Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹5.6 L+₹76,228.95 (15.6%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹6.8 L+₹1.9 L (38.7%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹6.9 L+₹2.0 L (41.7%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹7.0 L+₹2.1 L (43.4%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S SUMAN ENTERPRISES L1 | M/s Prince Construction L2 | M/S RINKU CONTRACTOR L3 | SON VIR L4 | VISHWAKARMA ELITE CONSTRUX L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in silt clearance including lift up to 1.5 M and lead upto 30 M including ramming and dressing by manual labour or machine. the earth from clearance to be used in side embankment or to be disposed off spoil banks or as directed by Engineer-in-chaarge in Dys. and Minors. | 8,117 | Cum | 42.65 ₹3,46,190.05 Lowest | 59 ₹4,78,903 | 60 ₹4,87,020 | 62 ₹5,03,254 | 75 ₹6,08,775 |
| 2.00 | Earth work in silt clearance including lift up to 1.5 M and lead upto 1 KM including ramming and dressing by manual labour or machine. the earth from clearance to be used in side embankment or to be disposed off spoil banks or as directed by Engineer-in-chaarge in Dys. and Minors. | 955 | Cum | 127.3 ₹1,21,571.5 | 47 ₹44,885 Lowest | 165 ₹1,57,575 | 163 ₹1,55,665 | 75 ₹71,625 |
| 3.00 | Scrapping internal section of existing channel i.e. Bed and Slope | 8,081 | Sqm | 2.5 ₹20,202.5 | 5 ₹40,405 | 4 ₹32,324 | 4 ₹32,324 | 2.4 ₹19,394.4 Lowest |
Tender Value
₹7.3 L
EMD Value
₹14,560
Closing Date
6 Oct 2026, 4:55 pmClosed
EE BGGC BSR
EE BGGC BSR
SILT CLEARANCE OF VEERPURA DY. FROM KM 0.000 TO KM 14.803
2026_UPIDC_1188144_37
04/EE/2026-27
Open Tender
Civil Works
Item Rate
30 days
Bulandshahr
Please refer Tender documents.
2 documents required · 2 mandatory
₹266
₹14,560
9 Oct 2026
1 Oct 2026
6 Oct 2026
1 Oct 2026
6 Oct 2026
1 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in silt clearance including lift up to 1.5 M and lead upto 30 M including ramming and dressing by manual labour or machine. the earth from clearance to be used in side embankment or to be disposed off spoil banks or as directed by Engineer-in-chaarge in Dys. and Minors. | 8,117 | Cum | - | - |
| 2 | Earth work in silt clearance including lift up to 1.5 M and lead upto 1 KM including ramming and dressing by manual labour or machine. the earth from clearance to be used in side embankment or to be disposed off spoil banks or as directed by Engineer-in-chaarge in Dys. and Minors. | 955 | Cum | - | - |
| 3 | Scrapping internal section of existing channel i.e. Bed and Slope | 8,081 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.90 MB
BOQ_2248985.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .