Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.6 L+₹14,102.40 (9.73%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹1.6 L+₹15,691.12 (10.8%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹1.7 L+₹27,459.46 (18.9%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹1.7 L+₹29,636.61 (20.4%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.0 L
EMD Value
₹5,880
Closing Date
12 Oct 2026, 3:00 pmClosed
EXECUTIVE ENGINEER REW KUPWARA
EXECUTIVE ENGINEER REW KUPWARA
CONSTRUCTION OF R WALL FROM HOUSE OF GH NABI MIR ONWARDS AT BUNGAM POHRUPETH
2026_RDPR_327182_13
NIT NO 129 OF 2026-27 ADF CDF GENERAL
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW KUPWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EXECUTIVE ENGINEER REW KUPWARA
₹5,880
14 Oct 2026
6 Oct 2026
12 Oct 2026
6 Oct 2026
12 Oct 2026
6 Oct 2026
6 Oct 2026 - 6 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed. | 10.26 | Cum | 479.3 | ₹4,917.62 |
| 2 | P/L of dry stone soling hand packed tightly incl all carriages complete & head load | 8.55 | Cum | 1,200 | ₹10,260 |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns etc. for mass concrete. | 114 | SqMtr | 286.35 | ₹32,643.9 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 20.52 | Cum | 5,733.6 | ₹1,17,653.47 |
| 5 | Providing and lying in position reinforced cement concrete of specified grade excluding the cost of centring and shuttering- all works upto plinth level. 1 cement :1.5 coarse sand: 3graded, stone aggregates 20mm size crushed Stone Aggregate.1:1.5:3 | 1.1 | cum | 7,788.4 | ₹8,598.39 |
| 6 | Steel reinforcement of rcc work including straightening cutting placing in position bending including complete job | 77.28 | kg | 115.55 | ₹8,929.7 |
| 7 | Carriage of Sand/ aggregate for an avg lead of 25 kms vide item 4 and 5 | 30.58 | Cum | 409.94 | ₹12,535.97 |
| 8 | provision for signboard/photograph | 1 | No | 600 | ₹600 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.23 MB
BOQ_1106909.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .