| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.1 CrAccepted-AOC DISTRICT PRAYAGRAJ | PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | ₹9.1 Cr Quoted ₹9.2 Cr | L1 | Accepted-AOC accept |
| 2 | L2₹11.5 Cr+₹2.3 Cr (25.0%)Rejected-Finance BHARAHADNA SADAR MIRZAPUR | MIRZAPUR | MIRZAPUR | UTTAR PRADESH | ₹11.5 Cr+₹2.3 Cr (25.0%) | L2 | Rejected-Finance RATE |
| 3 | L3₹11.7 Cr+₹2.5 Cr (27.4%)Rejected-Finance 12 10 LOHIYA MARG DISTT PRAYAGRAJ U P | PRAYAGRAJ | UTTAR PRADESH | 211001 | ₹11.7 Cr+₹2.5 Cr (27.4%) | L3 | Rejected-Finance RATE |
| 4 | L4₹12.9 Cr+₹3.7 Cr (39.9%)Rejected-Finance MIRZAPUR UTTAR PRADESH | ₹12.9 Cr+₹3.7 Cr (39.9%) | L4 | Rejected-Finance RATE |
| Sl No | Description | Qty | Unit | Bansal Highway Infratech Pvt Ltd L3 | MS RAKESH KUMAR PANDEY L4 | APS AND COMPANY PRIVATE LIMITED L1 | SHUBH CONSTRUCTION L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Construction of embankment with ordinary soil obtained from borrowpit with all lifts and lead, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. | 23,234 | Cum | 80 ₹18,58,720 | 169.3 ₹39,33,516.2 | 45 ₹10,45,530 Lowest | 135 ₹31,36,590 |
| 2.00 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. | 8,841.8 | Cum | 60 ₹5,30,508 | 68.8 ₹6,08,315.84 | 45 ₹3,97,881 Lowest | 50 ₹4,42,090 |
| 3.00 | Excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. | 8,841.8 | Cum | 50 ₹4,42,090 | 60.6 ₹5,35,813.08 | 45 ₹3,97,881 Lowest | 50 ₹4,42,090 |
| 4.00 | Construction of granular sub-base by providing coarse graded material grade-I, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. | 9,254.81 | Cum | 1,800 ₹1,66,58,658 | 1,733.5 ₹1,60,43,213.13 | 1,200 ₹1,11,05,772 Lowest | 1,500 ₹1,38,82,215 |
| 5.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.[WMM] | 11,746.35 | Cum | 2,100 ₹2,46,67,335 | 1,879 ₹2,20,71,391.65 | 1,500 ₹1,76,19,525 Lowest | 1,500 ₹1,76,19,525 Lowest |
| 6.00 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. | 70 | Cum | 6,000 ₹4,20,000 | 5,436 ₹3,80,520 | 2,000 ₹1,40,000 Lowest | 4,000 ₹2,80,000 |
| 7.00 | Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 310 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing | 70 | Cum | 8,000 ₹5,60,000 | 8,643.44 ₹6,05,040.8 | 7,500 ₹5,25,000 Lowest | 7,500 ₹5,25,000 Lowest |
| 8.00 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 76,230 | Sqm | 30 ₹22,86,900 | 50.41 ₹38,42,754.3 | 25 ₹19,05,750 Lowest | 50 ₹38,11,500 |
| 9.00 | Providing and applying Tack coat with bitumen Pressure distributor at the rate of 0.30kg per sqm with Bitumen VG-10 on the prepared granular /bituminous surface cleaned with mechanical broom befor DBM | 76,230 | Sqm | 11.5 ₹8,76,645 | 18.1 ₹13,79,763 | 10 ₹7,62,300 Lowest | 18 ₹13,72,140 |
| 10.00 | Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder V.G. 30 @ 4.50 .per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. Grade II | 4,192.65 | Cum | 9,500 ₹3,98,30,175 | 10,610 ₹4,44,84,016.5 | 8,000 ₹3,35,41,200 Lowest | 9,800 ₹4,10,87,970 |
Tender Value
₹13.4 Cr
EMD Value
₹26.8 L
Closing Date
23 Mar 2026, 12:00 pmClosed
SE MZP CIRCLE PWD MIRZAPUR
SE MZP CIRCLE PWD MIRZAPUR
WIDENING AND STRENGTHENING
2026_CEMRZ_1126435_1
612/53 MZP CIRCLE/2026 DT 06-02-2026
Open Tender
Civil Works
Fixed-rate
365 days
MIRZAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,720
Yes
₹26.8 L
Yes
SE MZP CIRCLE PWD MIRZAPUR
30 Jun 2026
17 Mar 2026
23 Mar 2026
17 Mar 2026
23 Mar 2026
17 Mar 2026
17 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment with ordinary soil obtained from borrowpit with all lifts and lead, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. | 23,234 | Cum | - | - |
| 2 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. | 8,841.8 | Cum | 290 | ₹25,64,122 |
| 3 | Excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. | 8,841.8 | Cum | - | - |
| 4 | Construction of granular sub-base by providing coarse graded material grade-I, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. | 9,254.81 | Cum | 650 | ₹60,15,626.5 |
| 5 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.[WMM] | 11,746.35 | Cum | 210 | ₹24,66,733.5 |
| 6 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. | 70 | Cum | 6,556.65 | ₹4,58,965.74 |
| 7 | Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 310 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing | 70 | Cum | - | - |
| 8 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 76,230 | Sqm | - | - |
| 9 | Providing and applying Tack coat with bitumen Pressure distributor at the rate of 0.30kg per sqm with Bitumen VG-10 on the prepared granular /bituminous surface cleaned with mechanical broom befor DBM | 76,230 | Sqm | - | - |
| 10 | Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder V.G. 30 @ 4.50 .per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. Grade II | 4,192.65 | Cum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.20 MB
Tendernotice_2.pdf
PDF • 1.10 MB
Tendernotice_3.pdf
PDF • 0.75 MB
BOQ_2100617.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .