| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.6 LAccepted-AOC | ₹26.6 L | L1 | Accepted-AOC L1 BIDDER |
| 2 | L2₹26.6 LRejected-AOC | ₹26.6 L | L2 | Rejected-AOC L2 BIDDER |
| 3 | L3₹26.6 LRejected-AOC | ₹26.6 L | L3 | Rejected-AOC L3 BIDDER |
| Sl No | Description | Qty | Unit | MADHURJYA BORAH | GAUTAM LAHAN | PRABIN NATH |
|---|---|---|---|---|---|---|
| 1.00 | Item No 2.6.1-Earthwork in excavation by mechanical means Hydroulic excavator manual means over areas exceeding 30cm in depth,1.5m in width as well as 10sqm plan including getting out and disposed of excavated earth lead upto 50m and lift upto 1.5m,as directed by engineer in charge. | 134.87 | Cubic mtr | 29,732.09 ₹29,732.09 | 29,732.09 ₹29,732.09 | 29,732.09 ₹29,732.09 |
| 2.00 | Item No 11.1.1-Brick on edge flooring with bricks of class designation 7.5 on abed of 12mm cement morter includuing filling the joints with sand mortar with common brunt clay non modular bricks. 1:4 | 149.85 | Cubic mtr | 1,47,152.7 ₹1.5 L | 1,47,602.25 ₹1.5 L | 1,45,654.2 ₹1.5 L |
| 3.00 | Item No 4.1.5-Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering – all work upto plinth level. 1:3:6 | 11.24 | Cubic mtr | 75,683.42 ₹75,683.42 | 75,683.42 ₹75,683.42 | 75,683.42 ₹75,683.42 |
| 4.00 | Item No 5.22.6-A Steel reinforcement for RCC work including straightening,cutting,bending,placing in position and binding all complete aboveplinth level. | 2,304.1 | KG | 2,17,737.45 ₹2.2 L | 2,18,889.5 ₹2.2 L | 2,16,585.4 ₹2.2 L |
| 5.00 | Item No 5.22.1-Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level.Mild steel and Medium Tensile steel bars | 358.16 | KG | 33,667.04 ₹33,667.04 | 33,667.04 ₹33,667.04 | 33,667.04 ₹33,667.04 |
| 6.00 | Item No 5.22A.6-Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete above plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | 2,158.14 | KG | 2,02,865.16 ₹2.0 L | 2,02,865.16 ₹2.0 L | 2,02,865.16 ₹2.0 L |
| 7.00 | Item No 5.22A.1-Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete above plinth level.Mild steel and Medium Tensile steel bars | 423.28 | KG | 39,788.32 ₹39,788.32 | 39,788.32 ₹39,788.32 | 39,788.32 ₹39,788.32 |
| 8.00 | Item No 5.9.5-Centering and shuttering including strutting, propping etc. and removalof form for Lintels, beams, plinth beams, girders, bressumers and cantilevers | 222 | Sqm | 1,55,035.92 ₹1.6 L | 1,55,035.92 ₹1.6 L | 1,55,035.92 ₹1.6 L |
| 9.00 | Item No 5.9.6-Centering and shuttering including strutting, propping etc. and removal of form forColumns, Pillars, Piers, Abutments, Posts and Struts | 333 | Sqm | 2,97,785.25 ₹3.0 L | 2,97,785.25 ₹3.0 L | 2,97,785.25 ₹3.0 L |
| 10.00 | Item No 5.1.3-Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 37.96 | Cubic mtr | 3,09,184.2 ₹3.1 L | 3,09,184.2 ₹3.1 L | 3,09,184.2 ₹3.1 L |
Updated dates
Tender Value
₹26.6 L
EMD Value
₹53,300
Closing Date
19 Feb 2026, 4:00 pmClosed
Executive Officer
EO,SOOTEA MB
Construction of Boundary Wall at Sootea Solid Waste Management Plant(PH-II) under 15TH FC Tied Grant
2026_UDD_50486_1
SMB/2/15FCTG/NIT-9/24-25/3595
Open Tender
Civil Works
60 days
Sootea MB
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹53,300
Yes
OFFICE OF THE SOOTEA MB
7 Mar 2026
23 Jan 2026
20 Feb 2026
23 Jan 2026
19 Feb 2026
23 Jan 2026
23 Jan 2026 - 5 Feb 2026
30 Jan 2026
Item No 2.6.1-Earthwork in excavation by mechanical means Hydroulic excavator manual means over areas exceeding 30cm in depth,1.5m in width as well as 10sqm plan including getting out and disposed of excavated earth lead upto 50m and lift upto 1.5m,as directed by engineer in charge.
Item No 11.1.1-Brick on edge flooring with bricks of class designation 7.5 on abed of 12mm cement morter includuing filling the joints with sand mortar with common brunt clay non modular bricks. 1:4
Item No 4.1.5-Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering – all work upto plinth level. 1:3:6
Item No 5.22.6-A Steel reinforcement for RCC work including straightening,cutting,bending,placing in position and binding all complete aboveplinth level.
Item No 5.22.1-Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level.Mild steel and Medium Tensile steel bars
Item No 5.22A.6-Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete above plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more.
Item No 5.22A.1-Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete above plinth level.Mild steel and Medium Tensile steel bars
Item No 5.9.5-Centering and shuttering including strutting, propping etc. and removalof form for Lintels, beams, plinth beams, girders, bressumers and cantilevers
Item No 5.9.6-Centering and shuttering including strutting, propping etc. and removal of form forColumns, Pillars, Piers, Abutments, Posts and Struts
Item No 5.1.3-Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Item No 5.3-Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels,bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Item No 6.13.2-Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V levelCement mortar 1:4 (1 cement :4 coarse sand)
Item No 13.1.2-12 mm cement plaster of mix : 1:6 (1 cement: 6 fine sand)
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
RFP.pdf
Tender Documents • 1.88 MB
BOQ_80362.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid