| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.8 LAccepted-AOC NO 12B SESHADRIPALAYAM STREET KANCHEEPURAM 631503 | KANCHEEPURAM | KANCHEEPURAM | TAMIL NADU | 631503 | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | M S SIVAKUMAR L1 |
|---|---|---|---|---|
| 1.00 | Preparing route alignment map using remote sensing method along with field works with GTS map using 1:50,000 scale including procurement, processing GTS map GEO referanceing, route in the layout with identification of reserved forest developed area, etc., including cost of all materials, labour, all lead, lift etc., complete as per standard specification and as directed by the department engineer at site. | 5.83 | Kms. | 4,000 ₹23,332 Lowest |
| 2.00 | Conducting preliminary survey and detialed survey with GPS, total station and DGPS, plotting profile and tower spotting and submission of report, tower schedule, justification of angle points (10 copies) and profile in duplicate including cost of all materials, transporting, labour, lead, lift, etc. and incorporating the details of exisitng structures viz., coal pipe conveyors, transmission lines, etc., complete and as directed by the Department Engineer at site. | 5.83 | Kms. | 25,000 ₹1,45,825 Lowest |
| 3.00 | Preparation of crossing drawing in Auto Cad and submission of P & T, EHT, Roads, Railway crossing etc., including cost of all materials, leads, lifts etc., complete. | 30 | Nos. | 10,000 ₹3,00,000 Lowest |
| 4.00 | Clearing the light jungle for surveying including cost of labour, lead lift etc., complete as directed by department engineer at site. | 25,848 | M2 | 8 ₹2,06,784 Lowest |
| 5.00 | Soil investigation by auger up to the depth of 10 M or up to refusal strate where N - value is obtained 50/100 whichever met earlier. Conducting Penetration Test at the change of layer and at specified interval of 1 M to 1.5 M, carrying out las tests as per IS standards, providing report with recommendation for foundation including mobilisation and demobilisation, shifting from location to location, water charges for drilling, etc complete. | 8 | Nos. | 60,000 ₹4,80,000 Lowest |
| 6.00GST for bidders within TamilNadu | ||||
| 6.01 | SGST | 1 | percentage | 0.09 ₹1,04,034.69 Lowest |
| 6.02 | CGST | 1 | percentage | 0.09 ₹1,04,034.69 Lowest |
| 7.00 | GST for bidders outside TamilNadu (IGST) | 1 | percentage | - |
Tender Value
₹10.3 L
EMD Value
₹10,350
Closing Date
6 Jun 2025, 2:00 pmClosed
SE/GCC-I/CNI
230KV GIS SS Complex, A-10, Thiru-Vi-Ka Industrial Estate, Guindy, Chennai-32
as per NIT
2025_EB_561169_1
OT-019/25-26 of SE/GCC-I/CNI
Open Tender
Civil Works
Works
60 days
SP Koil
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,350
Yes
3 Oct 2025
23 May 2025
7 Jun 2025
23 May 2025
6 Jun 2025
23 May 2025
Amount
Preparing route alignment map using remote sensing method along with field works with GTS map using 1:50,000 scale including procurement, processing GTS map GEO referanceing, route in the layout with identification of reserved forest developed area, etc., including cost of all materials, labour, all lead, lift etc., complete as per standard specification and as directed by the department engineer at site.
Conducting preliminary survey and detialed survey with GPS, total station and DGPS, plotting profile and tower spotting and submission of report, tower schedule, justification of angle points (10 copies) and profile in duplicate including cost of all materials, transporting, labour, lead, lift, etc. and incorporating the details of exisitng structures viz., coal pipe conveyors, transmission lines, etc., complete and as directed by the Department Engineer at site.
Preparation of crossing drawing in Auto Cad and submission of P & T, EHT, Roads, Railway crossing etc., including cost of all materials, leads, lifts etc., complete.
Clearing the light jungle for surveying including cost of labour, lead lift etc., complete as directed by department engineer at site.
Soil investigation by auger up to the depth of 10 M or up to refusal strate where N - value is obtained 50/100 whichever met earlier. Conducting Penetration Test at the change of layer and at specified interval of 1 M to 1.5 M, carrying out las tests as per IS standards, providing report with recommendation for foundation including mobilisation and demobilisation, shifting from location to location, water charges for drilling, etc complete.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .