| # | Company | Amount |
|---|---|---|
| 1 | ₹11.0 Cr OTH ANAND KUMAR SINGHANIA FLAT 2C GANGA APARTMENT 48 16 JESSORE ROAD KOLKATA 700055 | ₹11.0 Cr |
Tender Value
₹11.0 Cr
EMD Value
₹11.0 L
Closing Date
31 Oct 2023, 11:00 amClosed
Structural Package Detailed Engineering, Fabrication Shop Fabrication, Supply, Erection, Testing and Commissioning of Structural Steel Items for 2 nos. of 150 meter high Reinforced concrete single steel flue chimney Unit 1 & 2 of FGD system at 3 660 MW North Karanpura STPP, Jharkhand
NBCC/SBG/etender/2023/79
NBCC/SBG/etender/2023/79
Open Tender-Domestic
Civil Works General
Gorakhpur, Uttar Pradesh
₹11,800
₹11.0 L
4 Aug 2026
20 Oct 2023
31 Oct 2023
31 Oct 2023
6 Nov 2023
materials, cutting to shape, grinding, drilling etc., complete as per drawings and
specifications.
Providing, laying and packing, at all levels, asbestos ropes at expansion joints
including the cost of all labour material, etc. complete as per drawing and specifications.
b 12 mm (diameter) at expansion joints between linig segments. Rm 320.00 320.00 640.00 263.00 168320.00
Providing and installing, at all levels, resin bonded rock wool insulation slabs of
density not less than 100 kg/cu.m with an installed thickness of not less than 100
mm, on the outside surface of steel flue liners,on the outside surface of brick
liner, on the inside surface of concrete windshield, inside surface of concrete
minishells, under the cast iron caps and wherever as directed by the Engineer, in
47 two layers (each 50 mm thick) including the cost of all labour, material and equipment, Sqm 300.00 300.00 600.00 699.00 419400.00
transporting, lifting to all heights, etc., inclusive of plated or galvanised accessories
such as pins/studs/anchors/wire netting, speed washers, tying wires, etc.
welding of pins/studs to steel surfaces or embedding of pins/studs/anchors in
concrete surfaces, fixing, cutting, cutting, lapping, binding, testing, etc. complete
as per drawings and specifications.
Providing and packing, at all levels, loose rock wool insulation to a density not less
than 100 kg/cu.m between the insulated minishells and brick liners at
49 expanjoints between the lining segments and wherever as directed by the Cum 10.00 10.00 20.00 8000.00 160000.00
Engneer including the cost of all labour, material and equipment, filling,
ramming, testing, etc. complete as per drawings and specifications.
Designing, supplying, fabricating and installing after approval by the
Engineer, non- metalic expansion joints to seal gaps between chimney
components and to meet the service requirements of wet stack and as given in
the specifications alongwith the cost of all components of the expansion joint,
69 insulation, galvanised bolts, nuts, washers, anchor fasteners and retaining bars,
packing materials and reinforcements at the connecting ends and flanges, lapping etc.
including cost of all labour and equipment, user hand books (giving details of
installation, dismantling and maintenance procedures for the expansion joints) etc.
complete as per drawings and specifications for:
a Expansion joint between ducts and liners. Sqm 50.00 50.00 100.00 12600.00 1260000.00
b Expansion joint between duct and chimney shell. Sqm 50.00 50.00 100.00 18375.00 1837500.00
Fabricating and erecting FRP Pipes (Material as per Sl No. S73 of SCH-4 SUPPLY) with
all bends, flanges, stiffeners, all other flue attachments, including support
system, collars, connection with C276 pipes and any other accessories as required
73 outside chimney flue liner at all elevation based on the approved design in line Kg 488.00 488.00 976.00 443.00 432368.00
with gas-flow-model study report, including surface finishing, sealing, lamination,
moulding, testing, guarantee / warranty etc. complete as per drawings,
specification, manufacturer's recommendations and relevant codes.
Erection and Alignment of miscellaneous steel parts to be embedded/cast in concrete (like
staircase embedments, corbel face plates, etc) at all positions and levels including the cost of
all labour, materials and equipments for setting materials in concrete, grouting, welding, bolts
& bolting, expansion anchors, drilling, cutting, etc. complete as per drawings and
specification.[Material supply including structural steel parts is in scope of contractor]
(FABRICATION AND ERECTION)
Erection and Alignment of high strength structural steel (E350 ) in built up section conforming to
IS:2062, in columns, beams, struts, monorails, stays, safety chains, ladders, gantry girders,
roof trusses, portals, laced purlins, space frames, hangers, wall beams, sheeting runners,
brackets, stiffeners, stub columns, bracings, cleats, base plates, splice plates,gussets, end
plates, steel frame grid over false ceiling, walkway platforms, ladders, stairs,stringers, treads,
landings, decking and seal plates, galleries etc including blast cleaning, providing & applying
primer,providing and applying intermediate, final and final finish coat of paint (blast cleaning,primer
and paint shall be paid separately as per item no C23, D23 & E23),connection design &
preparation of fabrication drgs, straightening, cutting, bending, rolling, grinding, machining,
drilling, welding, electrodes and other consumables, alignment, erection bolts & nuts (weight of
A23 erection bolts, nuts and welds not payable), assembly, edge preparation, preheating (However,
permanent bolts are payable separately), assembly, edge preparation, preheating (min preheat and
interpass temperature of 120-140o C for welding over 20 mm thickness & use of low
hydrogen/ radiogenic electrodes), post heating, testing of welders, inspection of welds, visual
inspection, non destructive and special testing, rectification and correction of defective welding
works, production test plate, inspection and testing, erection scheme, protection against
damage in transit, stability of structures, installation of temporary structures, setting column bases,
surface preparation by means of manual or mechanical power tools as per IS:1477 part 1,
touch-up painting, rectification, dismantling and removal of all temporary structures (weight of
temporary structures not payable), etc all complete. Including appointment of a seperate
agency, approved by BHEL, for review and approval of fabrication drgs, in consultation with BHEL.
For shop fabricated structural steel (Supply of structural steel in vendor scope)
a Payment terms on : (a) Supply of fabricated material - 65 % (b) Erection - 25% (c) Alignment - 10% MT 44.00 44.00 88.00 27300.00 2402400.00
For site fabricated structural steel(Structural steel shall be issued by BHEL free of cost)
b Payment terms on : (a) Fabrication - 65 % (b) Erection - 25% (c) Alignment - 10% MT 11.00 11.00 22.00 9922.50 218295.00
FABRICATION AND ERECTION
Digitally signed by PRIYA
Erection and Alignment of structural steel of grade E 250 in rolled/ built up section conforming to
IS:2062, mild steel rounds in columns, beams, struts, monorails, stays, safety chains, ladders, MS
gratings, gantry girders, roof trusses, portals, laced purlins, space frames, hangers, wall beams,
sheeting runners, brackets, stiffeners, stub columns, bracings, cleats, base plates, splice
plates,gussets, end plates, steel frame grid over false ceiling, walkway platforms, ladders,
stairs,stringers, treads, landings, decking and seal plates, galleries etc including blast
cleaning, providing & applying primer,providing and applying intermediate, final and final finish coat
of paint (blast cleaning,primer and paint shall be paid separately as per item no C23, D23 & E23),
connection design & preparation of fabrication drgs, straightening, cutting, bending, rolling, grinding,
B23 machining, drilling, welding, electrodes and other consumables, alignment, erection bolts & nuts
(weight of erection bolts and nuts not payable), assembly, edge preparation, preheating / post
heating if required, testing of welders, inspection of welds, visual inspection, non
destructive and special testing, rectification and correction of defective welding works,
production test plate, inspection and testing, erection scheme, protection against damage in
transit, stability of structures, installation of temporary structures, setting column bases, surface
preparation by means of manual or mechanical power tools as per IS:1477 part 1, touch-up
painting, rectification, dismantling and removal of all temporary structures (weight of temporary
structures not payable), etc all complete. Including appointment of a seperate agency, approved by
BHEL, for review and approval of fabrication drgs, in consultation with BHEL.
For shop fabricated structural steel(Supply of structural steel in vendor scope)
a Payment terms on : (a) Supply of fabricated material - 65 % (b) Erection - 25% (c) Alignment - 10% MT 132.00 132.00 264.00 27300.00 7207200.00
For site fabricated structural steel(Structural steel shall be issued by BHEL free of cost)
b Payment terms on : (a) Fabrication - 65 % (b) Erection - 25% (c) Alignment - 10% MT 33.00 33.00 66.00 9922.50 654885.00
FABRICATION AND ERECTION
Erection and Alignment at all levels, structural steel flues (liners) complete with all bends,
flanges, stiffeners, all other flue attachments, support system, collars, access manholes and gas
sampling ports alongwith gaskets and other accessories, staying system, including the cost of all
labour, material and equipment, transporting, lifting to all heights, setting in place, cutting, grinding,
26 drillings, bending, bolts and bolting, welding, preheating and post-heating for welding, testing, etc. MT 360.00 360.00 720.00 12855.15 9255708.00
complete as per drawings and specifications. [Structural steel shall be issued by BHEL free of cost] .
The Flue can to be transported inside the concrete shell horizontally during erection
activity . All necessary arrangement for horizontal movement of flue liner shall be in the
scope of contractor .
Fabrication & Erection of Tilting Platform including cost of materials, the cost of all labour,
material and equipment, transporting, lifting to all heights, setting in place, cutting, grinding, drillings,
bending, bolts and bolting, welding, preheating and post-heating for welding, testing, etc. complete as
per drawings and specifications. (Remarks Tilting Platform is required for Flue Can to be
transported inside the concrete shell horizontally during erection activity. All necessary
arrangement for horizontal movement of flue liner shall be in the scope of contractor.)
Supply & application including blast cleaning of outer surface of Tilting Platform to near white
metal surface conforming to Sa 2 ½ finish of ISO 8501-1 with surface profile 40-60 Micron and
providing and applying two component moisture curing zinc (ethyl) silicate primer coat
(having minimum 80% of metallic Zinc content in dry film, solid by volume minimum
26-TP (a) 60%±2%) of minimum 70 micron DFT including the cost of all labour, material, equipments, MT 15.00 15.00 30.00 8156.00 244680.00
protection of surface and cleaning, scoffolding, touch-up painting etc., complete as per
drawings, specifications and instructions of the Engineer. Zinc dust composition and
properties shall be Type-II as perASTM D520-00. Primer coat shall be applied in Shop
immediately after blast cleaning by airless spray technique.
Providing and applying on outer surface of Tilting Platform, Finish coat of two-pack aliphatic
Isocyanate cured acrylic finish paint (solid by volume minimum 55% ±2%) with Gloss
retention (SSPC Paint Spec No 36, ASTM D 4587, D 2244, D 523) of Level 2 (after minimum 1000
hours exposure, Gloss loss less than 30 and colour change less than 2.0 ∆E) and minimum
26-TP (b) 70 micron DFT over steel sections already having intermediate coats, including the cost of all labour, MT 15.00 15.00 30.00 3556.00 106680.00
material, equipments, protection and cleaning, scoffolding etc. all complete as per drawing and
specifications. This coat shall be applied after an interval of minimum 24 hours (from the application of
sealer coat) and within six (6) months (from the completion of Intermediate coat). Colour and shade of
the coat shall be as approved by the Employer.
Providing, fabricating and installing at various locations and elevations of the chimney system the
following miscellaneous mild steel items complete with the cost of all labour, material and
27 equipment, transporting, lifting, setting in place, cutting, grinding, drilling, welding, bolts and
bolting, anchor fasteners and anchoring, priming, painting, grouting etc. complete as per drawings
and specifications:
Mild steel ladders with cage, hood access hatch, louvers, bird screens, hood drain basin
covers and other miscellaneous mild steel items not specifically mentioned.
32 / 40 mm nominal bore medium class tubular hand railing for stair case and internal and
external platforms.
Providing minimum 275 gsm Hot dipped galvanisation on mild steel parts as per
Providing minimum 610 gsm Hot dipped galvanisation on mild steel parts as per
Name Of Work:- Shop/Factory Fabrication of Structural Steel including painting work as per BOQ/approved drawings and Transportation of
finished fabricated materials at NTPC Project, Tandwa Jharkhand (Supply of raw structural steel as per Technical Specifications in vendor
scope) for 1 nos. of 150-meter-high reinforced concrete single steel flue chimney Unit # 2 & 3 of FGD system at 3 x 660 MW North Karanpura
STPP, Jharkhand”
ITEM SL Quantity Quantity Total Rate (excluding GST) Amount
Description of Item Unit
NO. (Unit 1) (Unit 2) Quantity
Supply and Fabrication of structural steel of grade E 250 in rolled/ built up section
conforming to IS:2062, mild steel rounds in columns, beams, struts, monorails, stays,
safety chains, ladders, MS gratings, gantry girders, roof trusses, portals, laced
purlins, space frames, hangers, wall beams, sheeting runners, brackets, stiffeners, stub
columns, bracings, cleats, base plates, splice plates,gussets, end plates, steel
frame grid over false ceiling, walkway platforms, ladders, stairs,stringers, treads,
landings, decking and seal plates, galleries etc including blast cleaning,
providing & applying primer,providing and applying intermediate, final and final finish
coat of paint (blast cleaning,primer and paint shall be paid separately as per item no
C23, D23 & E23), connection design & preparation of fabrication drgs, straightening,
cutting, bending, rolling, grinding, machining, drilling, welding, electrodes and other
B23 consumables, alignment, erection bolts & nuts (weight of erection bolts and nuts not
payable), assembly, edge preparation, preheating / post heating if required,
testing of welders, inspection of welds, visual inspection, non destructive
and special testing, rectification and correction of defective welding works,
production test plate, inspection and testing, erection scheme, protection against
damage in transit, stability of structures, installation of temporary structures,
setting column bases, surface preparation by means of manual or mechanical
power tools as per IS:1477 part 1, touch-up painting, rectification, dismantling
and removal of all temporary structures (weight of temporary structures not
payable), etc all complete. Including appointment of a seperate agency, approved by
NBCC/BHEL, for review and approval of fabrication drgs, in consultation with
a For shop fabricated structural steel(Supply of structural steel in vendor scope) MT 0.00 132.00 132.00 50700.00 6692400.00
Extra over SL NO. A23 & B23 for blast cleaning of steel structures to near white metal
surface conforming to Sa 2 ½ finish of ISO 8501-1 with surface profile 40-60
Micron and providing and applying two component moisture curing zinc (ethyl)
silicate primer coat (having minimum 80% of metallic Zinc content in dry film,
solid by volume minimum 60% ±2%) of minimum 70 micron DFT including the
cost of all labour, material, equipments, protection of surface and cleaning,
scoffolding, touch-up painting etc., complete as per drawings, specifications
and instructions of the Engineer. Zinc dust composition and properties shall be Type-II
as perASTM D520-00. Primer coat shall be applied in Shop immediately after blast
cleaning by airless spray technique.
Digitally signed by PRIYA
Extra over SL NO. A23 & B23 for providing and applying (by airless spray
technique) intermediate coat of two component polyamide cured epoxy with
MIO Content (containing lamellar MIO minimum 30% on pigment, solid by volume
D23 minimum 80% ±2%) of minimum 100 micron DFT after an interval of minimum MT 0.00 176.00 176.00 1200.00 211200.00
24 hours (from the application of primer coat) and of approved make including
the cost of all labour, material, equipments, protection and cleaning, scoffolding, touch-
up painting etc. all complete as per drawing and specifications.
Extra over SL NO. A23 & B23 for providing and applying Finish coat of two-pack
aliphatic Isocyanate cured acrylic finish paint (solid by volume minimum 55%
±2%) with Gloss retention (SSPC Paint Spec No 36, ASTM D 4587, D 2244, D 523) of
Level 2 (after minimum 1000 hours exposure, Gloss loss less than 30 and colour
change less than 2.0 ∆E) and minimum 70 micron DFT over steel sections already
having intermediate coats, including the cost of all labour, material, equipments,
protection and cleaning, scoffolding etc. all complete as per drawing and specifications.
This coat shall be applied after an interval of minimum 24 hours (from the application of
sealer coat) and within six (6) months (from the completion of Intermediate coat).
Colour and shade of the coat shall be as approved by the NBCC/BHEL.
TOTAL (C)- Rs8,030,000.00
Name Of Work:- Painting work of steel flue liner Unit-1
ITEM SL Quantity Quantity Total Rate (excluding GST) Amount
Description of Item Unit
NO. (Unit 1) (Unit 2) Quantity
Providing and applying on outer surface of steel flue liner, Finish coat of two-pack aliphatic
Isocyanate cured acrylic finish paint (solid by volume minimum 55% ±2%) with Gloss
retention (SSPC Paint Spec No 36, ASTM D 4587, D 2244, D 523) of Level 2 (after minimum 1000
hours exposure, Gloss loss less than 30 and colour change less than 2.0 ∆E) and minimum
26 (iii) 70 micron DFT over steel sections already having intermediate coats, including the cost of all labour, SqM 2800.00 0.00 2800.00 120.00 336000.00
material, equipments, protection and cleaning, scoffolding etc. all complete as per drawing and
specifications. This coat shall be applied after an interval of minimum 24 hours (from the application of
sealer coat) and within six (6) months (from the completion of Intermediate coat). Colour and shade of
the coat shall be as approved by the Employer.
Application of suitable epoxy primer including grit/shot blasting of inner flue surface( Sa 2 ½
finish) , to fully cover the substrate material over all heights of chimney including cost of
labour, material, tools & tackles etc. all complete as per drawings, specification,
manufacturer's recommendation and engineer in charge. (Epoxy Primer shall be supplied by BHEL
free of cost. Onsite supervision of borosilicate glass block lining work shall be provided by BHEL Free
of Cost through the Borosilicate Glass Block Lining System supplier.)
TOTAL (D)- Rs1,456,000.00
TOTAL (A+B+C+D)- Rs109,650,727.00
Digitally signed by PRIYA
stage.html
html • 0.05 MB
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
1 NIT.pdf
Tender Document
2 SCC.pdf
Tender Document
3 BOQ.pdf
Tender Document
4 GCC 2022 WITH AMENDMENT NO 06.pdf
Tender Document
5 APPROVED MAKES.pdf
Tender Document
6 Physical Milestone.pdf
Tender Document
7 TCC Drawings.pdf
Tender Document
8 IP.pdf
Tender Document
Query reply NIT 79.pdf
Tender Document
corrigendum-1994-Corri-2 79.pdf
pdf • 0.10 MB
addendum-38e12b4b0eee-Corri-1 079.pdf
pdf • 0.10 MB
corrigendum-1984-Corri-1 79.pdf
pdf • 0.10 MB
addendum-65180904cea3-1 NIT01.pdf
pdf • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .