Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹96.7 LAccepted-AOC | ₹96.7 L | 1 | Accepted-AOC AGREEMENT DONE AS PER ATTACHED CONCERN DIVISION LETTER. |
| 2 | 2₹1.2 Cr+₹23.3 L (24.1%)Rejected-Finance | ₹1.2 Cr+₹23.3 L (24.1%) | 2 | Rejected-Finance BEING L2 |
| 3 | 3₹1.3 Cr+₹30.2 L (31.2%)Rejected-Finance CHETNA NAGAR WARD NO 13 AMARKANTAK ROAD AMARKANTAK TIRAHA DISTT ANUPPUR MP PIN 484224 | ANUPPUR | MADHYA PRADESH | 484224 | ₹1.3 Cr+₹30.2 L (31.2%) | 3 | Rejected-Finance BEING L3 |
| 4 | 4₹1.3 Cr+₹33.3 L (34.4%)Rejected-Finance | ₹1.3 Cr+₹33.3 L (34.4%) | 4 | Rejected-Finance BEING L4 |
Tender Value
₹1.4 Cr
EMD Value
₹1.4 L
Closing Date
9 Jun 2023, 5:30 pmClosed
EXECUTIVE ENGINEER WATER RESOURCES DIV Katni
OFFICE OF THE EXECUTIVE ENGINEER WATER RESOURCES DIVISION Katni (M.P)
On Turnkey Basis Construction of Ghat Khirwa Stop Dam, as per detailed scope of work but not limited to that
2023_WRD_266617_1
979/2022-23/Einc/Etendering/ dt.12-04-2023
Open Tender
Civil Works - Others
Turn-key
365 days
Katni
Please refer Tender documents.
7 documents required · 7 mandatory
₹12,500
₹1.4 L
11 Sept 2023
24 Apr 2023
12 Jun 2023
25 Apr 2023
9 Jun 2023
26 Apr 2023
Amount
ON TURN KEY BASIS Construction of Ghat Khirwa Stop Dam, in Katni block of District Katni and all necessary costruction work to irrigate 98 Ha.CCA. This activity also Include survey & investigation, geological Investigation, preparation & submission of LA. Cases for Pvt. /Govt./forest land, design, drawing. estimation, DPR submission and its approval from competent authority for Ghat Khirwa Stop Dam including maintenance & defect liability period of two years from date of issue of completion certificate
ON TURN KEY BASIS Construction of Ghat Khirwa Stop Dam, in Katni block of District Katni and all necessary costruction work to irrigate 98 Ha.CCA. This activity also Include survey & investigation, geological Investigation, preparation & submission of LA. Cases for Pvt. /Govt./forest land, design, drawing. estimation, DPR submission and its approval from competent authority for Ghat Khirwa Stop Dam including maintenance & defect liability period of two years from date of issue of completion certificate
SURENDRA EARTHMOVERS
M/S PRAKASH CHANDRA MISHRA
KAUSHAL CONTRACTORS PRIVATE LIMITED
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .