| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAccepted-AOC 14 15 VINAY NAGAR VIJITEM PUBLIC SCHOOL QUARSI RAMGHAT ROAD ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹2.3 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.4 CrRejected-Finance GRAM KHAMINI POST PADAM DISTRICT FIROZABAD UTTAR PRADESH PIN 283130 | FIROZABAD | UTTAR PRADESH | 283130 | ₹2.4 Cr | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical FORM A AND B NOT UPLOADED. |
| Sl No | Description | Qty | Unit | M/s VINAY KUMAR CONTRACTOR L2 | GOMATINETRA CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavaion of foundation in ordinary soil/sandy loam, clay or sand including lift up to 1.50m and lead up to 30M | 3,733.66 | M3 | 50 ₹1.9 L | 87.1 ₹3.3 L |
| 2.00 | Laying .C.C.(1:3:6) with coarse sand ,cement, stone, ballast 20mm to 40mm in size in foundation including cost of all material, labour, T&P etc. | 1,275.8 | M3 | 5,800 ₹74.0 L | 3,953.83 ₹50.4 L |
| 3.00 | C.R.Stone masonry in 1:3 cement sand mortar including cost of all material for proper completion of work. | 2,813.21 | M3 | 4,000 ₹1.1 Cr | 4,392.45 ₹1.2 Cr |
| 4.00 | Deep struck cement pointing in 1:2 cement, sand mortar on stone masonry including cost of all materials labour T&P etc. required for praper for completion of work. | 11,902.69 | M2 | 140 ₹16.7 L | 115.72 ₹13.8 L |
| 5.00 | 1st class brick masonry in 1:3 cement sand mortar including cost of all material for proper completion of work. | 77.68 | M3 | 5,900 ₹4.6 L | 4,944.62 ₹3.8 L |
| 6.00 | Cement pointing in 1:2 cement, sand mortar on brick masonry including cost of all materials labour T&P etc. required for praper for completion of work. | 125.28 | M2 | 150 ₹18,792 | 107.71 ₹13,493.91 |
| 7.00 | Providing and fixing of 150 mm dia HDPE 6 kg/m² pressure Pipe Avg. = (12.00+8.00)/2= 10.00 | 180 | MTR | 160 ₹28,800 | 760.79 ₹1.4 L |
| 8.00 | Providing and Laying 600 mm dia RCC Hume pipe NP-3 including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 10 | MTR | 6,000 ₹60,000 | 3,542.19 ₹35,421.90 |
| 9.00 | Centering and shuttering of R.C.C. work including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 235.74 | M2 | 300 ₹70,722 | 575.5 ₹1.4 L |
| 10.00 | Supplying & fixing 20mm thick joint filler board including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge. | 8.58 | M2 | 80 ₹686.40 | 847.69 ₹7,273.18 |
Tender Value
₹2.9 Cr
EMD Value
₹5.8 L
Closing Date
18 Mar 2026, 3:00 pmClosed
SE
SE IRRIIGATION WORK CIRCLE PRAYAGRAJ
Restoration of Jari Dy. from Km. 0.000 to Km. 10.000 and demarcation of canal land.
2026_UPIDC_1124343_4
07/SE/2025-26
Open Tender
Civil Works
365 days
JARI DY
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹5.8 L
Yes
SE IRRIIGATION WORK CIRCLE PRAYAGRAJ
25 May 2026
12 Mar 2026
18 Mar 2026
12 Mar 2026
18 Mar 2026
12 Mar 2026
12 Mar 2026
Earth work in excavaion of foundation in ordinary soil/sandy loam, clay or sand including lift up to 1.50m and lead up to 30M
Laying .C.C.(1:3:6) with coarse sand ,cement, stone, ballast 20mm to 40mm in size in foundation including cost of all material, labour, T&P etc.
C.R.Stone masonry in 1:3 cement sand mortar including cost of all material for proper completion of work.
Deep struck cement pointing in 1:2 cement, sand mortar on stone masonry including cost of all materials labour T&P etc. required for praper for completion of work.
1st class brick masonry in 1:3 cement sand mortar including cost of all material for proper completion of work.
Cement pointing in 1:2 cement, sand mortar on brick masonry including cost of all materials labour T&P etc. required for praper for completion of work.
Providing and fixing of 150 mm dia HDPE 6 kg/m² pressure Pipe Avg. = (12.00+8.00)/2= 10.00
Providing and Laying 600 mm dia RCC Hume pipe NP-3 including cost of labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Centering and shuttering of R.C.C. work including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Supplying & fixing 20mm thick joint filler board including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
S/L 3mm thick multi-plast Poly Plus Tar paper including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Reinforcement of RCC work including cost of steel, cutting, bending, placing in position & binding with 16 gauge binding wire including cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Cement concrete M-15 1:2:4 in foundation including cost of all material and labour T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
Providing and laying C.C.(1:1.5:3)with coarse sand cement and 10mm to 20mm crushed stone grite including cost of material, labour, T&Petc.
Colour washing of two coat of parapet including cost of all materials,labour and T&P etc.
Fixing wheel guard stone inclding cost of all of all materials, labours and T&P etc.
E/W in embankment for restoration of canal section on VRB Nearby in all type of soil mixed including all lead ,lift dressing , etc.
E/W Dismentaling of diversion including all lead & lift, cost of all labour, material, T&P etc. for proper completion of work as per direction of Engineer-in-Charge.
Dry stone boulder Pitching 200mm thick , filling joint with sand including cost of all type of labour, material, T&P etc. for proper completion of work as per direction of in- charge.
Fixing of RCC Precast Boundry piller including cost of all materials, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge.
Painting of RCC Precast boundry piller size 250x250x900 (mm) including cost of material, labour, T&Petc. proper completion of work as per direction of Engineer-in-charge.
Providing mate / superviser for watching and warding of work as per direction of Engineer in charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_2095256.xls
BOQ • 0.33 MB
TosDOC.pdf
Tender Documents • 2.60 MB
Download all tender documents and submit your bid