Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance 2324 KARADUMADAM PUNGAMUTHUR ANANIMALAI UDUMALAI | ARIYALUR | TAMIL NADU | 608703 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Price Bid not complied |
Tender Value
₹22.4 L
EMD Value
₹22,500
Closing Date
16 Feb 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
the bdo bp tkm
the bdo bp tkm
Renewal BT at Kondakarikuppam to annamalaiputheri 0 0 1 2 R 163 in Nallathur Panchayat at Thirukazhukundram Panchayat Union
2026_RDTN_655080_1
2614/2025/a13
Open Tender
Civil Works - Others
Works
Renewal BT at Kondakarikuppam to annamalaiputheri
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹22,500
Yes
16 Feb 2026
11 Feb 2026
16 Feb 2026
11 Feb 2026
16 Feb 2026
11 Feb 2026
Clearing the Scrub Jungle including removing from the site disposal by burying or burying etc.complete
Earth work exavation in all classes of soils such as Hard Soil , etc. and depositing on berms with all leads and lifts and all other incidential charges. etc., complete for berms.Asper SS20B
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as
Providing and laying of Bituminous Concrete for Speed Breakers using 60/70 grade bitumen which shall consist of construction of a single course binder/ wearing course on a previously prepared bituminous base to the requirements of the specification using CMP, Paver & Power roller as per standard specification clause 508 of MORT & H.
Filling gravel for shoulders and berms including all cost and conveyance of all materials to site and stacking them to departmental guage for premeasurements and labour charges for filling etc., complete
Filling gravel for shoulders and berms including all cost and conveyance of all materials to site and stacking them to departmental guage for premeasurements and labour charges for filling etc., complete
Providing and laying of Hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads @ 250 gms, per sq.m. area thickness of 2.50mm is exclusive of surface applied glass beads as per IRC :35. The finished surface to be level, uniform and free from streaks and holes etc, complete(as per MoRTH specification No. 804
a.90 cm Equilateral triangle cautionary signboard
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}18%
finance_785421.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
BOQ_785421.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .