| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.6 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹9.5 L+₹97,071.28 (11.3%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹9.6 L+₹1.0 L (12.1%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹9.7 L+₹1.1 L (12.8%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹9.8 L+₹1.2 L (14.3%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹14.4 L
EMD Value
₹28,770
Closing Date
3 Aug 2026, 6:00 pmClosed
Executive Engineer
RnB Division Kralpora
Construction of Boundary wall at KGBV Aloosa 1010300504
2026_PWDJK_317536_4
E tendering NIT No 24/RnB/Kralpora of 2026-27
Open Tender
Civil Works
Percentage
30 days
Kralpora Kupwara
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer RnB Division Kralpora
₹28,770
11 Aug 2026
23 Jul 2026
4 Aug 2026
23 Jul 2026
3 Aug 2026
23 Jul 2026
23 Jul 2026 - 1 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge:1:4:8 or leaner mix (i/c equivalent design mix) | 11.55 | Cum | 1,064.55 | ₹12,295.55 |
| 2 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge:In cement mortar | 12.92 | Cum | 1,458.45 | ₹18,843.17 |
| 3 | Earth work in excavation in all kinds of soil by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed upto all leads in all kinds of soil complete job | 8.78 | Cum | 256.85 | ₹2,255.14 |
| 4 | Providing & Laying of stone soling (duly hand packed) including watering dressing and ramming to achieve desired compaction incl all leads, lifts, loading, unloading, stacking, costs and carriages incl Head load if any upto site of work complete job | 3.96 | Cum | 1,000 | ₹3,960 |
| 5 | Providing & laying in position cement concrete of specified grade including curing but excld. the cost of centring and shuttering all work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) incl all leads, lifts, loading, unloading, stacking, costs and carriages incl Head load if any upto site of work complete job | 1.2 | Cum | 5,202.9 | ₹6,243.48 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)incl all leads, lifts, loading, unloading, stacking, costs and carriages incl Head load if any upto site of work complete job | 54.2 | Cum | 6,591.25 | ₹3,57,245.75 |
| 7 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)incl all leads, lifts, loading, unloading, stacking, costs and carriages incl Head load if any upto site of work complete job | 0.48 | Cum | 9,395.7 | ₹4,509.94 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars incl all leads, lifts, loading, unloading, stacking, costs and carriages incl Head load if any upto site of work complete job | 57.6 | Kg | 123.2 | ₹7,096.32 |
| 9 | Centring and shuttering of kit ply including propping, strutting & removal of the same in Foundations, footings, bases of columns etc. for mass concrete complete job | 148.98 | Sqm | 286.35 | ₹42,660.42 |
| 10 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) incl extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level incl all leads, lifts, loading, unloading, stacking, costs and carriages incl Head load if any upto site of work complete job | 17.93 | Cum | 10,000 | ₹1,79,300 |
stage.html
html • 0.05 MB
finance_1041132.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_1041132.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .