| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAccepted-Finance 114 B A GRAND TRUNK ROAD RAJAR BAGAN BAIDYABATI HOOGHLY BAIDYABATI 712222 | BAIDYABATI | HOOGHLY | WEST BENGAL | 712222 | ₹2.1 L | L1 | Accepted-Finance L1 |
| 2 | L2₹2.2 L+₹6,613 (3.14%)Rejected-Finance 85 AJAY NAGAR COLONY DUMDUM KOLKATA 700074 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700074 | ₹2.2 L+₹6,613 (3.14%) | L2 | Rejected-Finance L2 |
| 3 | L3₹2.2 L+₹11,226 (5.33%)Rejected-Finance BHWABINIPUR KHARAGPUR | KHARAGPUR | PASCHIM MEDINIPUR | WEST BENGAL | 721305 | ₹2.2 L+₹11,226 (5.33%) | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical 6G SURAH 2ND LANE KOLKATA WB 700010 | KOLKATA | WEST BENGAL | 700010 | - | - | Rejected-Technical Technically Not Qualified |
Tender Value
₹2.1 L
EMD Value
₹4,300
Closing Date
27 Feb 2026, 1:00 pmClosed
Executive Engineer_Park_and_Square
5, S N Banerjee Road, Kolkata-700013
REGULAR MAINTENANCE OF ROAD SIDE GARDENS ALONG WITH MINOR REPAIRING WORKS AT KAVYBHARATI SARANI, DR. SARAT CHATTERJEE ROAD,LAKE TERRACE AND RAJA BASANTA ROY ROAD IN WARD NO. 090, BR-VIII (FOR 365 DAYS)
2026_KMC_1010286_1
KMC/EE/PS/VIII/90/2/2025-26
Open Tender
CIVIL WORKS
Percentage
365 days
Kolkata
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹4,300
8 Jul 2026
19 Feb 2026
2 Mar 2026
19 Feb 2026
27 Feb 2026
19 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. | 730 | EA | 269.5 | ₹1,96,735 |
| 2 | BUILDING WORKS. (T)MISCELLANEOUS WORKS: A. SPECIAL WORKS. I. HORTICULTURE: 1. Supplying and stacking of good earth (adequate for horticulture work) at site including royalty (earth measured in stack will be reduced by 20% for payment) | 12 | M3 | 306 | ₹3,672 |
| 3 | BUILDING WORKS. (T)MISCELLANEOUS WORKS: A. SPECIAL WORKS. I. HORTICULTURE: 9) Supplying and Planting of different plant / trees ( Supplying well grown plants bushy and healthy, minimum height as specified i.e. exposed height including all leads & lift, carriage, handling, manuring, applying presticide and fertilizer etc. xxii) Croton different varieties of height 30 cm to 90 cm in earthen pots of size 20 cm. | 50 | EA | 64 | ₹3,200 |
| 4 | BUILDING WORKS. (T)MISCELLANEOUS WORKS: A. SPECIAL WORKS. I. HORTICULTURE: 9) Supplying and Planting of different plant / trees ( Supplying well grown plants bushy and healthy, minimum height as specified i.e. exposed height including all leads & lift, carriage, handling, manuring, applying presticide and fertilizer etc. iv) Rangon hi-breed healthy plant. | 30 | EA | 23 | ₹690 |
| 5 | BUILDING WORKS. (T)MISCELLANEOUS WORKS: A. SPECIAL WORKS. I. HORTICULTURE: 9) Supplying and Planting of different plant / trees ( Supplying well grown plants bushy and healthy, minimum height as specified i.e. exposed height including all leads & lift, carriage, handling, manuring, applying presticide and fertilizer etc. i) Furcaria veriegated 10-12 leaves in height 20-30cm in earthen pots of size 25cm. | 6 | EA | 162 | ₹972 |
| 6 | BUILDING WORKS. (T)MISCELLANEOUS WORKS: A. SPECIAL WORKS. I. HORTICULTURE: 9) Supplying and Planting of different plant / trees ( Supplying well grown plants bushy and healthy, minimum height as specified i.e. exposed height including all leads & lift, carriage, handling, manuring, applying presticide and fertilizer etc. v) Duranta goldianna of size not less than 20cm | 100 | EA | 15 | ₹1,500 |
| 7 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (a) 20 mm thick plaster | 10 | SQM | 186 | ₹1,860 |
| 8 | SECTION 1. ------------BUILDING WORKS (J)WHITE WASH, COLOUR WASH, DISTEMPER A. ORIGINAL WORKS 8 Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured (matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. In Ground Floor:(a) One Coat [This item to be done under specific instruction of the Superintending Engineer]N.B.:-Extra for each additional floor in external walls refer item 1 of subhead C | 0.15 | %SQ | 3,140 | ₹471 |
| 9 | SECTION 1. ------------BUILDING WORKS (J)WHITE WASH, COLOUR WASH, DISTEMPER A. ORIGINAL WORKS 16.Protective and Decorative Textured exterior high class matt finish paint of approved quality, composed of special Tharmoplastic Resin containing fine crystalline additives derive from Granite as per manufacturer's specification and as per direction of EIC to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer. In Ground floor Two Coat N.B. This item is to be selected only with written permission of Superintending Engineer for very resticted and small areas of a building. | 15 | SQM | 101 | ₹1,515 |
| 94 | Estimated amount | - | - | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
Ten_Doc.pdf
Tender Documents • 0.98 MB
SPE_CON.pdf
Additional Documents • 0.47 MB
Ten_and_dec.pdf
Additional Documents • 0.55 MB
BOQ_2480611.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .