| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.5 Cr+₹18.3 L (13.5%)Rejected-Finance NIL A 13 MA0NO 37 MOHADDIPUR POLICE STATION CANTT DISTRICT GORAKHPUR UTTAR PRADESH | GORAKHPUR | UTTAR PRADESH | 273001 | ₹1.5 Cr+₹18.3 L (13.5%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.6 Cr+₹19.0 L (14.0%)Rejected-Finance 99 SUSHILA BIHAR BHUD BULANDSHAHAR | ₹1.6 Cr+₹19.0 L (14.0%) | L3 | Rejected-Finance L3 |
Tender Value
₹1.8 Cr
EMD Value
₹3.5 L
Closing Date
3 Oct 2023, 1:00 pmClosed
Superintending Engineer
Superintending Engineer Rapti Nahar Nirman Mandal 2 Basti UP
Construction of V.R.B.(Box Calvert) at Km. 29.950 on Compierganj Branch
2023_UPIDC_837297_7
Tender Notic 01/SE/2023-24
Open Tender
Civil Works
Item Wise
90 days
Siddharthnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹3.5 L
Yes
22 Nov 2023
13 Sept 2023
4 Oct 2023
13 Sept 2023
3 Oct 2023
13 Sept 2023
Amount
E/W in excavation of foundation in all type of soil including lead up to 30m lift up to 1.50m and its proper disposal and back filling as per direction by engineer in charge required for proper complection of work including cost of all T&P,Labour etc.
Laying C.C, A-40, M-15 in foundation with cement (OPC 43 Grade),coarse sand of F.M not less then 2.00 and hard stone ballast (4.75-20mm size) including lead up 60m lift up to 3m mechanical mixing & machinal vibration but excluding of centering and shuttering required for proper completion of work includind cost of all material, T&P,Labour etc.
Laying R.C.C, A-20, M-25 with cement (OPC-43 Grade)coarse sand of F.M not less than 2.5 and crused hard stone grit of size 4.75 to 20mm, including lead up to 60m lift up to 3m, mechnical mixing & mechnical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all meterial, T&P, Labour etc.
Laying R.C.C A-10-M-30 with cement (OPC-43 Grade)coarse sand of F.M not less than 2.5 and crused hard stone grit of size 4.75 to 20mm including lead up to 60m lift up to 3m mechnical mixing & mechnical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all meterial, T&P, Labour etc.
Centering & Shuttering for C.C & R.C.C work with all lead & lift reqired for proper completion of work including cost of all material and scafolding labour, T&P etc A-For RCC slab Above to 3.00m span
Centering & Shuttering for C.C & R.C.C work with all lead & lift reqired for proper completion of work including cost of all material and scafolding labour, T&P etc B-For Pre Cast Work (CC block)
Cutting bending binding and placing TMT steel bar for reinforcement with cost of binding wire with required for proper compltion of work including cost of all material, labour, T&P etc
Laying and fixing joint filler board 18mm thick as specied location in different postion required for proper comletion of work including cost of all material, labour, T&P etc.
Dewatering with all cost of power/POL machines, pump well, point system & operator etc with assembling and dismantling of equipment required for completion of work, labour, T&P etc.
E/W in Removing Diversion in all type of soil including lead up to 1.00 Km. lift up to 1.50m with manual compaction and dressing required for proper completion of work including cost of all T&P, labour etc.
E/W in making Ramp/Diversion in all type of soil including lead up to 1.00 Km. lift up to 1.50m with manual compaction and dressing required for proper completion of work including cost of all T&P, labour etc.
Carriage and laying stone boulder(Weight 20kg to 40kg and minimum dimension of 200 mm) for canal outer slop protection in campierganj branch required for proper completion of work including cost of all material, labour and T.&P.etc.
PVC water stop seal 10mm thick for proper completion of work including cost of all material, labour, T&P etc
providing and laying 4.75 to 20.mm size crushed stone grit (granite) in laying filter in slopes required for proper completion of work including cost of all materials, labour, T.&P.etc.
providing and laying 20 to 40.mm size crushed stone grit (granite) in laying filter in slopes required for proper complection of work including cost of all materials, labour, T.&P.etc.
P/Laying coarse sand for filter base required for proper completion of work including cost of all materials, labour, T.&P.etc.
Supplying and fixing1200 mm dia NP-3 hume pipe required for proper completion of work including cost of all materials,labour,T. & P.etc.
Brick on edge soling on approch Road/Diversion Ramp with preparation of sub grade and filling joints with local earth, required for proper completion of work, including cost of all material, labour, T&P etc.
Providing expansion joint in R.C.C including placing of angle iron & M.S Plate and filling sealing compound as per drawing required for proper completion of work, including cost of all material, labour etc.
Resoling of old Distmentaled Brick on edge soling at Service Raod & R/B including cost of all material labour T&P etc.
Dismentaling of brick on edge soling including cost of all T&P, labour etc.
S/F Draiange spout pipe 100mm dia in R.C.C slab for proper complition of work including cost of all material, labour, T&P etc
AJAY ASSOCIATES
M/S CHAUDHARY ENTERPRISES
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .