.25 mm
Supply and glanding of all the control cable in transformer to RTCC, DM.Box,MBox,etc including removing of insulation of the control cable and providing suitable holes in the gland plateas directed by the field engineer.19 mm
Termination of cable core end dressed neatly including the cost of cable socket (lug) ferrules, sleeves, tags, ties, stropes, etc., as directed by the field engineer.(No.of core ends in unit of 1000)
Supply of various steel materials and Labour machinery consumables for the double earthing of neutral , main tank and other panel etc.as directed by the field engineer.
Labour machinery consumables for the double earthing of neutral , main tank and other panel etc.as directed by the field engineer.
Labour Charges for Overhauling of Power Transformer OLTC mechanism including cleaning and replacing of defective spares and gaskets etc. as directed by the Field Engineer.(Gasket & Spares will be supplied by TANTRANSCO) (10MVA and above)
Labour charges for one finish coating of aluminium painting works with spray gun for transformer complete including T&P etc. and painting of valves, bushings with red, yellow, blue and black paint including cost of paint of reputed make company viz Asian, Berger etc., and Consumables as directed by the field engineer. 10 MVA to 25 MVA Power Transformer
SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
SHRI MEENATCHI ENGINEERING (BID ID -1118452)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .