Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.7 LAccepted-Finance | 1 | Accepted-Finance L-1 | |
| 2 | 2₹10.1 L+₹35,701 (3.67%)Rejected-Finance | 2 | Rejected-Finance L-2 | |
| 3 | 3₹10.2 L+₹48,865 (5.02%)Rejected-Finance 102 RETIYA AYODHYA UTTAR PRADESH 224001 | AYODHYA | UTTAR PRADESH | 224001 | 3 | Rejected-Finance L-3 |
| Sl No | Description | Qty | Unit | M/S GAUTAM ENTERPRISES L3 | M/S DINESH CHANDRA TOMAR THEKEDAR L1 | HANIKA ENTERPRISES L2 |
|---|---|---|---|---|---|---|
| 1.00 | Earth Work in excavation of foundation in dry soil. including lift up to 1.5m and lead up to 30m. and including back filling watering ramming and dressing of excavated earth in to the trenches or in to the space between or in to the plinth with removal and disposal of surplus earth as directed by Engineer in charge etc. complete But excluding G.S.T. | 88 | cum | 78 ₹6,864 | 75 ₹6,600 Lowest | 76 ₹6,688 |
| 2.00 | Cement concrete 1:3:6 in foundation in cement, coarse sand, stone grit 20 to 40 mm i/c cost of all Material Labour and T & P etc. | 21.3 | cum | 6,340 ₹1,35,042 | 6,000 ₹1,27,800 Lowest | 6,500 ₹1,38,450 |
| 3.00 | Brick Work (M-105) in 1:3 cement, coarse sand mortar i/c cost of all Material Labour and T&P etc. Complete. | 40.8 | cum | 5,760 ₹2,35,008 | 5,600 ₹2,28,480 Lowest | 6,000 ₹2,44,800 |
| 4.00 | Reinforcement Cement Concrete 1:1.5:3 in cement coarse sand and stone grit 20 mm gauge mechanical mixing and laying in slab with all material, labour, T&P etc. Required for the proper complition of work. | 54.9 | cum | 7,700 ₹4,22,730 | 7,500 ₹4,11,750 Lowest | 7,650 ₹4,19,985 |
| 5.00 | Centering& Shuttering work for CC work i/c cleaning & oiling etc complete for proper compelition of work. | 16 | sqm | 500 ₹8,000 | 450 ₹7,200 Lowest | 500 ₹8,000 |
| 6.00 | Centering and shuttering for ordinary R.C.C. works including cost of all labour and T&P etc. complete. | 50 | sqm | 820 ₹41,000 | 700 ₹35,000 Lowest | 800 ₹40,000 |
| 7.00 | Steel Reinforcement Work i/c Supplying,Cutting, Bending, Binding & Placing of i/c cost of binding wire and Labour,T&P etc complete. | 1.75 | MT | 79,800 ₹1,39,650 | 78,000 ₹1,36,500 Lowest | 79,000 ₹1,38,250 |
| 8.00 | Struck deep pointing in 1:2 C.M. i/c all cost of material T&P etc as per direction of Engineer-in -charge. | 57 | sqm | 118 ₹6,726 | 100 ₹5,700 Lowest | 100 ₹5,700 Lowest |
| 9.00 | Supplying & Fixing 100 mm dia PVC Drainage Pipe i/c all cost of material, T&P etc for Proper complition of work. | 2 | RM | 162 ₹324 | 120 ₹240 | 100 ₹200 Lowest |
| 10.00 | Suppling & Fixing Tarfelt on Abutment Cap i/c all cost of material, T&P etc for Proper complition of work. | 5.2 | sqm | 205 ₹1,066 | 150 ₹780 | 140 ₹728 Lowest |
Tender Value
₹10.3 L
EMD Value
₹21,000
Closing Date
16 Jun 2026, 5:00 pmClosed
EXECUTIVE ENGINEER MGCCD 12 ALIGARH
DODHPUR ALIGARH
Construction of DRB at Km 1.000 of Alhadadpur Minor.
2026_UPIDC_1147187_26
02/EE/2026-27
Open Tender
Civil Works - Bridges
Item Rate
90 days
MORADABAD
Please refer Tender documents.
2 documents required · 2 mandatory
₹516
₹21,000
28 Jun 2026
11 Jun 2026
17 Jun 2026
11 Jun 2026
16 Jun 2026
11 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in excavation of foundation in dry soil. including lift up to 1.5m and lead up to 30m. and including back filling watering ramming and dressing of excavated earth in to the trenches or in to the space between or in to the plinth with removal and disposal of surplus earth as directed by Engineer in charge etc. complete But excluding G.S.T. | - | cum | - | - |
| 2 | Cement concrete 1:3:6 in foundation in cement, coarse sand, stone grit 20 to 40 mm i/c cost of all Material Labour and T & P etc. | - | cum | - | - |
| 3 | Brick Work (M-105) in 1:3 cement, coarse sand mortar i/c cost of all Material Labour and T&P etc. Complete. | 1 | cum | - | - |
| 4 | Reinforcement Cement Concrete 1:1.5:3 in cement coarse sand and stone grit 20 mm gauge mechanical mixing and laying in slab with all material, labour, T&P etc. Required for the proper complition of work. | 1 | cum | - | - |
| 5 | Centering& Shuttering work for CC work i/c cleaning & oiling etc complete for proper compelition of work. | - | sqm | - | - |
| 6 | Centering and shuttering for ordinary R.C.C. works including cost of all labour and T&P etc. complete. | - | sqm | - | - |
| 7 | Steel Reinforcement Work i/c Supplying,Cutting, Bending, Binding & Placing of i/c cost of binding wire and Labour,T&P etc complete. | - | MT | - | - |
| 8 | Struck deep pointing in 1:2 C.M. i/c all cost of material T&P etc as per direction of Engineer-in -charge. | - | sqm | - | - |
| 9 | Supplying & Fixing 100 mm dia PVC Drainage Pipe i/c all cost of material, T&P etc for Proper complition of work. | - | RM | - | - |
| 10 | Suppling & Fixing Tarfelt on Abutment Cap i/c all cost of material, T&P etc for Proper complition of work. | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
thirteen.pdf
Tender Documents • 1.23 MB
BOQ_2171794.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .