| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 CrAccepted-Finance DISTRICT PRAYAGRAJ | PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | ₹9.2 Cr | L1 | Accepted-Finance RATE |
| 2 | L2₹11.5 CrRejected-Finance BHARAHADNA SADAR MIRZAPUR | MIRZAPUR | MIRZAPUR | UTTAR PRADESH | ₹11.5 Cr | L2 | Rejected-Finance RATE |
| 3 | L3₹11.7 CrRejected-Finance 12 10 LOHIYA MARG DISTT PRAYAGRAJ U P | PRAYAGRAJ | UTTAR PRADESH | 211001 | ₹11.7 Cr | L3 | Rejected-Finance RATE |
| 4 | L4₹12.9 CrRejected-Finance MIRZAPUR UTTAR PRADESH | ₹12.9 Cr | L4 | Rejected-Finance RATE |
| Sl No | Description | Qty | Unit | Bansal Highway Infratech Pvt Ltd L3 | MS RAKESH KUMAR PANDEY L4 | APS AND COMPANY PRIVATE LIMITED L1 | SHUBH CONSTRUCTION L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Construction of embankment with ordinary soil obtained from borrowpit with all lifts and lead, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. | 23,234 | Cum | 80 ₹18.6 L | 169.3 ₹39.3 L | 45 ₹10.5 L | 135 ₹31.4 L |
| 2.00 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. | 8,841.8 | Cum | 60 ₹5.3 L | 68.8 ₹6.1 L | 45 ₹4.0 L | 50 ₹4.4 L |
| 3.00 | Excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. | 8,841.8 | Cum | 50 ₹4.4 L | 60.6 ₹5.4 L | 45 ₹4.0 L | 50 ₹4.4 L |
| 4.00 | Construction of granular sub-base by providing coarse graded material grade-I, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. | 9,254.81 | Cum | 1,800 ₹1.7 Cr | 1,733.5 ₹1.6 Cr | 1,200 ₹1.1 Cr | 1,500 ₹1.4 Cr |
| 5.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.[WMM] | 11,746.35 | Cum | 2,100 ₹2.5 Cr | 1,879 ₹2.2 Cr | 1,500 ₹1.8 Cr | 1,500 ₹1.8 Cr |
| 6.00 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. | 70 | Cum | 6,000 ₹4.2 L | 5,436 ₹3.8 L | 2,000 ₹1.4 L | 4,000 ₹2.8 L |
| 7.00 | Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 310 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing | 70 | Cum | 8,000 ₹5.6 L | 8,643.44 ₹6.1 L | 7,500 ₹5.3 L | 7,500 ₹5.3 L |
| 8.00 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 76,230 | Sqm | 30 ₹22.9 L | 50.41 ₹38.4 L | 25 ₹19.1 L | 50 ₹38.1 L |
| 9.00 | Providing and applying Tack coat with bitumen Pressure distributor at the rate of 0.30kg per sqm with Bitumen VG-10 on the prepared granular /bituminous surface cleaned with mechanical broom befor DBM | 76,230 | Sqm | 11.5 ₹8.8 L | 18.1 ₹13.8 L | 10 ₹7.6 L | 18 ₹13.7 L |
| 10.00 | Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder V.G. 30 @ 4.50 .per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. Grade II | 4,192.65 | Cum | 9,500 ₹4.0 Cr | 10,610 ₹4.4 Cr | 8,000 ₹3.4 Cr | 9,800 ₹4.1 Cr |
Tender Value
₹13.4 Cr
EMD Value
₹26.8 L
Closing Date
23 Mar 2026, 12:00 pmClosed
SE MZP CIRCLE PWD MIRZAPUR
SE MZP CIRCLE PWD MIRZAPUR
WIDENING AND STRENGTHENING
2026_CEMRZ_1126435_1
612/53 MZP CIRCLE/2026 DT 06-02-2026
Open Tender
Civil Works
365 days
MIRZAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,720
Yes
₹26.8 L
Yes
SE MZP CIRCLE PWD MIRZAPUR
18 Apr 2026
17 Mar 2026
23 Mar 2026
17 Mar 2026
23 Mar 2026
17 Mar 2026
17 Mar 2026
Construction of embankment with ordinary soil obtained from borrowpit with all lifts and lead, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.
Excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.
Construction of granular sub-base by providing coarse graded material grade-I, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.[WMM]
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 310 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
Providing and applying Tack coat with bitumen Pressure distributor at the rate of 0.30kg per sqm with Bitumen VG-10 on the prepared granular /bituminous surface cleaned with mechanical broom befor DBM
Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder V.G. 30 @ 4.50 .per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. Grade II
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binderVG30 @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects
Construction of Patari with ordinary soil obtained from road side with all lifts and lead up to 5 km, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
U Type Deep Drain- Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Reinforced Cement Concrete in Foundation complete as per Drawing and Technical Specifications.RCC Grade- M-25 of cement coarse sand FM 2.5 and stone aggregate 20mm .
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.
350, 600,AND 1000MM DIA HP NP 3- Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Stone Masonry Work in Cement Mortar 1:3 in Foundation complete as per Drawing and Technical Specifications.
Laying Reinforced cement concrete pipe NP3/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . 350 mm dia
Laying Reinforced cement concrete pipe NP3/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . 600 mm dia
Laying Reinforced cement concrete pipe NP3/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . 1000 mm dia
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_2100617.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.20 MB
Tendernotice_2.pdf
PDF • 1.10 MB
Tendernotice_3.pdf
PDF • 0.75 MB
BOQ_2100617.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid