Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5.3 L
EMD Value
₹6,600
Closing Date
22 Mar 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Area Engineer(EnM)
Sodepur Area Office
Changing of SSW(7th and SNE (5th) 38mm x 680M, 6x1 Core (RHL) Guide Rope of PIT No.01, Chinakuri Mine-I
2024_ECL_304331_1
ECL/SDPA/EnM/24/Tender/644 Date.07.03.2024
Open Tender
Miscellaneous Works
Item Rate
10 days
Sodepur Area
Please refer Tender documents.
4 documents required · 4 mandatory
₹6,600
23 Mar 2024
8 Mar 2024
23 Mar 2024
8 Mar 2024
22 Mar 2024
8 Mar 2024
8 Mar 2024 - 11 Mar 2024
Amount
Items Description
Changing of SSW(7th and SNE (5th) 38mm x 680M, 6x1 Core (RHL) Guide Rope of PIT No.01, Chinakuri Mine-I
Placing of guide rope, un-reeling, bending of end portion for clamping, Manila rope preparation etc.
Hanging of South side cage on pipes, dismantling of safety hook, clamping the guide rope with South side winding rope, coiling of guide rope on winder’ drum very slowly till the North side winding rope comes at flat drum.
Clamping of North side winding rope at top of headgear and now slowly-slowly withdrawing of winding rope from flat drum, drum winch & laying at surface then coiling of rest new guide rope on wider’ drum.
Clamping of new guide rope with old one, lifting some height for free hanging of cheese weight at bottom, after hanging clamping of cheese weight at that position and dismantling/cutting the old guide rope from cheese weight.
Lowering of old guide rope with the help of new guide rope and simultaneously withdrawing of old guide rope cutting in pieces of 100’ and keeping beside at pit bottom manually.
After complete taken out of old guide rope taking the new guide rope clamping with cheese weight in bottom most of pit, carefully and slowly hanging of cheese weight at actual position.
Positioning and clamping of new guide rope at top of the headgear, de-clamping of South side winding rope from new guide rope then lowering of safety hook fastening with suspension gear and making free hanging of cage after withdrawing the supports.
Lowering of South side winding rope till the marked position and then inserting the North side winding rope into drum winch and coiling manually then after taking the rope into flat drum.
After taking the North side winding rope into flat drum, de-clamping the winding rope at top of headgear structure for free hang of North cage then plying of both side cages for necessary checking & adjustment.
Providing of DA
Providing of oxygen
Overhead cost & Others
Add: CMPF @ 12%
Add: Bonus @ 8.33%
Add: Pension @ 7%
Total impact of GST for the purpose of CTC
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .