Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.2 CrAdmitted-Finance | ₹11.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹11.6 Cr+₹35.7 L (3.19%)Admitted-Finance 223 3 E B 1 MALTI TOWER TARABAI PARK KOLHAPUR 416 003 | KOLHAPUR | KOLHAPUR | MAHARASHTRA | 416003 | ₹11.6 Cr+₹35.7 L (3.19%) | L2 | Admitted-Finance |
| 3 | L3₹13.3 Cr+₹2.1 Cr (19.1%)Admitted-Finance BHAPKAR PATIL PLOT NO 24 GURHSHIP HOUSING SOCIETY SATBHAL MALA DEHIGATE AHMEDNAGAR 414001 | AHMEDNAGAR | AHMEDNAGAR | MAHARASHTRA | 414001 | ₹13.3 Cr+₹2.1 Cr (19.1%) | L3 | Admitted-Finance |
| 4 | L4₹14.9 Cr+₹3.7 Cr (33.2%)Admitted-Finance C 301 SHREE BALAJI RESIDENCY BEHIND SANGATH SILVER APARTMENT SABARMATI GANDHINAGAR HIGHWAY MOTERA AHMEDABAD 380005 | AHMEDABAD | AHMEDABAD | GUJARAT | 380005 | ₹14.9 Cr+₹3.7 Cr (33.2%) | L4 | Admitted-Finance |
| 5 | L5₹16.0 Cr+₹4.8 Cr (42.5%)Admitted-Finance | ₹16.0 Cr+₹4.8 Cr (42.5%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Kanika Construction Company L7 | Hariom Projects Pvt Ltd L4 | D R CONSTRUCTION L2 | N. H. Saluji & Associates L5 | SOOD ASSOCIATES PVT LTD L8 | M/s S. R. Constructions L3 | sri vijetha engineers and infrastructure private limited L1 | Arun Kumar Deedwania L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Schedule 'A' Part - I BUILDINGS & STRUCTURES This Schedule contains Sl item No. 1.01 to 1.03 which are not prepriced by MES and the prepriced rate indicated in Col - 5 as `0.00 indicates this fact only. The tenderer is required to quote their rates in Column 6. | |||||||||||
| 1.01 | Lumpsum price worked out by the contractor for Construction of block of 16 unit Married Accommodation for Student Officers, Major and above, Ground + four storey's including Servant quarters, Car parking, Officers Water Tank, Servant Water Tank and Fire Water Tank with RCC framed structure including all fittings and fixtures complete all as specified and as shown on drawings. | 1 | EACH BLOCK | 12,50,00,000 ₹12,50,00,000 | 10,40,00,000 ₹10,40,00,000 | 9,78,50,000 ₹9,78,50,000 | 12,18,53,000 ₹12,18,53,000 | 11,70,77,077 ₹11,70,77,077 | 10,00,00,000 ₹10,00,00,000 | 8,20,00,000 ₹8,20,00,000 Lowest | 11,75,00,000 ₹11,75,00,000 |
| 1.02 | Lumpsum price worked out by the contractor for Construction of RCC Septic tank of 100 users including all fittings and fixtures complete all as specified and as shown on drawings. | 2 | EACH JOB | 8,00,000 ₹16,00,000 | 15,00,000 ₹30,00,000 | 3,00,000 ₹6,00,000 Lowest | 12,53,000 ₹25,06,000 | 10,77,077 ₹21,54,154 | 10,00,000 ₹20,00,000 | 6,00,000 ₹12,00,000 | 12,00,000 ₹24,00,000 |
| 1.03 | Lumpsum price worked out by the contractor for Soakage well of 3.60metre dia and 4.50metre deep including all fittings and fixtures complete all as specified and as shown on drawings. | 4 | EACH JOB | 50,000 ₹2,00,000 | 5,00,000 ₹20,00,000 | 30,000 ₹1,20,000 Lowest | 3,90,000 ₹15,60,000 | 3,77,077 ₹15,08,308 | 1,00,000 ₹4,00,000 | 2,00,000 ₹8,00,000 | 6,00,000 ₹24,00,000 |
| 2.00 | Lumpsum price worked out by the Contractor for "SITE CLEARANCE AND DEVELOPMENT” as listed in Schedule ‘A’ Part - II representing _______% ___________ percent Above / Below the lumpsum price of `22,37,948.43 inserted by the MES in Schedule ‘A’ Part - II | 1 | LUMPSUM | 16,78,461.32 ₹16,78,461.32 | 40,00,000 ₹40,00,000 | 17,00,000 ₹17,00,000 | 13,20,389.57 ₹13,20,389.57 Lowest | 22,37,948.43 ₹22,37,948.43 | 18,00,000 ₹18,00,000 | 22,40,000 ₹22,40,000 | 24,39,363.78 ₹24,39,363.78 |
| 3.00 | Lumpsum price worked out by the Contractor for “ROAD / PATH / CULVERT” as listed in Schedule ‘A’ Part - III representing __________% __________________ percent Above / Below the lumpsum price of `35,48,287.26 inserted by the MES in Schedule 'A' Part - III | 1 | LUMPSUM | 46,12,773.43 ₹46,12,773.43 | 65,00,000 ₹65,00,000 | 30,00,000 ₹30,00,000 Lowest | 41,86,978.97 ₹41,86,978.97 | 41,51,496.09 ₹41,51,496.09 | 31,00,000 ₹31,00,000 | 36,00,000 ₹36,00,000 | 64,22,399.94 ₹64,22,399.94 |
| 4.00 | Lumpsum price worked out by the Contractor for “AREA DRAINAGE” as listed in Schedule ‘A’ Part - IV representing ________ % _________________ percent Above / Below the lumpsum price of `6,73,987.36 inserted by the MES in Schedule ‘A’ Part - IV | 1 | LUMPSUM | 7,41,386.09 ₹7,41,386.09 | 6,73,987.36 ₹6,73,987.36 | 4,50,000 ₹4,50,000 Lowest | 6,13,328.5 ₹6,13,328.5 | 7,21,166.48 ₹7,21,166.48 | 7,00,000 ₹7,00,000 | 7,00,000 ₹7,00,000 | 7,95,305.08 ₹7,95,305.08 |
| 5.00 | Lumpsum price worked out by the Contractor for “SEWAGE DISPOSAL” as listed in Schedule ‘A’ Part - V representing ___________ % _____________________ percent Above / Below the lumpsum price of `3,56,310.42 inserted by the MES in Schedule ‘A’ Part - V | 1 | LUMPSUM | 4,09,756.98 ₹4,09,756.98 | 3,56,310.42 ₹3,56,310.42 | 3,00,000 ₹3,00,000 Lowest | 4,06,193.88 ₹4,06,193.88 | 3,81,252.15 ₹3,81,252.15 | 4,00,000 ₹4,00,000 | 3,60,000 ₹3,60,000 | 4,52,514.23 ₹4,52,514.23 |
| 6.00 | Lumpsum price worked out by the Contractor for “SECURITY FENCING AND GATE” as listed in Schedule ‘A’ Part - VI representing ________ % _________________ percent Above / Below the lumpsum price of `10,49,959.23 inserted by the MES in Schedule ‘A’ Part - VI | 1 | LUMPSUM | 13,12,449.03 ₹13,12,449.03 | 20,00,000 ₹20,00,000 | 10,00,000 ₹10,00,000 Lowest | 11,96,953.52 ₹11,96,953.52 | 11,23,456.38 ₹11,23,456.38 | 12,50,000 ₹12,50,000 | 10,00,000 ₹10,00,000 Lowest | 12,70,450.66 ₹12,70,450.66 |
| 7.00 | Lumpsum price worked out by the Contractor for “INTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part - VII representing ________ % _________________ percent Above / Below the lumpsum price of `4,10,622.88 inserted by the MES in Schedule ‘A’ Part - VII | 1 | LUMPSUM | 5,74,872.03 ₹5,74,872.03 | 5,00,000 ₹5,00,000 | 2,50,000 ₹2,50,000 Lowest | 6,28,253.01 ₹6,28,253.01 | 3,81,879.28 ₹3,81,879.28 | 4,50,000 ₹4,50,000 | 4,15,000 ₹4,15,000 | 5,95,403.17 ₹5,95,403.17 |
Tender Value
₹13.3 Cr
EMD Value
₹9.9 L
Closing Date
7 Aug 2026, 6:55 pmClosed
CHIEF ENGINEER RND SECUNDERABAD
CHIEF ENGINEER RND SECUNDERABAD OPP JUBILEE BUS STATION PICKET SECUNDERABAD 500003
PROVISION OF DEFICIENT 16 UNIT MD ACCN FOR STUDENT OFFRS MAJOR AND ABOVE AT MILIT GIRINAGAR, PUNE
2026_MES_750221_1
85334
Open Tender
Civil Works
Lump-sum
365 days
GIRINAGAR PUNE
Class S
category a(i)
8 documents required · 8 mandatory
₹3,000
GARRISON ENGINEER I RND GIRINAGAR PUNE
₹9.9 L
Yes
27 Aug 2026
28 Jan 2026
10 Aug 2026
30 May 2026
7 Aug 2026
24 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Schedule 'A' Part - I BUILDINGS & STRUCTURES This Schedule contains Sl item No. 1.01 to 1.03 which are not prepriced by MES and the prepriced rate indicated in Col - 5 as `0.00 indicates this fact only. The tenderer is required to quote their rates in Column 6. | |||||
| - | Lumpsum price worked out by the contractor for Construction of block of 16 unit Married Accommodation for Student Officers, Major and above, Ground + four storey's including Servant quarters, Car parking, Officers Water Tank, Servat Water Tank and Fire Water Tank with RCC framed structure in permanent specification including all fittings and fixtures complete all as specified and as shown on drawings. | 1 | EACH BLOCK | - | - |
| - | Lumpsum price worked out by the contractor for Construction of Septic tank of 100users in Brick Masonry including all fittings and fixtures complete all as specified and as shown on drawings. | 2 | EACH JOB | - | - |
| - | Lumpsum price worked out by the contractor for Soakage well of 3.60metre dia and 4.50metre deep including all fittings and fixtures complete all as specified and as shown on drawings. | 4 | EACH JOB | - | - |
| 2 | Lumpsum price worked out by the Contractor for "SITE CLEARANCE AND DEVELOPMENT” as listed in Schedule ‘A’ Part - II representing _______% ___________ percent Above / Below the lumpsum price of `16,21,225.77 inserted by the MES in Schedule ‘A’ Part - II | 1 | LUMPSUM | 16,21,225.77 | ₹16,21,225.77 |
| - | Lumpsum price worked out by the Contractor for “ROAD / PATH / CULVERT” as listed in Schedule ‘A’ Part - III representing _______% ____________ percent Above / Below the lumpsum price of `33,49,087.43 inserted by the MES in Schedule 'A' Part - III | 1 | LUMPSUM | 33,49,087.43 | ₹33,49,087.43 |
| - | Lumpsum price worked out by the Contractor for “AREA DRAINAGE” as listed in Schedule ‘A’ Part - IV representing __________ % ___________________ percent Above / Below the lumpsum price of `29,98,768.40 inserted by the MES in Schedule ‘A’ Part - IV | 1 | LUMPSUM | 29,98,768.4 | ₹29,98,768.4 |
| - | Lumpsum price worked out by the Contractor for “SEWAGE DISPOSAL” as listed in Schedule ‘A’ Part - V representing _______ % _______________ percent Above / Below the lumpsum price of `3,11,217.28 inserted by the MES in Schedule ‘A’ Part - V | 1 | LUMPSUM | 3,11,217.28 | ₹3,11,217.28 |
| - | Lumpsum price worked out by the Contractor for “SECURITY FENCING AND GATE” as listed in Schedule ‘A’ Part - VI representing ______% _____________ percent Above / Below the lumpsum price of `10,49,959.23 inserted by the MES in Schedule ‘A’ Part - VI | 1 | LUMPSUM | 10,49,959.23 | ₹10,49,959.23 |
| - | Lumpsum price worked out by the Contractor for “INTERNAL WATER SUPPLY” as listed in Schedule ‘A’ Part - VII representing __________% _______________ percent Above / Below the lumpsum price of `4,79,654.18 inserted by the MES in Schedule ‘A’ Part - VII | 1 | LUMPSUM | 4,79,654.18 | ₹4,79,654.18 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.52 MB
85334Tender.pdf
Tender Documents • 2.69 MB
BOQ_840283.xls
BOQ • 0.38 MB
Prepriced_Schedules_85334.pdf
Additional Documents • 0.59 MB
Drawing.rar
Additional Documents • 12.25 MB
Amendment3.pdf
PDF • 0.19 MB
Revised_Pre_priced_Schedules.pdf
PDF • 0.39 MB
85334Postponement.pdf
PDF • 0.18 MB
85334_0004.pdf
PDF • 0.07 MB
Str_WD_PN_STR_456R_2025 Sht No 01 of 13.pdf
PDF • 0.35 MB
Str_WD_PN_STR_456R_2025 Sht No 02 of 13.pdf
PDF • 0.35 MB
Str_WD_PN_STR_456R_2025 Sht No 03 of 13.pdf
PDF • 0.26 MB
Str_WD_PN_STR_456R_2025 Sht No 04 of 13.pdf
PDF • 0.39 MB
Str_WD_PN_STR_456R_2025 Sht No 05 of 13.pdf
PDF • 0.29 MB
Str_WD_PN_STR_456R_2025 Sht No 06 of 13.pdf
PDF • 0.24 MB
Str_WD_PN_STR_456R_2025 Sht No 07 of 13.pdf
PDF • 0.32 MB
Str_WD_PN_STR_456R_2025 Sht No 08 of 13.pdf
PDF • 0.32 MB
Str_WD_PN_STR_456R_2025 Sht No 09 of 13.pdf
PDF • 0.25 MB
Str_WD_PN_STR_456R_2025 Sht No 10 of 13.pdf
PDF • 0.22 MB
Str_WD_PN_STR_456R_2025 Sht No 11 of 13.pdf
PDF • 0.21 MB
Str_WD_PN_STR_456R_2025 Sht No 12 of 13.pdf
PDF • 0.24 MB
Str_WD_PN_STR_456R_2025 Sht No 13 of 13.pdf
PDF • 0.24 MB
Arch_LD_PN_43R_2025 Sht No 01 of 01.pdf
PDF • 0.24 MB
Arch_SP_PN_1499R_2025 Sht No 01 of 04.pdf
PDF • 0.89 MB
Arch_SP_PN_1499R_2025 Sht No 02 of 04.pdf
PDF • 0.78 MB
Arch_SP_PN_1499R_2025 Sht No 03 of 04.pdf
PDF • 0.79 MB
Arch_SP_PN_1499R_2025 Sht No 04 of 04.pdf
PDF • 0.86 MB
Arch_WD_PN_AR_546R_2025 Sht No 01 of 01.pdf
PDF • 0.84 MB
Arch_WD_PN_AR_546R_2025 Sht No 01 of 26.pdf
PDF • 0.92 MB
Arch_WD_PN_AR_546R_2025 Sht No 02 of 26.pdf
PDF • 0.87 MB
Arch_WD_PN_AR_546R_2025 Sht No 03 of 26.pdf
PDF • 0.93 MB
Arch_WD_PN_AR_546R_2025 Sht No 04 of 26.pdf
PDF • 0.81 MB
Arch_WD_PN_AR_546R_2025 Sht No 05 of 26.pdf
PDF • 0.79 MB
Arch_WD_PN_AR_546R_2025 Sht No 06 of 26.pdf
PDF • 0.80 MB
Arch_WD_PN_AR_546R_2025 Sht No 07 of 26.pdf
PDF • 1.13 MB
Arch_WD_PN_AR_546R_2025 Sht No 08 of 26.pdf
PDF • 1.03 MB
Arch_WD_PN_AR_546R_2025 Sht No 09 of 26.pdf
PDF • 1.05 MB
Arch_WD_PN_AR_546R_2025 Sht No 10 of 26.pdf
PDF • 0.82 MB
Arch_WD_PN_AR_546R_2025 Sht No 11 of 26.pdf
PDF • 0.82 MB
Arch_WD_PN_AR_546R_2025 Sht No 12 of 26.pdf
PDF • 1.16 MB
Arch_WD_PN_AR_546R_2025 Sht No 13 of 26.pdf
PDF • 1.60 MB
Arch_WD_PN_AR_546R_2025 Sht No 14 of 26.pdf
PDF • 1.04 MB
Arch_WD_PN_AR_546R_2025 Sht No 15 of 26.pdf
PDF • 1.04 MB
Arch_WD_PN_AR_546R_2025 Sht No 16 of 26.pdf
PDF • 1.70 MB
Arch_WD_PN_AR_546R_2025 Sht No 17 of 26.pdf
PDF • 1.12 MB
Arch_WD_PN_AR_546R_2025 Sht No 18 of 26.pdf
PDF • 1.00 MB
Arch_WD_PN_AR_546R_2025 Sht No 19 of 26.pdf
PDF • 0.92 MB
Arch_WD_PN_AR_546R_2025 Sht No 20 of 26.pdf
PDF • 1.03 MB
Arch_WD_PN_AR_546R_2025 Sht No 21 of 26.pdf
PDF • 1.25 MB
Arch_WD_PN_AR_546R_2025 Sht No 22 of 26.pdf
PDF • 1.08 MB
Arch_WD_PN_AR_546R_2025 Sht No 23 of 26.pdf
PDF • 1.11 MB
Arch_WD_PN_AR_546R_2025 Sht No 24 of 26.pdf
PDF • 1.28 MB
Arch_WD_PN_AR_546R_2025 Sht No 25 of 26.pdf
PDF • 1.27 MB
Arch_WD_PN_AR_546R_2025 Sht No 26 of 26.pdf
PDF • 1.17 MB
RevisedPrepricedSchedule_85334.pdf
PDF • 0.39 MB
Amendment1.pdf
PDF • 0.45 MB
85334Postponement.pdf
PDF • 0.18 MB
85334Postponement.pdf
PDF • 0.18 MB
85334Postponement.pdf
PDF • 0.18 MB
85334Postponement.pdf
PDF • 0.18 MB
85334Postponement.pdf
PDF • 0.47 MB
85334Postponement.pdf
PDF • 0.18 MB
85334Postponement.pdf
PDF • 0.18 MB
85334Postponement.pdf
PDF • 0.18 MB
85334Postponement.pdf
PDF • 0.18 MB
85334Postponement.pdf
PDF • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .