Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 1 ENGINEERS INDIA BHAVAN EIB BHIKAJI CAMA PLACE RK PURAM NEW DELHI SOUTH WEST DELHI DELHI 110066 | NEW DELHI | DELHI | 110066 | Admitted-Finance |
| 3 | Admitted-Finance D 36 SECTOR 6 NOIDA GAUTAM BUDDHA NAGAR UTTAR PRADESH 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | Admitted-Finance |
| 4 | Rejected-Technical A 21 BEHIND LIONS CLUB SCHOOL III PHASE THIRU VI KA INDUSTRIAL ESTATE GUINDY CHENNAI 600 032 | CHENNAI | TAMIL NADU | 600001 | Rejected-Technical Technically not acceptable. |
| 5 | Rejected-Technical | Rejected-Technical Techno commercially not acceptable. |
Tender Value
Refer Docs
EMD Value
₹38,000
Closing Date
31 Jan 2022, 2:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DGM (Contracts)
Indian Oil Corporation Limited (Pipelines Division) A-1, Udyog Marg, Sector-1, NOIDA (UP) 201 301, INDIA
EIA and RA study for Mundra Panipat Crude Oil Pipeline project
2022_PLHO_146225_1
PLCC/EIA-RA/MPPL P-25/MON/22004
Limited
Services
Works
480 days
IN STATE OF INDIA
As per tender documents
6 documents required · 6 mandatory
₹38,000
Yes
15 Feb 2022
17 Jan 2022
1 Feb 2022
17 Jan 2022
31 Jan 2022
24 Jan 2022
120 days
Amount
EIA RA study of MPPL P25 Gujarat ML
Gujarat (Mainline length - 351.600 Km) : Carrying out Environment Impact Assessment (EIA) & Risk Analysis (RA) study in the state of Gujarat for 351.600 km to assess probable impact on environment/risk due to the project & suggest required mitigation measures, If any, for obtaining the required clearances from State Pollution Control Board/ MoEF&CC, GoI for the project of "Mundra Panipat Crude Oil Pipeline" in adherence to the EIA Notification, 2006 & subsequent amendments (Draft EIA notification 2020) made by MoEF&CC, Govt. of India. Carrying out Environment Impact Assessment (EIA) study to establish present environmental parameters in & around the pipeline station facilities in 15 km radius and 1 km along pipeline route (500 meters on either side of the pipeline from centre-line) under the subject project of "Mundra Panipat Crude Oil Pipeline"". Identifying & evaluating potential environmental impacts that are consequent to the project facilities, carrying out consequence analysis of release of hydro-carbon to water-bodies etc. and recommend necessary mitigation measures, prepare EIA report covering all the relevant data on air, water, noise, land-use, temperature, available facilities, surrounding industries, place of historical importance, marine life, flora & fauna, water bodies, coastal areas, occupation, health, etc. of neighboring people etc. in accordance with the regulations of the concerned State PCB's, Notification of MoEF&CC, GoI as mentioned above and prepare an Environment Management Plan(EMP). Identification of Eco-sensitive area falling under the project, if any, shall also be included under this study. Carrying out Risk Analysis (RA) study for the proposed facilities envisaged under the project of "Mundra Panipat Crude Oil Pipeline"" taking into account the proposed facilities and existing facilities in its surroundings, study done should identify the potential hazards, assess the impact of all probable accidental hazards and mitigation measures to reduce hazards of all the facilities, prepare RA report with mitigation measures & Disaster Management Plan(DMP). Risk analysis study shall comprise of, but not limited to: -Identification of risks by HAZOP/FETI approaches -Hazard analysis/damage model studies for the facilities, radiation effects etc. -Maximum Credible Accident Analysis bringing out type of fire hazards from the facilities, past accident analysis, risk factors, societal risk, Domino effects etc. -Observation of risk assessment study / recommendations. -Preparation & submission of ON SITE EMERGENCY PLAN / DISASTER MANAGEMENT PLAN (DMP) for the subject pipeline, based on Risk Analysis and assessment. Note: The above also includes all expenses related to rendering assistance towards providing technical explanation / clarification that may require to be made to any statutory authority, whenever asked for and for attending offices of State PCB's/MoEF&CC, GoI/Other statutory authority along with IOCL officials to give presentations on the study, whenever asked, to facilitate clearances from State Pollution Control Board/MoEF&CC,GoI.
EIA RA study of MPPL P25 Rajasthan ML
Rajasthan (Mainline length - 586.51 km) : Carrying out Environment Impact Assessment (EIA) & Risk Analysis (RA) study in the state of Rajasthan for 586.51 km to assess probable impact on environment/risk due to the project & suggest required mitigation measures, If any, for obtaining the required clearances from State Pollution Control Board/ MoEF&CC, GoI for the project of "Mundra Panipat Crude Oil Pipeline" in adherence to the EIA Notification, 2006 & subsequent amendments (Draft EIA notification 2020) made by MoEF&CC, Govt. of India. Carrying out Environment Impact Assessment (EIA) study to establish present environmental parameters in & around the pipeline station facilities in 15 km radius and 1 km along pipeline route (500 meters on either side of the pipeline from centre-line) under the subject project of "Mundra Panipat Crude Oil Pipeline"". Identifying & evaluating potential environmental impacts that are consequent to the project facilities, carrying out consequence analysis of release of hydro-carbon to water-bodies etc. and recommend necessary mitigation measures, prepare EIA report covering all the relevant data on air, water, noise, land-use, temperature, available facilities, surrounding industries, place of historical importance, marine life, flora & fauna, water bodies, coastal areas, occupation, health, etc. of neighboring people etc. in accordance with the regulations of the concerned State PCB's, Notification of MoEF&CC, GoI as mentioned above and prepare an Environment Management Plan(EMP). Identification of Eco-sensitive area falling under the project, if any, shall also be included under this study. Carrying out Risk Analysis (RA) study for the proposed facilities envisaged under the project of "Mundra Panipat Crude Oil Pipeline"" taking into account the proposed facilities and existing facilities in its surroundings, study done should identify the potential hazards, assess the impact of all probable accidental hazards and mitigation measures to reduce hazards of all the facilities, prepare RA report with mitigation measures & Disaster Management Plan(DMP). Risk analysis study shall comprise of, but not limited to: -Identification of risks by HAZOP/FETI approaches -Hazard analysis/damage model studies for the facilities, radiation effects etc. -Maximum Credible Accident Analysis bringing out type of fire hazards from the facilities, past accident analysis, risk factors, societal risk, Domino effects etc. -Observation of risk assessment study / recommendations. -Preparation & submission of ON SITE EMERGENCY PLAN / DISASTER MANAGEMENT PLAN (DMP) for the subject pipeline, based on Risk Analysis and assessment. Note: The above also includes all expenses related to rendering assistance towards providing technical explanation / clarification that may require to be made to any statutory authority, whenever asked for and for attending offices of State PCB's/MoEF&CC, GoI/Other statutory authority along with IOCL officials to give presentations on the study, whenever asked, to facilitate clearances from State Pollution Control Board/MoEF&CC,GoI.
EIA RA study of MPPL P25 Haryana ML
Haryana (Mainline length - 168.89 km): Carrying out Environment Impact Assessment (EIA) & Risk Analysis (RA) study in the state of Haryana for 168.89 km to assess probable impact on environment/risk due to the project & suggest required mitigation measures, If any, for obtaining the required clearances from State Pollution Control Board/ MoEF&CC, GoI for the project of "Mundra Panipat Crude Oil Pipeline" in adherence to the EIA Notification, 2006 & subsequent amendments (Draft EIA notification 2020) made by MoEF&CC, Govt. of India. Carrying out Environment Impact Assessment (EIA) study to establish present environmental parameters in & around the pipeline station facilities in 15 km radius and 1 km along pipeline route (500 meters on either side of the pipeline from centre-line) under the subject project of "Mundra Panipat Crude Oil Pipeline"". Identifying & evaluating potential environmental impacts that are consequent to the project facilities, carrying out consequence analysis of release of hydro-carbon to water-bodies etc. and recommend necessary mitigation measures, prepare EIA report covering all the relevant data on air, water, noise, land-use, temperature, available facilities, surrounding industries, place of historical importance, marine life, flora & fauna, water bodies, coastal areas, occupation, health, etc. of neighboring people etc. in accordance with the regulations of the concerned State PCB's, Notification of MoEF&CC, GoI as mentioned above and prepare an Environment Management Plan(EMP). Identification of Eco-sensitive area falling under the project, if any, shall also be included under this study. Carrying out Risk Analysis (RA) study for the proposed facilities envisaged under the project of "Mundra Panipat Crude Oil Pipeline"" taking into account the proposed facilities and existing facilities in its surroundings, study done should identify the potential hazards, assess the impact of all probable accidental hazards and mitigation measures to reduce hazards of all the facilities, prepare RA report with mitigation measures & Disaster Management Plan(DMP). Risk analysis study shall comprise of, but not limited to: -Identification of risks by HAZOP/FETI approaches -Hazard analysis/damage model studies for the facilities, radiation effects etc. -Maximum Credible Accident Analysis bringing out type of fire hazards from the facilities, past accident analysis, risk factors, societal risk, Domino effects etc. -Observation of risk assessment study / recommendations. -Preparation & submission of ON SITE EMERGENCY PLAN / DISASTER MANAGEMENT PLAN (DMP) for the subject pipeline, based on Risk Analysis and assessment. Note: The above also includes all expenses related to rendering assistance towards providing technical explanation / clarification that may require to be made to any statutory authority, whenever asked for and for attending offices of State PCB's/MoEF&CC, GoI/Other statutory authority along with IOCL officials to give presentations on the study, whenever asked, to facilitate clearances from State Pollution Control Board/MoEF&CC,GoI.
EIA RA study of MPPL P25 Gujarat STN
Gujarat Stations (Mundra pumping station,Churwa scrapper station & IPS-1 pumping station): Carrying out Environment Impact Assessment (EIA) & Risk Analysis (RA) study for station at Mundra , Churwa & IPS-1(near Radhanpur) in the state of Gujarat to assess probable impact on environment/risk due to the project & suggest required mitigation measures, If any, for obtaining the required clearances from State Pollution Control Board/ MoEF&CC, GoI for the project of "Mundra Panipat Crude Oil Pipeline" in adherence to the EIA Notification, 2006 & subsequent amendments (Draft EIA notification 2020) made by MoEF&CC, Govt. of India. Carrying out Environment Impact Assessment (EIA) study to establish present environmental parameters in & around the pipeline station facilities in 15 km radius and 1 km along pipeline route (500 meters on either side of the pipeline from centre-line) under the subject project of "Mundra Panipat Crude Oil Pipeline"". Identifying & evaluating potential environmental impacts that are consequent to the project facilities, carrying out consequence analysis of release of hydro-carbon to water-bodies etc. and recommend necessary mitigation measures, prepare EIA report covering all the relevant data on air, water, noise, land-use, temperature, available facilities, surrounding industries, place of historical importance, marine life, flora & fauna, water bodies, coastal areas, occupation, health, etc. of neighboring people etc. in accordance with the regulations of the concerned State PCB's, Notification of MoEF&CC, GoI as mentioned above and prepare an Environment Management Plan(EMP). Identification of Eco-sensitive area falling under the project, if any, shall also be included under this study. Carrying out Risk Analysis (RA) study for the proposed facilities envisaged under the project of "Mundra Panipat Crude Oil Pipeline"" taking into account the proposed facilities and existing facilities in its surroundings, study done should identify the potential hazards, assess the impact of all probable accidental hazards and mitigation measures to reduce hazards of all the facilities, prepare RA report with mitigation measures & Disaster Management Plan(DMP). Risk analysis study shall comprise of, but not limited to: -Identification of risks by HAZOP/FETI approaches -Hazard analysis/damage model studies for the facilities, radiation effects etc. -Maximum Credible Accident Analysis bringing out type of fire hazards from the facilities, past accident analysis, risk factors, societal risk, Domino effects etc. -Observation of risk assessment study / recommendations. -Preparation & submission of ON SITE EMERGENCY PLAN / DISASTER MANAGEMENT PLAN (DMP) for the subject pipeline, based on Risk Analysis and assessment. Note: The above also includes all expenses related to rendering assistance towards providing technical explanation / clarification that may require to be made to any statutory authority, whenever asked for and for attending offices of State PCB's/MoEF&CC, GoI/Other statutory authority along with IOCL officials to give presentations on the study, whenever asked, to facilitate clearances from State Pollution Control Board/MoEF&CC,GoI.
EIA RA study of MPPL P25 Rajasthan STN
Rajasthan Stations( IPS-2 pumping station ,IPS-3 pumping station ,Scrapper station-2 & scapper station-3): Carrying out Environment Impact Assessment (EIA) & Risk Analysis (RA) study for stations at IPS-2 (near Jodhpur),IPS-3(near Sikar) ,Scrapper station-2 ,Scrapper station-3 in the state of Rajasthan to assess probable impact on environment/risk due to the project & suggest required mitigation measures, If any, for obtaining the required clearances from State Pollution Control Board/ MoEF&CC, GoI for the project of "Mundra Panipat Crude Oil Pipeline" in adherence to the EIA Notification, 2006 & subsequent amendments (Draft EIA notification 2020) made by MoEF &CC, Govt. of India. Carrying out Environment Impact Assessment (EIA) study to establish present environmental parameters in & around the pipeline station facilities in 15 km radius and 1 km along pipeline route (500 meters on either side of the pipeline from centre-line) under the subject project of "Mundra Panipat Crude Oil Pipeline"". Identifying & evaluating potential environmental impacts that are consequent to the project facilities, carrying out consequence analysis of release of hydro-carbon to water-bodies etc. and recommend necessary mitigation measures, prepare EIA report covering all the relevant data on air, water, noise, land-use, temperature, available facilities, surrounding industries, place of historical importance, marine life, flora & fauna, water bodies, coastal areas, occupation, health, etc. of neighboring people etc. in accordance with the regulations of the concerned State PCB's, Notification of MoEF&CC, GoI as mentioned above and prepare an Environment Management Plan(EMP). Identification of Eco-sensitive area falling under the project, if any, shall also be included under this study. Carrying out Risk Analysis (RA) study for the proposed facilities envisaged under the project of "Mundra Panipat Crude Oil Pipeline"" taking into account the proposed facilities and existing facilities in its surroundings, study done should identify the potential hazards, assess the impact of all probable accidental hazards and mitigation measures to reduce hazards of all the facilities, prepare RA report with mitigation measures & Disaster Management Plan(DMP). Risk analysis study shall comprise of, but not limited to: -Identification of risks by HAZOP/FETI approaches -Hazard analysis/damage model studies for the facilities, radiation effects etc. -Maximum Credible Accident Analysis bringing out type of fire hazards from the facilities, past accident analysis, risk factors, societal risk, Domino effects etc. -Observation of risk assessment study / recommendations. -Preparation & submission of ON SITE EMERGENCY PLAN / DISASTER MANAGEMENT PLAN (DMP) for the subject pipeline, based on Risk Analysis and assessment. Note: The above also includes all expenses related to rendering assistance towards providing technical explanation / clarification that may require to be made to any statutory authority, whenever asked for and for attending offices of State PCB's/MoEF&CC, GoI/Other statutory authority along with IOCL officials to give presentations on the study, whenever asked, to facilitate clearances from State Pollution Control Board/MoEF&CC,GoI.
EIA RA study of MPPL P25 Haryana STN
Haryana Stations(Scrapper station-4 and Panipat delivery station ): Carrying out Environment Impact Assessment (EIA) & Risk Analysis (RA) study for stations at Scrapper station -4 and Panipat delivery station in the state of Haryana to assess probable impact on environment/risk due to the project & suggest required mitigation measures, If any, for obtaining the required clearances from State Pollution Control Board/ MoEF&CC, GoI for the project of "Mundra Panipat Crude Oil Pipeline" in adherence to the EIA Notification, 2006 & subsequent amendments (Draft EIA notification 2020) made by MoEF &CC, Govt. of India. Carrying out Environment Impact Assessment (EIA) study to establish present environmental parameters in & around the pipeline station facilities in 15 km radius and 1 km along pipeline route (500 meters on either side of the pipeline from centre-line) under the subject project of "Mundra Panipat Crude Oil Pipeline"". Identifying & evaluating potential environmental impacts that are consequent to the project facilities, carrying out consequence analysis of release of hydro-carbon to water-bodies etc. and recommend necessary mitigation measures, prepare EIA report covering all the relevant data on air, water, noise, land-use, temperature, available facilities, surrounding industries, place of historical importance, marine life, flora & fauna, water bodies, coastal areas, occupation, health, etc. of neighboring people etc. in accordance with the regulations of the concerned State PCB's, Notification of MoEF&CC, GoI as mentioned above and prepare an Environment Management Plan(EMP). Identification of Eco-sensitive area falling under the project, if any, shall also be included under this study. Carrying out Risk Analysis (RA) study for the proposed facilities envisaged under the project of "Mundra Panipat Crude Oil Pipeline"" taking into account the proposed facilities and existing facilities in its surroundings, study done should identify the potential hazards, assess the impact of all probable accidental hazards and mitigation measures to reduce hazards of all the facilities, prepare RA report with mitigation measures & Disaster Management Plan(DMP). Risk analysis study shall comprise of, but not limited to: -Identification of risks by HAZOP/FETI approaches -Hazard analysis/damage model studies for the facilities, radiation effects etc. -Maximum Credible Accident Analysis bringing out type of fire hazards from the facilities, past accident analysis, risk factors, societal risk, Domino effects etc. -Observation of risk assessment study / recommendations. -Preparation & submission of ON SITE EMERGENCY PLAN / DISASTER MANAGEMENT PLAN (DMP) for the subject pipeline, based on Risk Analysis and assessment. Note: The above also includes all expenses related to rendering assistance towards providing technical explanation / clarification that may require to be made to any statutory authority, whenever asked for and for attending offices of State PCB's/MoEF&CC, GoI/Other statutory authority along with IOCL officials to give presentations on the study, whenever asked, to facilitate clearances from State Pollution Control Board/MoEF&CC,GoI.
Engineers India Limited
Mantec Consultants Pvt. Ltd.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .