| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Finance 93 W 1 DR GIRINDRA SEKHAR BOSE ROAD KOLKATA 700039 | KOLKATA | WEST BENGAL | 700039 | +0.00% | ₹3.0 L | L1 | Admitted-Finance |
| 2 | L2₹3.1 L+₹8,623.64 (2.88%)Admitted-Finance | +2.88% | ₹3.1 L+₹8,623.64 (2.88%) | L2 | Admitted-Finance |
| 3 | L3₹3.1 L+₹12,725.86 (4.25%)Admitted-Finance 3 1 120 ANANDA PALIT ROAD ADJACENT AREA IN WARD NO 55 | KOLKATA | WEST BENGAL | 700001 | +4.25% | ₹3.1 L+₹12,725.86 (4.25%) | L3 | Admitted-Finance |
Tender Value
₹3.0 L
EMD Value
₹6,000
Closing Date
21 Sept 2026, 12:00 pmClosed
EX-ENG-IX
11,BELVEDERE ROAD KOL-27
MAINTENANCE OF DAIGHAT, JUTE MILL GANGA GHAT AND NATURE PARK GHAT BY COLOUR WASH, SPREADING SILVER SAND AND MINOR REPAIRING WORKS IN WARD NO 80
2026_KMC_1041682_1
KMC/IX/080/007/2026-2027
Open Tender
CIVIL WORKS
Percentage
30 days
BR-IX
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹6,000
24 Sept 2026
11 Sept 2026
23 Sept 2026
11 Sept 2026
21 Sept 2026
11 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS (K) PAINTING, VERNISHING ETC?(B)MISCELLANEOUS ITEMS.(1)Removing loose scales, blisters etc. from old painted surface and thoroughly smoothening the surface to make the same suitable for receiving fresh coat of paint.N.B:(Payment against item (1, 2, 3, 4) of subhead B will be made only when done at specific direction of the Engineer- in-charge. Cost of taking out shutter etc.for this item and rehanging the same or changing glass panes cracked or broken in the operation will be deemed to be covered by the rate of this item and no seperate payment therefore shall be made.) | 2,015 | SQM | 21 | ₹42,315 |
| 2 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 4. Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) (B) Do - by fine sand(5th Corrigenda & addenda dated 16.04.2019) | 1.04 | %M3 | 1,31,714 | ₹1,36,982.56 |
| 3 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] i) With 1:6 cement mortar (b) 20 mm thick plaster | 54.19 | SQM | 167 | ₹9,049.73 |
| 4 | SECTION 1. ------------BUILDING WORKS (J)WHITE WASH, COLOUR WASH, DISTEMPER A. ORIGINAL WORKS 1.White washing including cleaning and smoothening surface thoroughly.All floors :(a) One coat | 20.62 | %SQ | 1,309 | ₹26,990.27 |
| 5 | SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 2 (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : (a) On timber or plastered surface : With super gloss (hi-gloss) - (i) One coat (white in shade) | 48.17 | SQM | 52 | ₹2,504.84 |
| 6 | SECTION 1. ------------BUILDING WORKS (J)WHITE WASH, COLOUR WASH, DISTEMPER A. ORIGINAL WORKS 4.Colour washing with any shade with Stainers, as required including cleaning and smoothening surface thoroughly : (ii) External surface (Ground floor) (a) One coat (i) Other than yellow, pink. N.B. : Extra for each additional floor in external walls refer item 1 of subhead C | 20.33 | %SQ | 1,515 | ₹30,799.95 |
| 7 | SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 2 (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : (a) On timber or plastered surface :With super gloss (hi-gloss) -(iii) One coat (with any shade except white) | 48.17 | SQM | 54 | ₹2,601.18 |
| 8 | Sub Total | - | - | - | - |
| 9 | GST 18% | 1 | Nos. | - | - |
| 10 | CESS 1% | 1 | Nos. | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.45 MB
ROAD.pdf
Additional Documents • 2.42 MB
TF_80_07.pdf
Tender Documents • 0.75 MB
BOQ_2557466.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .